菱形天线制作方法
菱形天线制作方法,DIY无线天线
集,TP-WN321G+改SMA接口
近来见不少坛友玩天线,本人奉上收集到的资料以供参考
090313更新多两个例子,增加TP-WN321G+新版改SMA及TL-WN321G馈线连接方式
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
注意线头的连接方式(接地和芯线)
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
推荐使用直径1.5MM的铜芯
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
最后天线用热熔胶固定在中心基座就可以了(注意与反射板的平行)
PS:天线不是越大越好~正确的是越精确越好,双棱、多棱天线的棱形边长=1/4波长,
2.4G的波长是12.5MM.一般我们常用的6频道好象是2437MHZ吧,所以边长大于31mm
一点点就好了
例子2
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
例子3——双菱叠加
叠双菱振子
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
焊好馈线的振子
用刻录盘盒制作基座及反射板
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
装配好的叠双菱天线
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
TP-LINK TL-WN321G加馈线
这网卡有很多人有,这是某高手增加馈线后的图,注意连接方式,至于图中散热则可以按自
己需要去搞
DIY有风险,请阁下注意
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
TP-WN321G+新版加装SMA接口
1、割断三处,按图焊接
2、用万表测试中心线和接地外壳不能接通。天线芯线脚附近的电容,可以拿掉,效果会更好
打开屏蔽层看看天线的走线上是否还有电容,如果有,这个电容可以去掉。最好是留一个电容,因为如果没有电容会出现驻波比过大的情况,导致信号时好时坏,信号的变化也是莫名其妙的。留最后一个靠近芯片的那个电容
原网卡中在天线回路中背面串了一个电容(估计用来偶合),正面串了一个小电阻(估计用来阻抗匹配保证输出阻抗为50欧姆的),准备试一下,加大偶合电容为1000PUF,因对WIFI 的2.4G频率交流几呼是直联了,直流不能直联否则可能造成短路烧网卡,输出电阻是可以短路试验的,只要输出信号提高就可以
再一次提醒,改造有风险,请自己小心
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use