世界顶级酒店(图文)描述
美国 拉斯维加斯
Bellagio (贝拉吉奥酒店)
than ? 5mm; elevation deviation was less than ? 5mm work surface height difference is not more than 3mm on the one end to the other end; wrong tooth at the joint is less than 1mm. Side rail mounting: side rail installation take each side rail on two points. During the installation process, use tensioner to adjust the side rail. Side rail hole top center within the scope of the work is less than +2~-1mm, scope of work at a 4-to-2; wrong tooth less than 1mm at the joint work surface flatness 2mm lateral curvature RADIUS is less than ? 5mm sealing plate surface distortion is less than 1mm. Reinforcement process of adjustment is completed, in order to prevent tank deformation or displacement, welded tank side of the door, then welded reinforcing side, lap length is not less than 100mm. Door installation: the lintel the installation focuses on family Center sill plane distance h is less than ? 3mm; work surface flatness of less than 2mm; combination of surface dislocation is less than 0.5mm surface distortion is less than 1.5mm. Mode with the side rail. Grid slot bi-directional gate leaf on a car lift and lower grille blade adjustment is completed with pin connection, then try connecting rod. After you check the accessories complete the fastening, hanging out the bottom opening and closing test in still water as a whole. 8.2.3 tainter and hinge installation Setup: Pivot fixed bearing installation ? orbit stitching, alignment ? arm splicing, installation connected with the headstock ? ? ? welding door leaf side connecting plates welded, water seal installation ? clean, and wipe off. 8.2.3.1 hinge installation and
ARIA Resort & Casino at CityCenter Las Vegas (拉斯维加斯市中心艾莉亚赌场度假酒店)
than ? 5mm; elevation deviation was less than ? 5mm work surface height difference is not more than 3mm on the one end to the other end; wrong tooth at the joint is less than 1mm. Side rail mounting: side rail installation take each side rail on two points. During the installation process, use tensioner to adjust the side rail. Side rail hole top center within the scope of the work is less than +2~-1mm, scope of work at a 4-to-2; wrong tooth less than 1mm at the joint work surface flatness 2mm lateral curvature RADIUS is less than ? 5mm sealing plate surface distortion is less than 1mm. Reinforcement process of adjustment is completed, in order to prevent tank deformation or displacement, welded tank side of the door, then welded reinforcing side, lap length is not less than 100mm. Door installation: the lintel the installation focuses on family Center sill plane distance h is less than ? 3mm; work surface flatness of less than 2mm; combination of surface dislocation is less than 0.5mm surface distortion is less than 1.5mm. Mode with the side rail. Grid slot bi-directional gate leaf on a car lift and lower grille blade adjustment is completed with pin connection, then try connecting rod. After you check the accessories complete the fastening, hanging out the bottom opening and closing test in still water as a whole. 8.2.3 tainter and hinge installation Setup: Pivot fixed bearing installation ? orbit stitching, alignment ? arm splicing, installation connected with the headstock ? ? ? welding door leaf side connecting plates welded, water seal installation ? clean, and wipe off. 8.2.3.1 hinge installation and
The Cosmopolitan of Las Vegas (拉斯维加斯大都会酒店)
than ? 5mm; elevation deviation was less than ? 5mm work surface height difference is not more than 3mm on the one end to the other end; wrong tooth at the joint is less than 1mm. Side rail mounting: side rail installation take each side rail on two points. During the installation process, use tensioner to adjust the side rail. Side rail hole top center within the scope of the work is less than +2~-1mm, scope of work at a 4-to-2; wrong tooth less than 1mm at the joint work surface flatness 2mm lateral curvature RADIUS is less than ? 5mm sealing plate surface distortion is less than 1mm. Reinforcement process of adjustment is completed, in order to prevent tank deformation or displacement, welded tank side of the door, then welded reinforcing side, lap length is not less than 100mm. Door installation: the lintel the installation focuses on family Center sill plane distance h is less than ? 3mm; work surface flatness of less than 2mm; combination of surface dislocation is less than 0.5mm surface distortion is less than 1.5mm. Mode with the side rail. Grid slot bi-directional gate leaf on a car lift and lower grille blade adjustment is completed with pin connection, then try connecting rod. After you check the accessories complete the fastening, hanging out the bottom opening and closing test in still water as a whole. 8.2.3 tainter and hinge installation Setup: Pivot fixed bearing installation ? orbit stitching, alignment ? arm splicing, installation connected with the headstock ? ? ? welding door leaf side connecting plates welded, water seal installation ? clean, and wipe off. 8.2.3.1 hinge installation and
than ? 5mm; elevation deviation was less than ? 5mm work surface height difference is not more than 3mm on the one end to the other end; wrong tooth at the joint is less than 1mm. Side rail mounting: side rail installation take each side rail on two points. During the installation process, use tensioner to adjust the side rail. Side rail hole top center within the scope of the work is less than +2~-1mm, scope of work at a 4-to-2; wrong tooth less than 1mm at the joint work surface flatness 2mm lateral curvature RADIUS is less than ? 5mm sealing plate surface distortion is less than 1mm. Reinforcement process of adjustment is completed, in order to prevent tank deformation or displacement, welded tank side of the door, then welded reinforcing side, lap length is not less than 100mm. Door installation: the lintel the installation focuses on family Center sill plane distance h is less than ? 3mm; work surface flatness of less than 2mm; combination of surface dislocation is less than 0.5mm surface distortion is less than 1.5mm. Mode with the side rail. Grid slot bi-directional gate leaf on a car lift and lower grille blade adjustment is completed with pin connection, then try connecting rod. After you check the accessories complete the fastening, hanging out the bottom opening and closing test in still water as a whole. 8.2.3 tainter and hinge installation Setup: Pivot fixed bearing installation ? orbit stitching, alignment ? arm splicing, installation connected with the headstock ? ? ? welding door leaf side connecting plates welded, water seal installation ? clean, and wipe off. 8.2.3.1 hinge installation and
美国 纽约
Mondrian Soho (蒙德里安休南酒店)
than ? 5mm; elevation deviation was less than ? 5mm work surface height difference is not more than 3mm on the one end to the other end; wrong tooth at the joint is less than 1mm. Side rail mounting: side rail installation take each side rail on two points. During the installation process, use tensioner to adjust the side rail. Side rail hole top center within the scope of the work is less than +2~-1mm, scope of work at a 4-to-2; wrong tooth less than 1mm at the joint work surface flatness 2mm lateral curvature RADIUS is less than ? 5mm sealing plate surface distortion is less than 1mm. Reinforcement process of adjustment is completed, in order to prevent tank deformation or displacement, welded tank side of the door, then welded reinforcing side, lap length is not less than 100mm. Door installation: the lintel the installation focuses on family Center sill plane distance h is less than ? 3mm; work surface flatness of less than 2mm; combination of surface dislocation is less than 0.5mm surface distortion is less than 1.5mm. Mode with the side rail. Grid slot bi-directional gate leaf on a car lift and lower grille blade adjustment is completed with pin connection, then try connecting rod. After you check the accessories complete the fastening, hanging out the bottom opening and closing test in still water as a whole. 8.2.3 tainter and hinge installation Setup: Pivot fixed bearing installation ? orbit stitching, alignment ? arm splicing, installation connected with the headstock ? ? ? welding door leaf side connecting plates welded, water seal installation ? clean, and wipe off. 8.2.3.1 hinge installation and
The Setai Fifth Avenue (斯台第五大道酒店)
than ? 5mm; elevation deviation was less than ? 5mm work surface height difference is not more than 3mm on the one end to the other end; wrong tooth at the joint is less than 1mm. Side rail mounting: side rail installation take each side rail on two points. During the installation process, use tensioner to adjust the side rail. Side rail hole top center within the scope of the work is less than +2~-1mm, scope of work at a 4-to-2; wrong tooth less than 1mm at the joint work surface flatness 2mm lateral curvature RADIUS is less than ? 5mm sealing plate surface distortion is less than 1mm. Reinforcement process of adjustment is completed, in order to prevent tank deformation or displacement, welded tank side of the door, then welded reinforcing side, lap length is not less than 100mm. Door installation: the lintel the installation focuses on family Center sill plane distance h is less than ? 3mm; work surface flatness of less than 2mm; combination of surface dislocation is less than 0.5mm surface distortion is less than 1.5mm. Mode with the side rail. Grid slot bi-directional gate leaf on a car lift and lower grille blade adjustment is completed with pin connection, then try connecting rod. After you check the accessories complete the fastening, hanging out the bottom opening and closing test in still water as a whole. 8.2.3 tainter and hinge installation Setup: Pivot fixed bearing installation ? orbit stitching, alignment ? arm splicing, installation connected with the headstock ? ? ? welding door leaf side connecting plates welded, water seal installation ? clean, and wipe off. 8.2.3.1 hinge installation and
than ? 5mm; elevation deviation was less than ? 5mm work surface height difference is not more than 3mm on the one end to the other end; wrong tooth at the joint is less than 1mm. Side rail mounting: side rail installation take each side rail on two points. During the installation process, use tensioner to adjust the side rail. Side rail hole top center within the scope of the work is less than +2~-1mm, scope of work at a 4-to-2; wrong tooth less than 1mm at the joint work surface flatness 2mm lateral curvature RADIUS is less than ? 5mm sealing plate surface distortion is less than 1mm. Reinforcement process of adjustment is completed, in order to prevent tank deformation or displacement, welded tank side of the door, then welded reinforcing side, lap length is not less than 100mm. Door installation: the lintel the installation focuses on family Center sill plane distance h is less than ? 3mm; work surface flatness of less than 2mm; combination of surface dislocation is less than 0.5mm surface distortion is less than 1.5mm. Mode with the side rail. Grid slot bi-directional gate leaf on a car lift and lower grille blade adjustment is completed with pin connection, then try connecting rod. After you check the accessories complete the fastening, hanging out the bottom opening and closing test in still water as a whole. 8.2.3 tainter and hinge installation Setup: Pivot fixed bearing installation ? orbit stitching, alignment ? arm splicing, installation connected with the headstock ? ? ? welding door leaf side connecting plates welded, water seal installation ? clean, and wipe off. 8.2.3.1 hinge installation and
美国 夏威夷
The Kahala Hotel and Resort (卡哈拉度假酒店)
than ? 5mm; elevation deviation was less than ? 5mm work surface height difference is not more than 3mm on the one end to the other end; wrong tooth at the joint is less than 1mm. Side rail mounting: side rail installation take each side rail on two points. During the installation process, use tensioner to adjust the side rail. Side rail hole top center within the scope of the work is less than +2~-1mm, scope of work at a 4-to-2; wrong tooth less than 1mm at the joint work surface flatness 2mm lateral curvature RADIUS is less than ? 5mm sealing plate surface distortion is less than 1mm. Reinforcement process of adjustment is completed, in order to prevent tank deformation or displacement, welded tank side of the door, then welded reinforcing side, lap length is not less than 100mm. Door installation: the lintel the installation focuses on family Center sill plane distance h is less than ? 3mm; work surface flatness of less than 2mm; combination of surface dislocation is less than 0.5mm surface distortion is less than 1.5mm. Mode with the side rail. Grid slot bi-directional gate leaf on a car lift and lower grille blade adjustment is completed with pin connection, then try connecting rod. After you check the accessories complete the fastening, hanging out the bottom opening and closing test in still water as a whole. 8.2.3 tainter and hinge installation Setup: Pivot fixed bearing installation ? orbit stitching, alignment ? arm splicing, installation connected with the headstock ? ? ? welding door leaf side connecting plates welded, water seal installation ? clean, and wipe off. 8.2.3.1 hinge installation and
The Royal Hawaiian, A Luxury Collection Resort (皇家夏威夷酒店)
than ? 5mm; elevation deviation was less than ? 5mm work surface height difference is not more than 3mm on the one end to the other end; wrong tooth at the joint is less than 1mm. Side rail mounting: side rail installation take each side rail on two points. During the installation process, use tensioner to adjust the side rail. Side rail hole top center within the scope of the work is less than +2~-1mm, scope of work at a 4-to-2; wrong tooth less than 1mm at the joint work surface flatness 2mm lateral curvature RADIUS is less than ? 5mm sealing plate surface distortion is less than 1mm. Reinforcement process of adjustment is completed, in order to prevent tank deformation or displacement, welded tank side of the door, then welded reinforcing side, lap length is not less than 100mm. Door installation: the lintel the installation focuses on family Center sill plane distance h is less than ? 3mm; work surface flatness of less than 2mm; combination of surface dislocation is less than 0.5mm surface distortion is less than 1.5mm. Mode with the side rail. Grid slot bi-directional gate leaf on a car lift and lower grille blade adjustment is completed with pin connection, then try connecting rod. After you check the accessories complete the fastening, hanging out the bottom opening and closing test in still water as a whole. 8.2.3 tainter and hinge installation Setup: Pivot fixed bearing installation ? orbit stitching, alignment ? arm splicing, installation connected with the headstock ? ? ? welding door leaf side connecting plates welded, water seal installation ? clean, and wipe off. 8.2.3.1 hinge installation and
Trump International Hotel Waikiki Beach Walk (特朗普威基基海滩国际酒店)
法国 巴黎
Hotel du Collectionneur Arc de Triomphe (希尔顿巴黎凯旋门酒店)
than ? 5mm; elevation deviation was less than ? 5mm work surface height difference is not more than 3mm on the one end to the other end; wrong tooth at the joint is less than 1mm. Side rail mounting: side rail installation take each side rail on two points. During the installation process, use tensioner to adjust the side rail. Side rail hole top center within the scope of the work is less than +2~-1mm, scope of work at a 4-to-2; wrong tooth less than 1mm at the joint work surface flatness 2mm lateral curvature RADIUS is less than ? 5mm sealing plate surface distortion is less than 1mm. Reinforcement process of adjustment is completed, in order to prevent tank deformation or displacement, welded tank side of the door, then welded reinforcing side, lap length is not less than 100mm. Door installation: the lintel the installation focuses on family Center sill plane distance h is less than ? 3mm; work surface flatness of less than 2mm; combination of surface dislocation is less than 0.5mm surface distortion is less than 1.5mm. Mode with the side rail. Grid slot bi-directional gate leaf on a car lift and lower grille blade adjustment is completed with pin connection, then try connecting rod. After you check the accessories complete the fastening, hanging out the bottom opening and closing test in still water as a whole. 8.2.3 tainter and hinge installation Setup: Pivot fixed bearing installation ? orbit stitching, alignment ? arm splicing, installation connected with the headstock ? ? ? welding door leaf side connecting plates welded, water seal installation ? clean, and wipe off. 8.2.3.1 hinge installation and
than ? 5mm; elevation deviation was less than ? 5mm work surface height difference is not more than 3mm on the one end to the other end; wrong tooth at the joint is less than 1mm. Side rail mounting: side rail installation take each side rail on two points. During the installation process, use tensioner to adjust the side rail. Side rail hole top center within the scope of the work is less than +2~-1mm, scope of work at a 4-to-2; wrong tooth less than 1mm at the joint work surface flatness 2mm lateral curvature RADIUS is less than ? 5mm sealing plate surface distortion is less than 1mm. Reinforcement process of adjustment is completed, in order to prevent tank deformation or displacement, welded tank side of the door, then welded reinforcing side, lap length is not less than 100mm. Door installation: the lintel the installation focuses on family Center sill plane distance h is less than ? 3mm; work surface flatness of less than 2mm; combination of surface dislocation is less than 0.5mm surface distortion is less than 1.5mm. Mode with the side rail. Grid slot bi-directional gate leaf on a car lift and lower grille blade adjustment is completed with pin connection, then try connecting rod. After you check the accessories complete the fastening, hanging out the bottom opening and closing test in still water as a whole. 8.2.3 tainter and hinge installation Setup: Pivot fixed bearing installation ? orbit stitching, alignment ? arm splicing, installation connected with the headstock ? ? ? welding door leaf side connecting plates welded, water seal installation ? clean, and wipe off. 8.2.3.1 hinge installation and
H?tel Fouquet's Barrière (巴里耶尔富凯酒店)
than ? 5mm; elevation deviation was less than ? 5mm work surface height difference is not more than 3mm on the one end to the other end; wrong tooth at the joint is less than 1mm. Side rail mounting: side rail installation take each side rail on two points. During the installation process, use tensioner to adjust the side rail. Side rail hole top center within the scope of the work is less than +2~-1mm, scope of work at a 4-to-2; wrong tooth less than 1mm at the joint work surface flatness 2mm lateral curvature RADIUS is less than ? 5mm sealing plate surface distortion is less than 1mm. Reinforcement process of adjustment is completed, in order to prevent tank deformation or displacement, welded tank side of the door, then welded reinforcing side, lap length is not less than 100mm. Door installation: the lintel the installation focuses on family Center sill plane distance h is less than ? 3mm; work surface flatness of less than 2mm; combination of surface dislocation is less than 0.5mm surface distortion is less than 1.5mm. Mode with the side rail. Grid slot bi-directional gate leaf on a car lift and lower grille blade adjustment is completed with pin connection, then try connecting rod. After you check the accessories complete the fastening, hanging out the bottom opening and closing test in still water as a whole. 8.2.3 tainter and hinge installation Setup: Pivot fixed bearing installation ? orbit stitching, alignment ? arm splicing, installation connected with the headstock ? ? ? welding door leaf side connecting plates welded, water seal installation ? clean, and wipe off. 8.2.3.1 hinge installation and
Hotel Plaza Athenee Paris (巴黎雅典娜广场酒店)
加拿大 温哥华
Pan Pacific Vancouver Hotel (泛太平洋温哥华酒店)
than ? 5mm; elevation deviation was less than ? 5mm work surface height difference is not more than 3mm on the one end to the other end; wrong tooth at the joint is less than 1mm. Side rail mounting: side rail installation take each side rail on two points. During the installation process, use tensioner to adjust the side rail. Side rail hole top center within the scope of the work is less than +2~-1mm, scope of work at a 4-to-2; wrong tooth less than 1mm at the joint work surface flatness 2mm lateral curvature RADIUS is less than ? 5mm sealing plate surface distortion is less than 1mm. Reinforcement process of adjustment is completed, in order to prevent tank deformation or displacement, welded tank side of the door, then welded reinforcing side, lap length is not less than 100mm. Door installation: the lintel the installation focuses on family Center sill plane distance h is less than ? 3mm; work surface flatness of less than 2mm; combination of surface dislocation is less than 0.5mm surface distortion is less than 1.5mm. Mode with the side rail. Grid slot bi-directional gate leaf on a car lift and lower grille blade adjustment is completed with pin connection, then try connecting rod. After you check the accessories complete the fastening, hanging out the bottom opening and closing test in still water as a whole. 8.2.3 tainter and hinge installation Setup: Pivot fixed bearing installation ? orbit stitching, alignment ? arm splicing, installation connected with the headstock ? ? ? welding door leaf side connecting plates welded, water seal installation ? clean, and wipe off. 8.2.3.1 hinge installation and
Wedgewood Hotel & Spa (韦奇伍德休闲酒店)
Rosewood Hotel Georgia (乔治亚红木酒店)
迪拜AED对RMB1:1.69
Raffles Dubai (迪拜莱福士酒店)
Dubai International Terminal Hotel(迪拜国际机场酒店)
Grosvenor House, Dubai (格罗夫纳屋酒店)
than ? 5mm; elevation deviation was less than ? 5mm work surface height difference is not more than 3mm on the one end to the other end; wrong tooth at the joint is less than 1mm. Side rail mounting: side rail installation take each side rail on two points. During the installation process, use tensioner to adjust the side rail. Side rail hole top center within the scope of the work is less than +2~-1mm, scope of work at a 4-to-2; wrong tooth less than 1mm at the joint work surface flatness 2mm lateral curvature RADIUS is less than ? 5mm sealing plate surface distortion is less than 1mm. Reinforcement process of adjustment is completed, in order to prevent tank deformation or displacement, welded tank side of the door, then welded reinforcing side, lap length is not less than 100mm. Door installation: the lintel the installation focuses on family Center sill plane distance h is less than ? 3mm; work surface flatness of less than 2mm; combination of surface dislocation is less than 0.5mm surface distortion is less than 1.5mm. Mode with the side rail. Grid slot bi-directional gate leaf on a car lift and lower grille blade adjustment is completed with pin connection, then try connecting rod. After you check the accessories complete the fastening, hanging out the bottom opening and closing test in still water as a whole. 8.2.3 tainter and hinge installation Setup: Pivot fixed bearing installation ? orbit stitching, alignment ? arm splicing, installation connected with the headstock ? ? ? welding door leaf side connecting plates welded, water seal installation ? clean, and wipe off. 8.2.3.1 hinge installation and
Burj Al Arab (迪拜帆船酒店)
than ? 5mm; elevation deviation was less than ? 5mm work surface height difference is not more than 3mm on the one end to the other end; wrong tooth at the joint is less than 1mm. Side rail mounting: side rail installation take each side rail on two points. During the installation process, use tensioner to adjust the side rail. Side rail hole top center within the scope of the work is less than +2~-1mm, scope of work at a 4-to-2; wrong tooth less than 1mm at the joint work surface flatness 2mm lateral curvature RADIUS is less than ? 5mm sealing plate surface distortion is less than 1mm. Reinforcement process of adjustment is completed, in order to prevent tank deformation or displacement, welded tank side of the door, then welded reinforcing side, lap length is not less than 100mm. Door installation: the lintel the installation focuses on family Center sill plane distance h is less than ? 3mm; work surface flatness of less than 2mm; combination of surface dislocation is less than 0.5mm surface distortion is less than 1.5mm. Mode with the side rail. Grid slot bi-directional gate leaf on a car lift and lower grille blade adjustment is completed with pin connection, then try connecting rod. After you check the accessories complete the fastening, hanging out the bottom opening and closing test in still water as a whole. 8.2.3 tainter and hinge installation Setup: Pivot fixed bearing installation ? orbit stitching, alignment ? arm splicing, installation connected with the headstock ? ? ? welding door leaf side connecting plates welded, water seal installation ? clean, and wipe off. 8.2.3.1 hinge installation and
than ? 5mm; elevation deviation was less than ? 5mm work surface height difference is not more than 3mm on the one end to the other end; wrong tooth at the joint is less than 1mm. Side rail mounting: side rail installation take each side rail on two points. During the installation process, use tensioner to adjust the side rail. Side rail hole top center within the scope of the work is less than +2~-1mm, scope of work at a 4-to-2; wrong tooth less than 1mm at the joint work surface flatness 2mm lateral curvature RADIUS is less than ? 5mm sealing plate surface distortion is less than 1mm. Reinforcement process of adjustment is completed, in order to prevent tank deformation or displacement, welded tank side of the door, then welded reinforcing side, lap length is not less than 100mm. Door installation: the lintel the installation focuses on family Center sill plane distance h is less than ? 3mm; work surface flatness of less than 2mm; combination of surface dislocation is less than 0.5mm surface distortion is less than 1.5mm. Mode with the side rail. Grid slot bi-directional gate leaf on a car lift and lower grille blade adjustment is completed with pin connection, then try connecting rod. After you check the accessories complete the fastening, hanging out the bottom opening and closing test in still water as a whole. 8.2.3 tainter and hinge installation Setup: Pivot fixed bearing installation ? orbit stitching, alignment ? arm splicing, installation connected with the headstock ? ? ? welding door leaf side connecting plates welded, water seal installation ? clean, and wipe off. 8.2.3.1 hinge installation and
than ? 5mm; elevation deviation was less than ? 5mm work surface height difference is not more than 3mm on the one end to the other end; wrong tooth at the joint is less than 1mm. Side rail mounting: side rail installation take each side rail on two points. During the installation process, use tensioner to adjust the side rail. Side rail hole top center within the scope of the work is less than +2~-1mm, scope of work at a 4-to-2; wrong tooth less than 1mm at the joint work surface flatness 2mm lateral curvature RADIUS is less than ? 5mm sealing plate surface distortion is less than 1mm. Reinforcement process of adjustment is completed, in order to prevent tank deformation or displacement, welded tank side of the door, then welded reinforcing side, lap length is not less than 100mm. Door installation: the lintel the installation focuses on family Center sill plane distance h is less than ? 3mm; work surface flatness of less than 2mm; combination of surface dislocation is less than 0.5mm surface distortion is less than 1.5mm. Mode with the side rail. Grid slot bi-directional gate leaf on a car lift and lower grille blade adjustment is completed with pin connection, then try connecting rod. After you check the accessories complete the fastening, hanging out the bottom opening and closing test in still water as a whole. 8.2.3 tainter and hinge installation Setup: Pivot fixed bearing installation ? orbit stitching, alignment ? arm splicing, installation connected with the headstock ? ? ? welding door leaf side connecting plates welded, water seal installation ? clean, and wipe off. 8.2.3.1 hinge installation and
than ? 5mm; elevation deviation was less than ? 5mm work surface height difference is not more than 3mm on the one end to the other end; wrong tooth at the joint is less than 1mm. Side rail mounting: side rail installation take each side rail on two points. During the installation process, use tensioner to adjust the side rail. Side rail hole top center within the scope of the work is less than +2~-1mm, scope of work at a 4-to-2; wrong tooth less than 1mm at the joint work surface flatness 2mm lateral curvature RADIUS is less than ? 5mm sealing plate surface distortion is less than 1mm. Reinforcement process of adjustment is completed, in order to prevent tank deformation or displacement, welded tank side of the door, then welded reinforcing side, lap length is not less than 100mm. Door installation: the lintel the installation focuses on family Center sill plane distance h is less than ? 3mm; work surface flatness of less than 2mm; combination of surface dislocation is less than 0.5mm surface distortion is less than 1.5mm. Mode with the side rail. Grid slot bi-directional gate leaf on a car lift and lower grille blade adjustment is completed with pin connection, then try connecting rod. After you check the accessories complete the fastening, hanging out the bottom opening and closing test in still water as a whole. 8.2.3 tainter and hinge installation Setup: Pivot fixed bearing installation ? orbit stitching, alignment ? arm splicing, installation connected with the headstock ? ? ? welding door leaf side connecting plates welded, water seal installation ? clean, and wipe off. 8.2.3.1 hinge installation and
香港
Kowloon Shangri-La(九龙香格里拉大酒店)
than ? 5mm; elevation deviation was less than ? 5mm work surface height difference is not more than 3mm on the one end to the other end; wrong tooth at the joint is less than 1mm. Side rail mounting: side rail installation take each side rail on two points. During the installation process, use tensioner to adjust the side rail. Side rail hole top center within the scope of the work is less than +2~-1mm, scope of work at a 4-to-2; wrong tooth less than 1mm at the joint work surface flatness 2mm lateral curvature RADIUS is less than ? 5mm sealing plate surface distortion is less than 1mm. Reinforcement process of adjustment is completed, in order to prevent tank deformation or displacement, welded tank side of the door, then welded reinforcing side, lap length is not less than 100mm. Door installation: the lintel the installation focuses on family Center sill plane distance h is less than ? 3mm; work surface flatness of less than 2mm; combination of surface dislocation is less than 0.5mm surface distortion is less than 1.5mm. Mode with the side rail. Grid slot bi-directional gate leaf on a car lift and lower grille blade adjustment is completed with pin connection, then try connecting rod. After you check the accessories complete the fastening, hanging out the bottom opening and closing test in still water as a whole. 8.2.3 tainter and hinge installation Setup: Pivot fixed bearing installation ? orbit stitching, alignment ? arm splicing, installation connected with the headstock ? ? ? welding door leaf side connecting plates welded, water seal installation ? clean, and wipe off. 8.2.3.1 hinge installation and
than ? 5mm; elevation deviation was less than ? 5mm work surface height difference is not more than 3mm on the one end to the other end; wrong tooth at the joint is less than 1mm. Side rail mounting: side rail installation take each side rail on two points. During the installation process, use tensioner to adjust the side rail. Side rail hole top center within the scope of the work is less than +2~-1mm, scope of work at a 4-to-2; wrong tooth less than 1mm at the joint work surface flatness 2mm lateral curvature RADIUS is less than ? 5mm sealing plate surface distortion is less than 1mm. Reinforcement process of adjustment is completed, in order to prevent tank deformation or displacement, welded tank side of the door, then welded reinforcing side, lap length is not less than 100mm. Door installation: the lintel the installation focuses on family Center sill plane distance h is less than ? 3mm; work surface flatness of less than 2mm; combination of surface dislocation is less than 0.5mm surface distortion is less than 1.5mm. Mode with the side rail. Grid slot bi-directional gate leaf on a car lift and lower grille blade adjustment is completed with pin connection, then try connecting rod. After you check the accessories complete the fastening, hanging out the bottom opening and closing test in still water as a whole. 8.2.3 tainter and hinge installation Setup: Pivot fixed bearing installation ? orbit stitching, alignment ? arm splicing, installation connected with the headstock ? ? ? welding door leaf side connecting plates welded, water seal installation ? clean, and wipe off. 8.2.3.1 hinge installation and
than ? 5mm; elevation deviation was less than ? 5mm work surface height difference is not more than 3mm on the one end to the other end; wrong tooth at the joint is less than 1mm. Side rail mounting: side rail installation take each side rail on two points. During the installation process, use tensioner to adjust the side rail. Side rail hole top center within the scope of the work is less than +2~-1mm, scope of work at a 4-to-2; wrong tooth less than 1mm at the joint work surface flatness 2mm lateral curvature RADIUS is less than ? 5mm sealing plate surface distortion is less than 1mm. Reinforcement process of adjustment is completed, in order to prevent tank deformation or displacement, welded tank side of the door, then welded reinforcing side, lap length is not less than 100mm. Door installation: the lintel the installation focuses on family Center sill plane distance h is less than ? 3mm; work surface flatness of less than 2mm; combination of surface dislocation is less than 0.5mm surface distortion is less than 1.5mm. Mode with the side rail. Grid slot bi-directional gate leaf on a car lift and lower grille blade adjustment is completed with pin connection, then try connecting rod. After you check the accessories complete the fastening, hanging out the bottom opening and closing test in still water as a whole. 8.2.3 tainter and hinge installation Setup: Pivot fixed bearing installation ? orbit stitching, alignment ? arm splicing, installation connected with the headstock ? ? ? welding door leaf side connecting plates welded, water seal installation ? clean, and wipe off. 8.2.3.1 hinge installation and
唯港荟
than ? 5mm; elevation deviation was less than ? 5mm work surface height difference is not more than 3mm on the one end to the other end; wrong tooth at the joint is less than 1mm. Side rail mounting: side rail installation take each side rail on two points. During the installation process, use tensioner to adjust the side rail. Side rail hole top center within the scope of the work is less than +2~-1mm, scope of work at a 4-to-2; wrong tooth less than 1mm at the joint work surface flatness 2mm lateral curvature RADIUS is less than ? 5mm sealing plate surface distortion is less than 1mm. Reinforcement process of adjustment is completed, in order to prevent tank deformation or displacement, welded tank side of the door, then welded reinforcing side, lap length is not less than 100mm. Door installation: the lintel the installation focuses on family Center sill plane distance h is less than ? 3mm; work surface flatness of less than 2mm; combination of surface dislocation is less than 0.5mm surface distortion is less than 1.5mm. Mode with the side rail. Grid slot bi-directional gate leaf on a car lift and lower grille blade adjustment is completed with pin connection, then try connecting rod. After you check the accessories complete the fastening, hanging out the bottom opening and closing test in still water as a whole. 8.2.3 tainter and hinge installation Setup: Pivot fixed bearing installation ? orbit stitching, alignment ? arm splicing, installation connected with the headstock ? ? ? welding door leaf side connecting plates welded, water seal installation ? clean, and wipe off. 8.2.3.1 hinge installation and
德国 慕尼黑
Hotel Stachus (施塔胡斯酒店)
伦敦GBP对RMB1:10.5
Pestana Chelsea Bridge Hotel & Spa (佩斯塔纳切尔西桥酒店&SPA) Park Plaza Westminster Bridge London (公园广场西敏桥酒店&度假村) citizenM London Bankside (西铁城伦敦泰晤士河畔酒店)
意大利 米兰EUR对RMB 1:8.25
Hotel Berna (伯纳酒店)
Hotel Cristoforo Colombo (哥伦布克里斯托佛酒店)
泰国 曼谷THB泰铢对RMB1:0.206
Centara Grand At Centralworld (圣塔拉世贸中心大酒店) than ? 5mm; elevation deviation was less than ? 5mm work surface height difference is not more than 3mm on the one end to the other end; wrong tooth at the joint is less than 1mm. Side rail mounting: side rail installation take each side rail on two points. During the installation process, use tensioner to adjust the side rail. Side rail hole top center within the scope of the work is less than +2~-1mm, scope of work at a 4-to-2; wrong tooth less than 1mm at the joint work surface flatness 2mm lateral curvature RADIUS is less than ? 5mm sealing plate surface distortion is less than 1mm. Reinforcement process of adjustment is completed, in order to prevent tank deformation or displacement, welded tank side of the door, then welded reinforcing side, lap length is not less than 100mm. Door installation: the lintel the installation focuses on family Center sill plane distance h is less than ? 3mm; work surface flatness of less than 2mm; combination of surface dislocation is less than 0.5mm surface distortion is less than 1.5mm. Mode with the side rail. Grid slot bi-directional gate leaf on a car lift and lower grille blade adjustment is completed with pin connection, then try connecting rod. After you check the accessories complete the fastening, hanging out the bottom opening and closing test in still water as a whole. 8.2.3 tainter and hinge installation Setup: Pivot fixed bearing installation ? orbit stitching, alignment ? arm splicing, installation connected with the headstock ? ? ? welding door leaf side connecting plates welded, water seal installation ? clean, and wipe off. 8.2.3.1 hinge installation and
Sivatel Bangkok (曼谷斯瓦特尔酒店)
Grande Centre Point Ratchadamri Hotel And Residence (拉喃立中央居舍大酒店)
瑞士 苏黎世 CHF瑞郎对RMB1:6.50
Swissotel Zurich (苏黎世瑞士酒店)
Schweizerhof Zürich (施伟泽霍夫苏黎世酒店)
西班牙 巴萨罗纳
Schweizerhof Zürich (施伟泽霍夫苏黎世酒店)
Majestic Hotel & Spa Barcelona GL (巴塞罗纳GL莫伽斯提克酒店&温泉)
日本 东京 日元JPY对RMB1:0.0695
The Capitol Hotel Tokyu (东优国会酒店)
Hilton Tokyo Hotel (希尔顿酒店集团)
新加坡 SGD对RMB汇率1:5.106
Marina Bay Sands (滨海湾金沙大酒店)
Pan Pacific Singapore (新加坡泛太平洋酒店)
阿拉伯联合国 阿布扎比 AED
Yas Viceroy Hotel (亚斯总督酒店)
Al Raha Beach Hotel (爱尔拉哈海滩酒店)
沙特阿拉伯
Mena Grand - Khaldia (梅纳格兰德 - 卡尔迪亚)
Sheraton Riyadh Hotel & Towers than ? 5mm; elevation deviation was less than ? 5mm work surface height difference is not more than 3mm on the one end to the other end; wrong tooth at the joint is less than 1mm. Side rail mounting: side rail installation take each side rail on two points. During the installation process, use tensioner to adjust the side rail. Side rail hole top center within the scope of the work is less than +2~-1mm, scope of work at a 4-to-2; wrong tooth less than 1mm at the joint work surface flatness 2mm lateral curvature RADIUS is less than ? 5mm sealing plate surface distortion is less than 1mm. Reinforcement process of adjustment is completed, in order to prevent tank deformation or displacement, welded tank side of the door, then welded reinforcing side, lap length is not less than 100mm. Door installation: the lintel the installation focuses on family Center sill plane distance h is less than ? 3mm; work surface flatness of less than 2mm; combination of surface dislocation is less than 0.5mm surface distortion is less than 1.5mm. Mode with the side rail. Grid slot bi-directional gate leaf on a car lift and lower grille blade adjustment is completed with pin connection, then try connecting rod. After you check the accessories complete the fastening, hanging out the bottom opening and closing test in still water as a whole. 8.2.3 tainter and hinge installation Setup: Pivot fixed bearing installation ? orbit stitching, alignment ? arm splicing, installation connected with the headstock ? ? ? welding door leaf side connecting plates welded, water seal installation ? clean, and wipe off. 8.2.3.1 hinge installation and