经典英文歌曲歌词 一
Nothing's gonna change my love for you
if i had to live my life without you near me 如果我不得不过一种没有你陪伴的生活
the days would all be empty 白天会变得很空虚 the nights would seem so long 黑夜会变得很漫长 you i see forever oh so clearly 我看见你 是如此的晰 i might have been in love before 我可能曾经爱过
but i've never felt this strong 但从没有像这次感觉这般强烈 our dreams are young and we both know我们两个都知道我们的梦想很年轻 they’ll take us where we want to go 它们会带我们到达我们向往的地方 hold me now touch me now 现在 抱紧我 触摸我 i don't want to live without you 我不想过没有你的生活
nothing's gonna change my love for you 没有什么能够改变我对你爱 you oughta know by now how much i love you 你现在应该知道我有多爱你 one thing you can be sure of 你可以确信一点 i never ask for more than your love 除了你的爱 我别无所求
nothing's gonna change my love for you 没有什么能够改变我对你的爱 you oughta know by now how much i love you 你现在应该知道我有多爱你 the world may change my whole life through 这世界可能会将我的一生改变 but nothing's gonna change my love for you但没有什么能够改变我对你的爱
as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
if the road ahead is not so easy 如果前面的路不是那么容易走
our love will lead the way for us like a guiding star 我们的爱会像
启明星一样迎领我们前行
i'll be there for you if you should need me 当你可能需要我时 我就会出现
you don't have to change a thing 你不需要做什么改变
i love you just the way you are 我爱你 就爱你现在这样
so come with me and share the view 所以 跟我来吧 一起分享风景
i help you see forever too 我会永远帮助你去感受
hold me now touch me now 现在 抱紧我 触摸我
i don't want to live without you 我不想过没有你的生活
Yesterday Once More昨日重现
When I was young I'd listen to the radio
Waiting for my favorite songs
When they played I'd sing along it made me smile Those were such happy times and not so long ago
How I wonder where they'd gone
But they're back again just like a long lost friend
All the songs I love so well
Every sha la la la …… every wo wo …… still shine
Every shinga linga ling that they're starting to sing so fine
When they get to the part where he's breaking her heart as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
It can really make me cry just like before it's yesterday once more Looking back on how it was in years gone by
And the good time that I had
Makes today seem rather sad so much has changed
It was songs of love that I would sing to them
And I'd memorize each word
Those old melodies still sound so good to me
As they melt the years away
Every sha la la la …… every wo wo …… still shine
Every shinga linga ling that they're starting to sing so fine
All my best memories Come back clearly to me
Some can even make me cry Just like before It"s yesterday once more
No matter what 无论如何 Boyzone
No matter what they tell us 无论他们如何告诉我们
No matter what they do 无论他们对我们做什么
No matter what they teach us 无论他们教给我们什么
What we believe is true 我们坚信的才是真理
No matter what they call us 无论他们如何称呼我们
However they attack 无论他们如何诋毁我们
as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
No matter where they take us 无论他们把我们带到哪里 We'll find our own way back 我们将找到自己回来的路
I can't deny what I believe 我不能背叛我的信念
I can't be what I'm not 我不能虚伪地活着
I know our love forever 我知道我们的爱将永恒
I know, no matter what 我知道,无论如何
If only tears were laughter (ooh) 一旦眼泪化作微笑 If only night was day (ooh) 一旦黑夜变成白昼
If only prayers were answered (hear my prayers) 一旦祈祷得到回答(听我的祈祷)
Then we would hear God say (say) 我们就能听到上帝的声音
No matter what they tell you (ooh) 无论他们如何告诉你们 No matter what they do (ooh) 无论他们对你们作什么 No matter what they teach you 无论他们教给你们什么 What you believe is true 你们坚信的才是真理
And I will keep you safe and strong 我将保佑你们平安和强壮 And shelter from the storm 也为你们挡风遮雨
No matter where it's barren 无论那里如何荒芜
as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
A dream is being born 一个梦想正在诞生
(Ooh)
No matter who they follow 无论他们追随着谁
No matter where they lead 无论他们去向哪里
No matter how they judge us 无论他们如何判决我们
I'll be everyone you need 我将永远和你在一起
No matter if the sun don't shine (sun don't shine)无论太阳是否明亮(太阳暗了)
Or if the skies are blue (skies are blue) 或者天空是否蔚蓝(天空是蓝色的) No matter what the end is 无论结局如何
My life began with you 我的生命从你开始
I can't deny what I believe (what I believe, yeah) 我不能背叛我的信念(我的信念)
I can't be what I'm not 我不能虚伪地活着
(I know, I know) I know this love's forever (我知道,我知道)我知道这爱将永恒
That's all that matters now 现在这就是一切
No matter what 无论如何
No matter what (no, no matter, no) 无论如何(无论)
as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
No, no matter 无论
That's all that matters to me 对我来说,这就是一切
Just one last dance
Just one last dance....oh baby...just one last dance 再来最后一舞,亲爱的,再来最后的一舞
We meet in the night in the Spanish café 我们相遇到那个西班牙咖啡厅 I look in your eyes just don't know what to say 我望进你眼睛忘记了言语能力
It feels like I'm drowning in salty water 我犹如在盐水里溺弱 A few hours left 'til the sun's gonna rise 还有几小时黎明将到 Tomorrow will come an it's time to realize 明天的来临终告 Our love has finished forever 我们的爱永远终止
How I wish to come with you (wish to come with you) 我多希望能对你而去 How I wish we make it through 多么希望我们能一起面对
Just one last dance 再来最后的一舞
Before we say goodbye 在说再见之前
When we sway and turn round and round and round 当我们转啊转啊转 It's like the first time 如同第一次那样
Just one more chance 再多一只舞
Hold me tight and keep me warm 抱紧我让我感受你的温暖 as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
Cause the night is getting cold 因为夜开始冰凉
And I don't know where I belong 而我不知道自己归于何处 Just one last dance 再来最后一舞
The wine and the lights and the Spanish guitar 在酒和灯与这西班牙吉它 I'll never forget how romantic they are 我永远不会忘记他们是多么浪漫 But I know, tomorrow I'll lose the one I love 但我知道,明天我将失去我所爱 There's no way to come with you 我无法随你而去
It's the only thing to do 现在唯一能做的
Just one last dance 再来最后的一舞
Before we say goodbye 在说再见之前
When we sway and turn round and round and round 当我们转啊转啊转 It's like the first time 如同第一次那样
Just one more chance 再多一只舞
Hold me tight and keep me warm 抱紧我让我感受你的温暖 Cause the night is getting cold 因为夜开始冰凉
And I don't know where I belong 而我不知道自己归于何处 Just one last dance 再来最后一舞
Just one last dance 再来最后的一舞
Before we say goodbye 在说再见之前
as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
When we sway and turn round and round and round 当我们转啊转啊转 It's like the first time 如同第一次那样
Just one more chance 再多一只舞
Hold me tight and keep me warm 抱紧我让我感受你的温暖 Cause the night is getting cold 因为夜开始冰凉
And I don't know where I belong 而我不知道自己归于何处 Just one last dance 再来最后一舞
I believe I can fly
I used to think that I could not go on过去我常以为我不能继续 And life was nothing but an awful song生活一无是处如同一首糟糕的歌曲 But now I know the meaning of true love但是现在我知道了真爱的意义 I'm leaning on the everlasting arms我从永恒的臂膀中学习到它 If I can see it, then I can do it如果我能看见,我就能做到
If I just believe it, there's nothing to it如果我只是相信它它们就变得无足轻重 I believe I can fly我相信我能够飞翔
I believe I can touch the sky我相信我能触摸到天际
I think about it every night and day每个日夜我都在思考
Spread my wings and fly away能够张开翅膀尽情飞翔
I believe I can soar我相信我可以滑翔
I see me running through that open door我看见自己从那敞开的大门中跑出 I believe I can fly我相信我能够飞翔
as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
I believe I can fly我相信我能够飞翔
I believe I can fly我相信我能够飞翔
See I was on the verge of breaking down看见我站在爆发的边缘
Sometimes silence, it can seem so loud有时候沉默,也能看上去很大声
There are miracles in life I must achieve生命中有许多奇迹我必须要到达
But first I know it starts inside of me 但首先我知道,一切都必须从我的内心启航
Say you, say me Say you, say me
Say it for always, that's the way it should be Say you, say me
Say it together, naturally
说“你”,说“我”
不断地说,这才是我们应该做的
说“你”,说“我”
一起说,发自肺腑地说~
I had a dream I had an awesome dream People in the park playing games in the dark And what they played was a masquerade And from behind of walls of doubt a voice was crying out
[Chorus]
我有一个梦,一个令人振奋的梦,
as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
我梦见,在人们都带着自己的假面游戏人生的时候
一个怀疑的声音从不知何处传来:
As we go down life's lonesome highway Seems the hardest thing to do is to find a friend or two
A helping hand - some one who understands That when you feel you've lost your way You've got some one there to say I'll show you [Chorus]
——当我们独自在人生路上行走时,发现有一两个真心的朋友变得仿佛那么
遥不可及,还有那些会在你最困惑的时候为你指路的人;
So you think you know the answers - oh no 'cause the whole world has got you dancing That's right - I'm telling you
It's time to start believing - oh yes Believing who you are - you are a shining star [Chorus]
现在你觉得你明白了你是谁,但是你没有,因为你也是那假面舞会中的一员,
是的,我告诉你,现在正是坚定信念的时候,
oh,yes~!相信你自己~~相信你就是那闪亮的星
YELLOW 酷玩cold play
Look at the stars 仰望天上的星星
as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
Look how they shine for you 看着它们为你绽放光芒 And everything you do Yeah, they were all yellow 而你却如此胆怯小心 I came along 跟随着你
I wrote a song for you 我为你写下了一首情歌 And all the things you do 因为你
现出的胆怯小心 And it was called yellow 歌名叫做"黄色"
So then I took my turn 我会全心全意
Oh what a thing to have done 想突破你的心房赢得你的芳心 And it was all yellow 却也担心害怕起来
【Your skin, oh yeah your skin and bones 你的肌肤 Turn into something beautiful 是如此的美丽脱俗而真实 Do'you know? 你该知道
You know I love you so 我不可自拔的爱上了你 You know I love you so 你该明了我已经深深地爱上了你
I swam across 整个心早已游向你
I jumped across for you 整个人急着想飞奔到你面前却又却步 Oh what a thing to do 不知如何靠近你
'Cos you were all yellow 因为你是如此胆怯小心 I drew a line 我画出你的肖像
I drew a line for you 我画下了你的样子
as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
Oh what a thing to do 却不知该如何表示
And it was all yellow 因为你是如此胆怯小心 And your skin, oh yeah your skin and bones 你的肌肤 Turn into something beautiful 是如此美丽脱俗而真实 Do'you know? 你该知道
For you I bleed myself dry 我愿为你抛开一切 For you I bleed myself dry 你该明了,我为你失去生命也不可惜
It's true 这是真的
Look how they shine for you 星星都因为你绽放光芒 Look how they shine for you 星星都因为你绽放光芒 Look how they shine for you 看!它们都为你绽放光芒 Look how they shine for you 看!它们都为你绽放光芒 Look how they shine for you 星星都因为你绽放光芒 Look how they shine
Look at the stars 仰望天上的星星
Look how they shine for you 看着它们为你绽放光芒 And all the things that you do 而你却如此胆怯小心
Memory Midnight午夜
as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
Not a sound from the pavement街道上静寂无声 Has the moon lost her memory月亮失去回忆了吗 She is smilling alone只在独自微笑
In the lamplight灯光下
The withered leaves collect at my feet我脚下堆满枯叶 And wind风
Begins to moan 开始悲歌
Memory回忆
All alone in the moonlight月光下形单影只 I can smill at the old days我能对往昔微笑 I was beatiful then那时我多美
I remember我记得
The time I knew what happiness was过去的幸福时光 Let the memory让回忆
Live again再次苏醒
Every street lamp每盏街灯
Seems the best象是
A fatalistic warning宿命的警讯
Someone mutters某人喃喃低语
And a streetlamp gutter街灯成排
And soon it will be morning清晨就快来到 Daylight破晓
as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
I must wait for the sunrise我必须等待日出
I must think of a new life我必须思考新的生活 And I mustn’t give in我不能退缩
When the dawn comes当黎明到来
Tonight will be a memory too夜晚将成为回忆 And a new day will begin而新的一天既将开始
Brunt out ends of smokey days耗尽灰暗的日子 The stale cold smell of morning清晨寒冷的霉味 The streetlamp dies街灯熄灭
Another night is over又一个夜晚结束了
Another day is dawning新的一天既将来到
Touch me触摸我
It’s so easy to leave me留我一人容易
All alone with my memory面对回忆
Of my days in the sun那段阳光下的日子
If you touch me如果触摸我
You’ll understand what happiness你会明白幸福的真谛 Look a new day看~新的一天
Has begun已经开始
larger than life后街男孩 When you?re screaming my name, alright 当你尖声叫出我(上苍)的名字,
as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
But let me tell you now但是现在让我告诉你
there are prices to fame, alright要成名要付出代价
All of our time spent in flashes of light而我们的一生转瞬即逝
All you people can?t you see, can?t you see所有的人你们难道不能看到吗 how your love?s affecting our reality爱能够改变现实
Everytime we?re down每次我们失败沮丧
you can make it right你自己能让他重新好起来
And that makes you larger than life而这让你比生命还伟大
looking at the crowd看那熙熙攘攘的人群
and I see your body sway, c?mon我看到你的身体摇摆,来吧(come on)! Wishin I could thank you in a different way, c?mon我希望能以另一种方式感谢你,来吧~
?Cause all of your time spent keeps us alive
因为你所有的时间做的是让我们生存
All you people can?t you see, can?t you see(这句之后就是重复了) how your love?s affecting our reality Everytime we?re down
you can make it right
And that makes you larger than life as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
All of your time spent keeps us alive
All you people can?t you see, can?t you see how your love?s affecting our reality Everytime we?re down
you can make it right
If I should stay.如果我留下来。
I would only be in Ur way.我会成为你的羁绊。
So I'll go.所以我离去。
But I know.但我知道。
I'll think of U every step of the way.我每迈出的一步都会想着你。
And I will always love U ! 于是我将永远爱你~
I will always love U ! 我将永远爱你~
U,my darling U ! 你,我亲爱的宝贝~
Bitter sweet memories.苦涩而甜蜜的回忆。
That is all I'm taking with me.是我带走的唯一东西。
So goodbye,please don't cry.再见吧,请不要哭泣。
We both know I'm not what U need.我们彼此都知道我不是你所需。 as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
And I will always love U ! 于是我将永远爱你~ I will always love U ! 我将永远爱你~
I hope life treats U kind.我希望生活能善待你。 And I hope U have all U dreamed off.希望你好梦成真。 And I wish 2 U joy & happiness.祝愿你美满幸福。 But above all this I wish 2 U love.更要祝福你找到真爱。
And I will always love U ! 于是我将永远爱你~ I will always love U ! 我将永远爱你~
I will always love U ! 我将永远爱你~
I will always love U ! 我将永远爱你~
I will always love U ! 我将永远爱你~
I will always love U ! 我将永远爱你~
Daring I love U ! 亲爱的,我爱你~
Always love U ! 永远爱你~
Never Had A Dream Come 从未梦想成真 Everybody's got something as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
They had to leave behind 每个人都不得不放弃一些东西。 One regret from yesterday
That just seems to grow with time 昨天残留在心中的遗憾今天好象令人更加痛苦。
There's no use looking back or wondering 回忆过去没有意义, How it could be now or 4)might have been 想象我们现在会怎样或可能会怎样也是徒劳无功。
All this I know but still I can't find ways
To let you go 这些我都知道,但是我就是没有办法忘记你。 I never had a dream come true Till the day that found you 直到遇见你,我才梦想成真。
Even though I pretend that I moved on 虽然我假装继续生活下去, You'll always be my baby 但是我会永远记得你。
I never found the words to say You're the one I think about each day 我无法形容我的心情,我每天都在想你。
And I know no matter where life takes me to
A part of me will always be with you. 不论我身在合处,你总会在我心中。 Somewhere in my memory
I've lost all sense of time 在我记忆的某个地方, 时间好象已经不存在了. as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
And tomorrow can never be
Cause yesterday is all that fills my mind 我无法想象明天, 因为我的心已被过去添满.
There's no use looking back or wondering 回忆过去没有意义, How it could be now or might have been 想象我们现在会怎样或可能会怎样也是徒劳无功。
All this I know but still I can't find ways
To let you go 这些我都知道,但是我就是没有办法忘记你。 I never had a dream come true Till the day that found you 直到遇见你,我才梦想成真。
Even though I pretend that I moved on 虽然我假装继续生活下去, You'll always be my baby 但是我会永远记得你。
I never found the words to say You're the one I think about each day 我无法形容我的心情,我每天都在想你。
And I know no matter where life takes me to
A part of me will always be with you. 不论我身在合处,你总会在我心中。 You'll always be the dream That fills my head 你就是我所有的梦想,
You'll always be the one Iknow as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
I'll never forget 我知道你就是那个我永远不会忘记的人。
It's no use looking back or wondering 回忆过去没有意义,
Because love is a strange and funny thing 因为爱情就是一件奇特美妙的事
情。
No matter how I try and try 无论我怎样努力,
I just can't say goodbye 就是说不出再见。
as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic