儿童0-5岁身高.体重.头围
表世界卫生组织标准2006
儿童0-5岁身高.体重.头围标准表世界卫生组织标准2006) 女孩0-5岁身高标准表
下表按月龄的方式列出WHO儿童生长标准女孩 0 - 60 个月(0-5岁)
的身高标准表。
表中 SD 是指标准差。
0SD 列表示中间值(Median)列。+1SD 列表示加一个标准差之后的值
列。其他列类似。
计量单位:cm(厘米)
标准中0 -24个月身高采用躺着的姿势测量,也叫身长。
月龄 -3SD -2SD -1SD 0SD +1SD +2SD +3SD
0 43.6 45.4 47.3 49.1 51.0 52.9 54.7
1 47.8 49.8 51.7 53.7 55.6 57.6 59.5
2 51.0 53.0 55.0 57.1 59.1 61.1 63.2
3 53.5 55.6 57.7 59.8 61.9 64.0 66.1
4 55.6 57.8 59.9 62.1 64.3 66.4 68.6
5 57.4 59.6 61.8 64.0 66.2 68.5 70.7
6 58.9 61.2 63.5 65.7 68.0 70.3 72.5
7 60.3 62.7 65.0 67.3 69.6 71.9 74.2
8 61.7 64.0 66.4 68.7 71.1 73.5 75.8
9 62.9 65.3 67.7 70.1 72.6 75.0 77.4
10 64.1 66.5 69.0 71.5 73.9 76.4 78.9
11 65.2 67.7 70.3 72.8 75.3 77.8 80.3
12 66.3 68.9 71.4 74.0 76.6 79.2 81.7
13 67.3 70.0 72.6 75.2 77.8 80.5 83.1
14 68.3 71.0 73.7 76.4 79.1 81.7 84.4
15 69.3 72.0 74.8 77.5 80.2 83.0 85.7
16 70.2 73.0 75.8 78.6 81.4 84.2 87.0
17 71.1 74.0 76.8 79.7 82.5 85.4 88.2
18 72.0 74.9 77.8 80.7 83.6 86.5 89.4
19 72.8 75.8 78.8 81.7 84.7 87.6 90.6 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
20 73.7 76.7 79.7 82.7 85.7 88.7 91.7 21 74.5 77.5 80.6 83.7 86.7 89.8 92.9 22 75.2 78.4 81.5 84.6 87.7 90.8 94.0 23 76.0 79.2 82.3 85.5 88.7 91.9 95.0 24 76.7 80.0 83.2 86.4 89.6 92.9 96.1
标准中24-60个月身高采用站立的姿势测量。 月龄 -3SD -2SD -1SD 0SD +1SD +2SD +3SD 24 76.0 79.3 82.5 85.7 88.9 92.2 95.4 25 76.8 80.0 83.3 86.6 89.9 93.1 96.4 26 77.5 80.8 84.1 87.4 90.8 94.1 97.4 27 78.1 81.5 84.9 88.3 91.7 95.0 98.4 28 78.8 82.2 85.7 89.1 92.5 96.0 99.4 29 79.5 82.9 86.4 89.9 93.4 96.9 100.3 30 80.1 83.6 87.1 90.7 94.2 97.7 101.3 31 80.7 84.3 87.9 91.4 95.0 98.6 102.2 32 81.3 84.9 88.6 92.2 95.8 99.4 103.1 33 81.9 85.6 89.3 92.9 96.6 100.3 103.9 34 82.5 86.2 89.9 93.6 97.4 101.1 104.8 35 83.1 86.8 90.6 94.4 98.1 101.9 105.6 36 83.6 87.4 91.2 95.1 98.9 102.7 106.5 37 84.2 88.0 91.9 95.7 99.6 103.4 107.3 38 84.7 88.6 92.5 96.4 100.3 104.2 108.1 39 85.3 89.2 93.1 97.1 101.0 105.0 108.9 40 85.8 89.8 93.8 97.7 101.7 105.7 109.7 41 86.3 90.4 94.4 98.4 102.4 106.4 110.5 42 86.8 90.9 95.0 99.0 103.1 107.2 111.2 43 87.4 91.5 95.6 99.7 103.8 107.9 112.0 44 87.9 92.0 96.2 100.3 104.5 108.6 112.7 45 88.4 92.5 96.7 100.9 105.1 109.3 113.5 46 88.9 93.1 97.3 101.5 105.8 110.0 114.2 47 89.3 93.6 97.9 102.1 106.4 110.7 114.9 48 89.8 94.1 98.4 102.7 107.0 111.3 115.7 49 90.3 94.6 99.0 103.3 107.7 112.0 116.4 50 90.7 95.1 99.5 103.9 108.3 112.7 117.1 51 91.2 95.6 100.1 104.5 108.9 113.3 117.7 52 91.7 96.1 100.6 105.0 109.5 114.0 118.4
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
53 92.1 96.6 101.1 105.6 110.1 114.6 119.1
54 92.6 97.1 101.6 106.2 110.7 115.2 119.8
55 93.0 97.6 102.2 106.7 111.3 115.9 120.4
56 93.4 98.1 102.7 107.3 111.9 116.5 121.1
57 93.9 98.5 103.2 107.8 112.5 117.1 121.8
58 94.3 99.0 103.7 108.4 113.0 117.7 122.4
59 94.7 99.5 104.2 108.9 113.6 118.3 123.1
60 95.2 99.9 104.7 109.4 114.2 118.9 123.7
女孩0-5岁体重标准表
下表按月龄的方式列出WHO儿童生长标准女孩 0 - 60 个月(0-5岁)的体重标准表。
表中 SD 是指标准差。
0SD 列表示中间值(Median)列。+1SD 列表示加一个标准差之后的值列。其他列类似。
计量单位:kg(千克)
月龄 -3SD -2SD -1SD 0SD +1SD +2SD +3SD
0 2.0 2.4 2.8 3.2 3.7 4.2 4.8
1 2.7 3.2 3.6 4.2 4.8 5.5 6.2
2 3.4 3.9 4.5 5.1 5.8 6.6 7.5
3 4.0 4.5 5.2 5.8 6.6 7.5 8.5
4 4.4 5.0 5.7 6.4 7.3 8.2 9.3
5 4.8 5.4 6.1 6.9 7.8 8.8 10.0
6 5.1 5.7 6.5 7.3 8.2 9.3 10.6
7 5.3 6.0 6.8 7.6 8.6 9.8 11.1
8 5.6 6.3 7.0 7.9 9.0 10.2 11.6
9 5.8 6.5 7.3 8.2 9.3 10.5 12.0
10 5.9 6.7 7.5 8.5 9.6 10.9 12.4
11 6.1 6.9 7.7 8.7 9.9 11.2 12.8
12 6.3 7.0 7.9 8.9 10.1 11.5 13.1 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
13 6.4 7.2 8.1 9.2 10.4 11.8 13.5 14 6.6 7.4 8.3 9.4 10.6 12.1 13.8 15 6.7 7.6 8.5 9.6 10.9 12.4 14.1 16 6.9 7.7 8.7 9.8 11.1 12.6 14.5 17 7.0 7.9 8.9 10.0 11.4 12.9 14.8 18 7.2 8.1 9.1 10.2 11.6 13.2 15.1 19 7.3 8.2 9.2 10.4 11.8 13.5 15.4 20 7.5 8.4 9.4 10.6 12.1 13.7 15.7 21 7.6 8.6 9.6 10.9 12.3 14.0 16.0 22 7.8 8.7 9.8 11.1 12.5 14.3 16.4 23 7.9 8.9 10.0 11.3 12.8 14.6 16.7 24 8.1 9.0 10.2 11.5 13.0 14.8 17.0 25 8.2 9.2 10.3 11.7 13.3 15.1 17.3 26 8.4 9.4 10.5 11.9 13.5 15.4 17.7 27 8.5 9.5 10.7 12.1 13.7 15.7 18.0 28 8.6 9.7 10.9 12.3 14.0 16.0 18.3 29 8.8 9.8 11.1 12.5 14.2 16.2 18.7 30 8.9 10.0 11.2 12.7 14.4 16.5 19.0 31 9.0 10.1 11.4 12.9 14.7 16.8 19.3 32 9.1 10.3 11.6 13.1 14.9 17.1 19.6 33 9.3 10.4 11.7 13.3 15.1 17.3 20.0 34 9.4 10.5 11.9 13.5 15.4 17.6 20.3 35 9.5 10.7 12.0 13.7 15.6 17.9 20.6 36 9.6 10.8 12.2 13.9 15.8 18.1 20.9 37 9.7 10.9 12.4 14.0 16.0 18.4 21.3 38 9.8 11.1 12.5 14.2 16.3 18.7 21.6 39 9.9 11.2 12.7 14.4 16.5 19.0 22.0 40 10.1 11.3 12.8 14.6 16.7 19.2 22.3 41 10.2 11.5 13.0 14.8 16.9 19.5 22.7 42 10.3 11.6 13.1 15.0 17.2 19.8 23.0 43 10.4 11.7 13.3 15.2 17.4 20.1 23.4 44 10.5 11.8 13.4 15.3 17.6 20.4 23.7 45 10.6 12.0 13.6 15.5 17.8 20.7 24.1 46 10.7 12.1 13.7 15.7 18.1 20.9 24.5 47 10.8 12.2 13.9 15.9 18.3 21.2 24.8 48 10.9 12.3 14.0 16.1 18.5 21.5 25.2 49 11.0 12.4 14.2 16.3 18.8 21.8 25.5 50 11.1 12.6 14.3 16.4 19.0 22.1 25.9 51 11.2 12.7 14.5 16.6 19.2 22.4 26.3 52 11.3 12.8 14.6 16.8 19.4 22.6 26.6
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
53 11.4 12.9 14.8 17.0 19.7 22.9 27.0 54 11.5 13.0 14.9 17.2 19.9 23.2 27.4 55 11.6 13.2 15.1 17.3 20.1 23.5 27.7 56 11.7 13.3 15.2 17.5 20.3 23.8 28.1 57 11.8 13.4 15.3 17.7 20.6 24.1 28.5 58 11.9 13.5 15.5 17.9 20.8 24.4 28.8 59 12.0 13.6 15.6 18.0 21.0 24.6 29.2 60 12.1 13.7 15.8 18.2 21.2 24.9 29.5
我也来说两句 查看全部回复
最新回复
, missyaya (2010-3-19 22:42:03)
女孩0-5岁头围标准表
下表按月龄的方式列出WHO儿童生长标准女孩 0 - 60 个月(0-5岁)的头围标准表。
表中 SD 是指标准差。
0SD 列表示中间值(Median)列。+1SD 列表示加一个标准差之后的值列。其他列类似。
单位:cm(厘米)。
月龄 -3SD -2SD -1SD 0SD +1SD +2SD +3SD
0 30.3 31.5 32.7 33.9 35.1 36.2 37.4
1 33.0 34.2 35.4 36.5 37.7 38.9 40.1
2 34.6 35.8 37.0 38.3 39.5 40.7 41.9
3 35.8 37.1 38.3 39.5 40.8 42.0 43.3
4 36.8 38.1 39.3 40.6 41.8 43.1 44.4
5 37.6 38.9 40.2 41.5 42.7 44.0 45.3
6 38.3 39.6 40.9 42.2 43.5 44.8 46.1
7 38.9 40.2 41.5 42.8 44.1 45.5 46.8
8 39.4 40.7 42.0 43.4 44.7 46.0 47.4
9 39.8 41.2 42.5 43.8 45.2 46.5 47.8 10 40.2 41.5 42.9 44.2 45.6 46.9 48.3 11 40.5 41.9 43.2 44.6 45.9 47.3 48.6
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
12 40.8 42.2 43.5 44.9 46.3 47.6 49.0 13 41.1 42.4 43.8 45.2 46.5 47.9 49.3 14 41.3 42.7 44.1 45.4 46.8 48.2 49.5 15 41.5 42.9 44.3 45.7 47.0 48.4 49.8 16 41.7 43.1 44.5 45.9 47.2 48.6 50.0 17 41.9 43.3 44.7 46.1 47.4 48.8 50.2 18 42.1 43.5 44.9 46.2 47.6 49.0 50.4 19 42.3 43.6 45.0 46.4 47.8 49.2 50.6 20 42.4 43.8 45.2 46.6 48.0 49.4 50.7 21 42.6 44.0 45.3 46.7 48.1 49.5 50.9 22 42.7 44.1 45.5 46.9 48.3 49.7 51.1 23 42.9 44.3 45.6 47.0 48.4 49.8 51.2 24 43.0 44.4 45.8 47.2 48.6 50.0 51.4 25 43.1 44.5 45.9 47.3 48.7 50.1 51.5 26 43.3 44.7 46.1 47.5 48.9 50.3 51.7 27 43.4 44.8 46.2 47.6 49.0 50.4 51.8 28 43.5 44.9 46.3 47.7 49.1 50.5 51.9 29 43.6 45.0 46.4 47.8 49.2 50.6 52.0 30 43.7 45.1 46.5 47.9 49.3 50.7 52.2 31 43.8 45.2 46.6 48.0 49.4 50.9 52.3 32 43.9 45.3 46.7 48.1 49.6 51.0 52.4 33 44.0 45.4 46.8 48.2 49.7 51.1 52.5 34 44.1 45.5 46.9 48.3 49.7 51.2 52.6 35 44.2 45.6 47.0 48.4 49.8 51.2 52.7 36 44.3 45.7 47.1 48.5 49.9 51.3 52.7 37 44.4 45.8 47.2 48.6 50.0 51.4 52.8 38 44.4 45.8 47.3 48.7 50.1 51.5 52.9 39 44.5 45.9 47.3 48.7 50.2 51.6 53.0 40 44.6 46.0 47.4 48.8 50.2 51.7 53.1 41 44.6 46.1 47.5 48.9 50.3 51.7 53.1 42 44.7 46.1 47.5 49.0 50.4 51.8 53.2 43 44.8 46.2 47.6 49.0 50.4 51.9 53.3 44 44.8 46.3 47.7 49.1 50.5 51.9 53.3 45 44.9 46.3 47.7 49.2 50.6 52.0 53.4 46 45.0 46.4 47.8 49.2 50.6 52.1 53.5 47 45.0 46.4 47.9 49.3 50.7 52.1 53.5 48 45.1 46.5 47.9 49.3 50.8 52.2 53.6 49 45.1 46.5 48.0 49.4 50.8 52.2 53.6 50 45.2 46.6 48.0 49.4 50.9 52.3 53.7 51 45.2 46.7 48.1 49.5 50.9 52.3 53.8
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
52 45.3 46.7 48.1 49.5 51.0 52.4 53.8 53 45.3 46.8 48.2 49.6 51.0 52.4 53.9 54 45.4 46.8 48.2 49.6 51.1 52.5 53.9 55 45.4 46.9 48.3 49.7 51.1 52.5 54.0 56 45.5 46.9 48.3 49.7 51.2 52.6 54.0 57 45.5 46.9 48.4 49.8 51.2 52.6 54.1 58 45.6 47.0 48.4 49.8 51.3 52.7 54.1 59 45.6 47.0 48.5 49.9 51.3 52.7 54.1 60 45.7 47.1 48.5 49.9 51.3 52.8 54.2
男孩0-5岁身高标准表
下表按月龄的方式列出WHO儿童生长标准男孩 0 - 60 个月(0-5岁)的身高标准表。 表中 SD 是指标准差。
0SD 列表示中间值(Median)列。+1SD 列表示加一个标准差之后的值列。其他列类似。 计量单位:cm(厘米)
标准中0 -24个月身高采用躺着的姿势测量,也叫身长。
月龄 -3SD -2SD -1SD 0SD +1SD +2SD +3SD
0 44.2 46.1 48.0 49.9 51.8 53.7 55.6
1 48.9 50.8 52.8 54.7 56.7 58.6 60.6
2 52.4 54.4 56.4 58.4 60.4 62.4 64.4
3 55.3 57.3 59.4 61.4 63.5 65.5 67.6
4 57.6 59.7 61.8 63.9 66.0 68.0 70.1
5 59.6 61.7 63.8 65.9 68.0 70.1 72.2
6 61.2 63.3 65.5 67.6 69.8 71.9 74.0
7 62.7 64.8 67.0 69.2 71.3 73.5 75.7
8 64.0 66.2 68.4 70.6 72.8 75.0 77.2
9 65.2 67.5 69.7 72.0 74.2 76.5 78.7
10 66.4 68.7 71.0 73.3 75.6 77.9 80.1
11 67.6 69.9 72.2 74.5 76.9 79.2 81.5
12 68.6 71.0 73.4 75.7 78.1 80.5 82.9
13 69.6 72.1 74.5 76.9 79.3 81.8 84.2
14 70.6 73.1 75.6 78.0 80.5 83.0 85.5
15 71.6 74.1 76.6 79.1 81.7 84.2 86.7
16 72.5 75.0 77.6 80.2 82.8 85.4 88.0
17 73.3 76.0 78.6 81.2 83.9 86.5 89.2
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
18 74.2 76.9 79.6 82.3 85.0 87.7 90.4 19 75.0 77.7 80.5 83.2 86.0 88.8 91.5 20 75.8 78.6 81.4 84.2 87.0 89.8 92.6 21 76.5 79.4 82.3 85.1 88.0 90.9 93.8 22 77.2 80.2 83.1 86.0 89.0 91.9 94.9 23 78.0 81.0 83.9 86.9 89.9 92.9 95.9 24 78.7 81.7 84.8 87.8 90.9 93.9 97.0
标准中24-60个月身高采用站立的姿势测量。
月龄 -3SD -2SD -1SD 0SD +1SD +2SD +3SD 24 78.0 81.0 84.1 87.1 90.2 93.2 96.3 25 78.6 81.7 84.9 88.0 91.1 94.2 97.3 26 79.3 82.5 85.6 88.8 92.0 95.2 98.3 27 79.9 83.1 86.4 89.6 92.9 96.1 99.3 28 80.5 83.8 87.1 90.4 93.7 97.0 100.3 29 81.1 84.5 87.8 91.2 94.5 97.9 101.2 30 81.7 85.1 88.5 91.9 95.3 98.7 102.1 31 82.3 85.7 89.2 92.7 96.1 99.6 103.0 32 82.8 86.4 89.9 93.4 96.9 100.4 103.9 33 83.4 86.9 90.5 94.1 97.6 101.2 104.8 34 83.9 87.5 91.1 94.8 98.4 102.0 105.6 35 84.4 88.1 91.8 95.4 99.1 102.7 106.4 36 85.0 88.7 92.4 96.1 99.8 103.5 107.2 37 85.5 89.2 93.0 96.7 100.5 104.2 108.0 38 86.0 89.8 93.6 97.4 101.2 105.0 108.8 39 86.5 90.3 94.2 98.0 101.8 105.7 109.5 40 87.0 90.9 94.7 98.6 102.5 106.4 110.3 41 87.5 91.4 95.3 99.2 103.2 107.1 111.0 42 88.0 91.9 95.9 99.9 103.8 107.8 111.7 43 88.4 92.4 96.4 100.4 104.5 108.5 112.5 44 88.9 93.0 97.0 101.0 105.1 109.1 113.2 45 89.4 93.5 97.5 101.6 105.7 109.8 113.9 46 89.8 94.0 98.1 102.2 106.3 110.4 114.6 47 90.3 94.4 98.6 102.8 106.9 111.1 115.2 48 90.7 94.9 99.1 103.3 107.5 111.7 115.9 49 91.2 95.4 99.7 103.9 108.1 112.4 116.6 50 91.6 95.9 100.2 104.4 108.7 113.0 117.3 51 92.1 96.4 100.7 105.0 109.3 113.6 117.9
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
52 92.5 96.9 101.2 105.6 109.9 114.2 118.6
53 93.0 97.4 101.7 106.1 110.5 114.9 119.2
54 93.4 97.8 102.3 106.7 111.1 115.5 119.9
55 93.9 98.3 102.8 107.2 111.7 116.1 120.6
56 94.3 98.8 103.3 107.8 112.3 116.7 121.2
57 94.7 99.3 103.8 108.3 112.8 117.4 121.9
58 95.2 99.7 104.3 108.9 113.4 118.0 122.6
59 95.6 100.2 104.8 109.4 114.0 118.6 123.2
60 96.1 100.7 105.3 110.0 114.6 119.2 123.9
, missyaya (2010-3-19 22:43:29)
男孩0-5岁体重标准表
下表按月龄的方式列出WHO儿童生长标准男孩 0 - 60 个月(0-5岁)的体重标准表。 表中 SD 是指标准差。
0SD 列表示中间值(Median)列。+1SD 列表示加一个标准差之后的值列。其他列类似。 计量单位:kg(千克)
月龄 -3SD -2SD -1SD 0SD +1SD +2SD +3SD 0 2.1 2.5 2.9 3.3 3.9 4.4 5.0 1 2.9 3.4 3.9 4.5 5.1 5.8 6.6 2 3.8 4.3 4.9 5.6 6.3 7.1 8.0 3 4.4 5.0 5.7 6.4 7.2 8.0 9.0 4 4.9 5.6 6.2 7.0 7.8 8.7 9.7 5 5.3 6.0 6.7 7.5 8.4 9.3 10.4 6 5.7 6.4 7.1 7.9 8.8 9.8 10.9 7 5.9 6.7 7.4 8.3 9.2 10.3 11.4 8 6.2 6.9 7.7 8.6 9.6 10.7 11.9 9 6.4 7.1 8.0 8.9 9.9 11.0 12.3 10 6.6 7.4 8.2 9.2 10.2 11.4 12.7 11 6.8 7.6 8.4 9.4 10.5 11.7 13.0 12 6.9 7.7 8.6 9.6 10.8 12.0 13.3 13 7.1 7.9 8.8 9.9 11.0 12.3 13.7 14 7.2 8.1 9.0 10.1 11.3 12.6 14.0 15 7.4 8.3 9.2 10.3 11.5 12.8 14.3 16 7.5 8.4 9.4 10.5 11.7 13.1 14.6 17 7.7 8.6 9.6 10.7 12.0 13.4 14.9 18 7.8 8.8 9.8 10.9 12.2 13.7 15.3
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
19 8.0 8.9 10.0 11.1 12.5 13.9 15.6 20 8.1 9.1 10.1 11.3 12.7 14.2 15.9 21 8.2 9.2 10.3 11.5 12.9 14.5 16.2 22 8.4 9.4 10.5 11.8 13.2 14.7 16.5 23 8.5 9.5 10.7 12.0 13.4 15.0 16.8 24 8.6 9.7 10.8 12.2 13.6 15.3 17.1 25 8.8 9.8 11.0 12.4 13.9 15.5 17.5 26 8.9 10.0 11.2 12.5 14.1 15.8 17.8 27 9.0 10.1 11.3 12.7 14.3 16.1 18.1 28 9.1 10.2 11.5 12.9 14.5 16.3 18.4 29 9.2 10.4 11.7 13.1 14.8 16.6 18.7 30 9.4 10.5 11.8 13.3 15.0 16.9 19.0 31 9.5 10.7 12.0 13.5 15.2 17.1 19.3 32 9.6 10.8 12.1 13.7 15.4 17.4 19.6 33 9.7 10.9 12.3 13.8 15.6 17.6 19.9 34 9.8 11.0 12.4 14.0 15.8 17.8 20.2 35 9.9 11.2 12.6 14.2 16.0 18.1 20.4 36 10.0 11.3 12.7 14.3 16.2 18.3 20.7 37 10.1 11.4 12.9 14.5 16.4 18.6 21.0 38 10.2 11.5 13.0 14.7 16.6 18.8 21.3 39 10.3 11.6 13.1 14.8 16.8 19.0 21.6 40 10.4 11.8 13.3 15.0 17.0 19.3 21.9 41 10.5 11.9 13.4 15.2 17.2 19.5 22.1 42 10.6 12.0 13.6 15.3 17.4 19.7 22.4 43 10.7 12.1 13.7 15.5 17.6 20.0 22.7 44 10.8 12.2 13.8 15.7 17.8 20.2 23.0 45 10.9 12.4 14.0 15.8 18.0 20.5 23.3 46 11.0 12.5 14.1 16.0 18.2 20.7 23.6 47 11.1 12.6 14.3 16.2 18.4 20.9 23.9 48 11.2 12.7 14.4 16.3 18.6 21.2 24.2 49 11.3 12.8 14.5 16.5 18.8 21.4 24.5 50 11.4 12.9 14.7 16.7 19.0 21.7 24.8 51 11.5 13.1 14.8 16.8 19.2 21.9 25.1 52 11.6 13.2 15.0 17.0 19.4 22.2 25.4 53 11.7 13.3 15.1 17.2 19.6 22.4 25.7 54 11.8 13.4 15.2 17.3 19.8 22.7 26.0 55 11.9 13.5 15.4 17.5 20.0 22.9 26.3 56 12.0 13.6 15.5 17.7 20.2 23.2 26.6 57 12.1 13.7 15.6 17.8 20.4 23.4 26.9 58 12.2 13.8 15.8 18.0 20.6 23.7 27.2
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
59 12.3 14.0 15.9 18.2 20.8 23.9 27.6 60 12.4 14.1 16.0 18.3 21.0 24.2 27.9
男孩0-5岁头围标准表
下表按月龄的方式列出WHO儿童生长标准男孩 0 - 60 个月(0-5岁)的头围标准表。 表中 SD 是指标准差。
0SD 列表示中间值(Median)列。+1SD 列表示加一个标准差之后的值列。其他列类似。 单位:cm(厘米)。
月龄 -3SD -2SD -1SD 0SD +1SD +2SD +3SD 0 30.7 31.9 33.2 34.5 35.7 37.0 38.3 1 33.8 34.9 36.1 37.3 38.4 39.6 40.8 2 35.6 36.8 38.0 39.1 40.3 41.5 42.6 3 37.0 38.1 39.3 40.5 41.7 42.9 44.1 4 38.0 39.2 40.4 41.6 42.8 44.0 45.2 5 38.9 40.1 41.4 42.6 43.8 45.0 46.2 6 39.7 40.9 42.1 43.3 44.6 45.8 47.0 7 40.3 41.5 42.7 44.0 45.2 46.4 47.7 8 40.8 42.0 43.3 44.5 45.8 47.0 48.3 9 41.2 42.5 43.7 45.0 46.3 47.5 48.8 10 41.6 42.9 44.1 45.4 46.7 47.9 49.2 11 41.9 43.2 44.5 45.8 47.0 48.3 49.6 12 42.2 43.5 44.8 46.1 47.4 48.6 49.9 13 42.5 43.8 45.0 46.3 47.6 48.9 50.2 14 42.7 44.0 45.3 46.6 47.9 49.2 50.5 15 42.9 44.2 45.5 46.8 48.1 49.4 50.7 16 43.1 44.4 45.7 47.0 48.3 49.6 51.0 17 43.2 44.6 45.9 47.2 48.5 49.8 51.2 18 43.4 44.7 46.0 47.4 48.7 50.0 51.4 19 43.5 44.9 46.2 47.5 48.9 50.2 51.5 20 43.7 45.0 46.4 47.7 49.0 50.4 51.7 21 43.8 45.2 46.5 47.8 49.2 50.5 51.9 22 43.9 45.3 46.6 48.0 49.3 50.7 52.0 23 44.1 45.4 46.8 48.1 49.5 50.8 52.2 24 44.2 45.5 46.9 48.3 49.6 51.0 52.3 25 44.3 45.6 47.0 48.4 49.7 51.1 52.5 26 44.4 45.8 47.1 48.5 49.9 51.2 52.6 27 44.5 45.9 47.2 48.6 50.0 51.4 52.7
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
28 44.6 46.0 47.3 48.7 50.1 51.5 52.9 29 44.7 46.1 47.4 48.8 50.2 51.6 53.0 30 44.8 46.1 47.5 48.9 50.3 51.7 53.1 31 44.8 46.2 47.6 49.0 50.4 51.8 53.2 32 44.9 46.3 47.7 49.1 50.5 51.9 53.3 33 45.0 46.4 47.8 49.2 50.6 52.0 53.4 34 45.1 46.5 47.9 49.3 50.7 52.1 53.5 35 45.1 46.6 48.0 49.4 50.8 52.2 53.6 36 45.2 46.6 48.0 49.5 50.9 52.3 53.7 37 45.3 46.7 48.1 49.5 51.0 52.4 53.8 38 45.3 46.8 48.2 49.6 51.0 52.5 53.9 39 45.4 46.8 48.2 49.7 51.1 52.5 54.0 40 45.4 46.9 48.3 49.7 51.2 52.6 54.1 41 45.5 46.9 48.4 49.8 51.3 52.7 54.1 42 45.5 47.0 48.4 49.9 51.3 52.8 54.2 43 45.6 47.0 48.5 49.9 51.4 52.8 54.3 44 45.6 47.1 48.5 50.0 51.4 52.9 54.3 45 45.7 47.1 48.6 50.1 51.5 53.0 54.4 46 45.7 47.2 48.7 50.1 51.6 53.0 54.5 47 45.8 47.2 48.7 50.2 51.6 53.1 54.5 48 45.8 47.3 48.7 50.2 51.7 53.1 54.6 49 45.9 47.3 48.8 50.3 51.7 53.2 54.7 50 45.9 47.4 48.8 50.3 51.8 53.2 54.7 51 45.9 47.4 48.9 50.4 51.8 53.3 54.8 52 46.0 47.5 48.9 50.4 51.9 53.4 54.8 53 46.0 47.5 49.0 50.4 51.9 53.4 54.9 54 46.1 47.5 49.0 50.5 52.0 53.5 54.9 55 46.1 47.6 49.1 50.5 52.0 53.5 55.0 56 46.1 47.6 49.1 50.6 52.1 53.5 55.0 57 46.2 47.6 49.1 50.6 52.1 53.6 55.1 58 46.2 47.7 49.2 50.7 52.1 53.6 55.1 59 46.2 47.7 49.2 50.7 52.2 53.7 55.2 60 46.3 47.7 49.2 50.7 52.2 53.7 55.2
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld