30套
房样板间和房子装修流程
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with