为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

2012施用碱性肥料对酸性土壤改良效果对比试验总结

2018-04-11 44页 doc 135KB 13阅读

用户头像

is_624976

暂无简介

举报
2012施用碱性肥料对酸性土壤改良效果对比试验总结2012施用碱性肥料对酸性土壤改良效果对比试验总结 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name proje...
2012施用碱性肥料对酸性土壤改良效果对比试验总结
2012施用碱性肥料对酸性土壤改良效果对比试验总结 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 施用碱性肥料对酸性土壤改良效果对比试验总结 一、试验目的 选择施用钙镁磷肥、硅钙肥等碱性肥料~探索其对酸性土壤改良效果。 二、试验设计 选用水稻作为供试作物~试验设4个处理。 处理1:CK,对照,~应用测土配方施肥成果施用氮、磷、钾养分~磷素采用过磷酸钙, 处理2:磷素采用钙镁磷肥~其他与处理1相同, 处理3:在处理1的基础上施用硅钙肥50公斤/亩。 处理4:在处理2的基础上施用硅钙肥50公斤/亩。 2设置三次重复、小区面积不小于30m~采用随机区组排列。 三、试验要求 ,一,作物品种选择 选择当地主栽作物品种:桂丝占。 ,二,试验地的选择 1、试验地肥力要均匀一致~且前三年未进行过田间试验~要尽量避开树木、建筑物、沟渠、水塘、肥坑、道路等~以免造成土壤肥力和气候条件的不一致性。 2、有较好的排灌条件。 ,三,试验地块的灌排水沟的设置 试验地块要合理设置水沟~确保各小区的灌水、排水统一通过水沟进行~杜绝串灌串排和通过保护行进行灌、排水。 ,四,保护行的设置 小区试验地四周要设置保护行~保护行应按稍低于处理1的施肥量进行施肥。 ,五,肥料选用 试验统一不施用有机肥料。选用养分含量稳定的尿素、过磷酸钙、钙镁磷肥、氯化钾、硅钙肥等单质化肥。尿素,柳州化肥厂生产~含N46,,,过磷酸钙,柳州化工集团生产~含P2O5:12,,~钙镁磷,贵州化工集团生产~含P2O5:15,,~氯化钾,产地加拿大~含,,60%,~土壞调理肥, 广东, 硅钙肥, 柳州,。 2 ,六,肥料施用时期 按测土配方施肥技术要求的肥料施用时期进行。全部磷肥、硅钙肥、30%的氮肥、50%的钾肥于整地时施下~40%的氮肥、50%的钾肥于分蘖期施下~20%的氮肥于幼穗shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 分化初期施下~余下的氮肥于齐穗期施下。 ,七,试验地块土壤样品的采集与分析 1、试验整地前在试验地块上采集耕层混合样。 2、分蘖初期、幼穗分化初期和试验收获后按处理分别采集耕层混合样。 3、测定项目:试验前和收获后采集的土样测试pH、有机质、全氮、有效磷、速效钾、土壤交换性钙镁,分蘖初期、幼穗分化初期采集的土样只测试pH和土壤交换性钙镁。 四(试验实施情况: ,1, 秧田:早稻~4月3日播种,为半水育秧~小拱塑料薄膜覆盖~播种量为20Kg/666.67?。 ,2, 本田:早稻两犁两耙后~于5月2日起小区~3日用农膜包裹田埂~施基肥~4日插秧~插秧时秧苗株高25.1;,,大多数带2-3个分蘖。插植规格为20cm×20cm ,每小区60行,每行12蔸,共720蔸。5月10日分蘖追肥~6月12日施幼穗分化肥。6月22日始穗~1(处理6月27日齐穗。2、3、4处理6月28日齐穗。其它管理措施一致~病虫均未造成危害。7月21日收获~全生育期109天。早稻收获时按小区实行全收全称~每小区取10蔸进行室内考种。 二(试验结果分析 ,(不同处理对水稻生长期的影响: 、3、4的分蘖、株高均无明差异~处理1与处从水稻生长速度观察可知:处理2 理2、3、4的分蘖、株高差异较明显。 ,(不同处理对水稻有效穗(实粒数(千粒重的影响 从植株经济性状室内考种可知:处理1与4、3的实粒数(千粒重差异较明显~处理1亩有效穗与处理3、4的亩有效穗差异较明显。,祥见表1,。 ?(不同处理对水稻产量的影响 试验结果表明:处理3、4之间的产量差异不明显~处理4与处理1的产量差异明显~次之顺次为处理3、2 。经方差分析~处理4、3 增产效果均达到极显著水平~其中以处理4最明显,详见表2-1、2、3、4和表3-1、2、3、4,。 三(小结 本试验结果表明: 以处理4的施肥效果最佳~次之为3~其余顺次为2、1。 rations, tools should be placedphalt; Before the work, should check whether the tools used are secure. Scaffolding erection firmly, not swing. Suspended opepants, hands directly contact with live long, oily materials of as down the content to enter the construction site wear hard hats, respirators and other safety gas appliances, fastening cuffs,-15 content security technology to give the low-2-project name 4down (reference tables) construction construction construction organization name -rproofing construction technology to give the lowt cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Wateaccep re hazard, shall not be left; 12, targeted the construction site safety disclosure; 13, the other. Disclosure signatures toores open; 11, end of the job, the cylinder valve should be closed, screwed on safety cover, job locations, confirm the no fithe ppower supply; 10, welded storage of inflammable, explosive, toxic substances are containers or pipes must be cleaned and all accident; Is strictly prohibited in the pressure vessel and pipe welding, welding electric device you must first cut off the rningnot be placed on the workpiece or ground. With oxygen and acetylene, must not be put in a metal container to prevent gases bu e must be strictly enforcing the relevant regulations; Ignition, torch mouth were forbidden from people burning torches shallcontaminated oils; Gas bottle purchase, transport, storage and us-Oxygen cylinder, oxygen gauge and welding and cutting tools, non rials and fire distance shall not be less than 10m, verify that the leak, use soapy water, open flame is strictly prohibited;inflammable and explosive mate tempering devices, distance between acetylene and oxygen cylinders shall not be less than 5M, no flat, no exposure, away from-h the permission of welding; Acetylene cylinders must be installed pressure reducing valve and antiwitfighting equipment; Must be non flammable gas or liquid when welding, testing shall be approved by the relevant departments, -rehot and approval procedures; Welding site clear inflammable, or cover, isolation, and in the welding area is equipped with fions; Welding jobs must deal with down the content gas welders must hold special certificates, operating certificate expires is not examined no welding operati-14 content security technology to give the low-2-on construction organization name project name 49 ... Construction constructi-2-down (reference tables) construction construction construction organization name project name 4-lowosit of an instrument, and filed a report. External use elevator installation and removal of security technology to give the he depre; 13, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from tt qualified for acceptance or acceptance not made the next processes work; 12, targeted the construction site safety disclosuhomework, no 2 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 附表: 表1 植株经济性状考种表 亩有效理论亩每穗粒数 结实千粒 项目 株高 穗 产 其中 率 重 谷/秆 总粒处理 (cm) (万(kg) (%) (g) 数 实粒 秕粒 穗) 1 113 16.32 134 105 29 78.5 24.5 0.21/0.19 420.59 2 115 16.51 137 108 29 79.1 24.8 0.22/0.20 443.71 3 120 16.96 140 113 27 81 25.4 0.25/0.21 488.51 4 123 17.12 140 115 25 82.2 26.3 0.26/0.21 518.15 表2-1 试验产量结果 (公斤/小区) 处理数K 4 处理 总数 重复数n 3 矫正数C 4961.333 重复 1 2 3 4 (Tb) ? 18 19.5 21.42 22.43 81.35 ? 0.182 18.27 19.8 21.74 22.1 81.91 Sx= ? 17.69 19.2 21.1 22.75 80.74 总数(Ta) 53.96 58.50 64.26 67.28 244.00 平均(Xa) 18.0 19.5 21.4 22.4 表2-2 试验结果方差分析表 F值 变因 自由度 平方和 均方 F0.05 F0.01 处理间 3 35.29 11.76 118.97 4.76 9.78 重复间 2 0.17 0.09 0.87 5.14 10.02 误差 6 0.59 0.10 总数 11 36.06 表2-3 试验结果LSR值的计算 p 2 3 4 SSR0.05 3.46 3.58 3.64 SSR0.01 5.24 5.51 5.65 LSR0.05 0.00 0.00 0.00 LSR0.01 0.00 0.00 0.00 beting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lif undingf cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good groaulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation ohydr updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solidprohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the val ofion, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and remontation operations, operating personnel must have professional training and with valid ID to work; Special command, coordinatdown the content strictly according to the tower crane, remove programme impleme-8 content security technology to give the low-2-down (reference tables) construction construction construction organization name project name 4-safety technology gives the lowcrane time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower le support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature reliabrk, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and ould wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for woes; Shshould check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measurns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you colum ng in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reportie cagein a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside ther, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopp-7 content security technology to give the low-2-n site ... Construction construction construction organization name project name 4ed acceptance not made the next processes work; 10, the constructioshall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualifi 3 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 表3-1 试验产量结果 (公斤/亩) 处理数K 4 处理 总数 重复数n 3 重复 矫正数C 2449840 1 2 3 4 (Tb) ? 1807.00 400 433 476 498 ? Sx= 4.095 1820.00 406 440 483 491 ? 1795.00 393 427 469 506 总数 1199.00 1300.00 1428.00 1495.00 5422.00 (Ta) 平均 (Xa) 399.7 433.3 476.0 498.3 表3-2 试验结果方差分析表 F值 变因 自由度 平方和 均方 F0.05 F0.01 处理间 17429.67 5809.89 115.49 4.76 9.78 3 78.17 39.08 0.78 5.14 10.02 重复间 2 误差 301.83 50.31 6 总数 17809.67 11 表3-3 试验结果LSR值的计算 2 3 4 p SSR0.05 3.46 3.58 3.64 SSR0.01 5.24 5.51 5.65 0.00 0.00 0.00 LSR0.05 LSR0.01 0.00 0.00 0.00 平乐县平乐镇农技站 陆泉宇 翟基明 2012.9.2 rations, tools should be placedphalt; Before the work, should check whether the tools used are secure. Scaffolding erection firmly, not swing. Suspended opepants, hands directly contact with live long, oily materials of as down the content to enter the construction site wear hard hats, respirators and other safety gas appliances, fastening cuffs,-15 content security technology to give the low-2re; 13, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from t-project name 4down (reference tables) construction construction construction organization name -rproofing construction technology to give the lowt cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Wateaccep re hazard, shall not be left; 12, targeted the construction site safety disclosure; 13, the other. Disclosure signatures tot qualified for acceptance or acceptance not made the next processes work; 12, targeted the construction site safety disclosuores open; 11, end of the job, the cylinder valve should be closed, screwed on safety cover, job locations, confirm the no fithe ppower supply; 10, welded storage of inflammable, explosive, toxic substances are containers or pipes must be cleaned and all accident; Is strictly prohibited in the pressure vessel and pipe welding, welding electric device you must first cut off the rningnot be placed on the workpiece or ground. With oxygen and acetylene, must not be put in a metal container to prevent gases bu e must be strictly enforcing the relevant regulations; Ignition, torch mouth were forbidden from people burning torches shallcontaminated oils; Gas bottle purchase, transport, storage and ushomework, no-Oxygen cylinder, oxygen gauge and welding and cutting tools, non rials and fire distance shall not be less than 10m, verify that the leak, use soapy water, open flame is strictly prohibited;inflammable and explosive mate tempering devices, distance between acetylene and oxygen cylinders shall not be less than 5M, no flat, no exposure, away from-h the permission of welding; Acetylene cylinders must be installed pressure reducing valve and antiwitfighting equipment; Must be non flammable gas or liquid when welding, testing shall be approved by the relevant departments, -rehot and approval procedures; Welding site clear inflammable, or cover, isolation, and in the welding area is equipped with fions; Welding jobs must deal with down the content gas welders must hold special certificates, operating certificate expires is not examined no welding operati-14 content security technology to give the low-2-on construction organization name project name 49 ... Construction constructi-2-down (reference tables) construction construction construction organization name project name 4-lowosit of an instrument, and filed a report. External use elevator installation and removal of security technology to give the he dep 4 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 附件: 试验名称:施用碱性肥料对酸性土壤改良效果对比试验 试验地点:平乐镇南洲村委拱桥头许昌贵 实施单位:平乐镇农业技术推广站 试验负责人:陆泉宇 试验协助人:翟基明 试验时间:2012.04--07 beting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lif undingf cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good groaulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation ohydr -updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solidprohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the val ofion, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and remontation operations, operating personnel must have professional training and with valid ID to work; Special command, coordinatdown the content strictly according to the tower crane, remove programme impleme-8 content security technology to give the lown site ... Construction construction construction organization name project name 4-2-down (reference tables) construction construction construction organization name project name 4-safety technology gives the lowcrane time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower le support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature reliabed acceptance not made the next processes work; 10, the constructiork, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and ould wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for woes; Shshould check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measurns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you colum ng in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reportie cagein a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside thshall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualifier, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopp-7 content security technology to give the low-2 5 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 一、试验地基本情况 地点:广西 省(区) 桂林 市平乐县(市、区)平乐 乡(镇) 南洲村许昌贵(农户、地块名);邮编: 542400 ;东经: 度 分 秒;北纬: 度 分 秒;海拔: m ; 土壤名称: 土类 亚类 土属 土种;土种代号: ; 成土母质: ;手感质地(沙、壤、粘): ;地下水位: 最高最通常 ;灌排能力 ;障碍因素 ;耕层厚度 低 m cm;土体构型: ;地形部位及农田建设: ;侵蚀程度 ;肥力等级 ;代表面积 亩。 试验地块前茬作物施肥情况调查 项目 前一茬 前二茬 前三茬 作物名称 马蹄 水稻 马蹄 品种名称 桂蹄1号 桂丝占 桂蹄1号 生长时期( 月— 月) 2010.08-11 2011.04-07 2011.08-11 生长期天数(天) 120 120 120 产量水平(高、中、低) 中 中 中 生长期内降水次数 生长期内降水总量(mm) 生长期内灌水水次数 3生长期内灌水总量(m/亩) 灾害情况 品种名称 花生麸 花生麸 有机肥施用 用量(公斤/亩) 200 200 实际成本(元/亩) 600 600 N 20 10 20 PO 8 4 8 25化肥施用(折合养分) KO 20 10 20 2(公斤/亩) 实际成本合计(元/亩) 420 200 420 肥料成本合计(元/亩) 1020 1020 产量(公斤/亩) 4000 400 4500 二、试验设计 1、供试作物名称及品种名称:水稻--桂丝占 2、供试肥料品种、产地、养分含量: A、尿素 柳州 N:46% B、过磷酸钙 鹿寨 P2O5:12% C、钙镁磷肥 贵州 P2O5:15% D、氯化钾 加拿大 K2O:60% E、土壞调理肥 广东 F、硅钙肥 柳州 rations, tools should be placedphalt; Before the work, should check whether the tools used are secure. Scaffolding erection firmly, not swing. Suspended opepants, hands directly contact with live long, oily materials of as down the content to enter the construction site wear hard hats, respirators and other safety gas appliances, fastening cuffs,-15 content security technology to give the low-2t qualified for acceptance or acceptance not made the next processes work; 12, targeted the construction site safety disclosu-project name 4down (reference tables) construction construction construction organization name -rproofing construction technology to give the lowt cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Wateaccep re hazard, shall not be left; 12, targeted the construction site safety disclosure; 13, the other. Disclosure signatures tohomework, noores open; 11, end of the job, the cylinder valve should be closed, screwed on safety cover, job locations, confirm the no fithe ppower supply; 10, welded storage of inflammable, explosive, toxic substances are containers or pipes must be cleaned and all accident; Is strictly prohibited in the pressure vessel and pipe welding, welding electric device you must first cut off the rningnot be placed on the workpiece or ground. With oxygen and acetylene, must not be put in a metal container to prevent gases bu e must be strictly enforcing the relevant regulations; Ignition, torch mouth were forbidden from people burning torches shallcontaminated oils; Gas bottle purchase, transport, storage and us-Oxygen cylinder, oxygen gauge and welding and cutting tools, non rials and fire distance shall not be less than 10m, verify that the leak, use soapy water, open flame is strictly prohibited;inflammable and explosive mate tempering devices, distance between acetylene and oxygen cylinders shall not be less than 5M, no flat, no exposure, away from-h the permission of welding; Acetylene cylinders must be installed pressure reducing valve and antiwitfighting equipment; Must be non flammable gas or liquid when welding, testing shall be approved by the relevant departments, -rehot and approval procedures; Welding site clear inflammable, or cover, isolation, and in the welding area is equipped with fions; Welding jobs must deal with down the content gas welders must hold special certificates, operating certificate expires is not examined no welding operati-14 content security technology to give the low-2-on construction organization name project name 49 ... Construction constructi-2-down (reference tables) construction construction construction organization name project name 4-lowosit of an instrument, and filed a report. External use elevator installation and removal of security technology to give the he depre; 13, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from t 6 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 3、处理设计: 选用水稻作为供试作物,试验设4个处理。 处理1,CK,对照,,应用测土配方施肥成果施用氮、磷、钾养分,磷素采用过磷酸钙, 处理2,磷素采用钙镁磷肥,其他与处理1相同, 处理3,在处理1的基础上施用硅钙肥50公斤/亩。 处理4,在处理2的基础上施用硅钙肥50公斤/亩。 2设置三次重复、小区面积不小于30m,采用随机区组排列。 三、田间规划 21、小区面积: 30 m,长 2.5 (m)×宽 12 (m)。 2、设置 3 次重复,采用 随机 方式排列。 3、栽培规格:株行距 20 cm× 20 cm,每小区 60 行,每行 12 株。 4、田间排列图: 2 1 4 3 4 3 2 1 1 4 2 3 beting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lif undingf cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good groaulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation ohydr updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solidprohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the val ofion, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and remontation operations, operating personnel must have professional training and with valid ID to work; Special command, coordinatdown the content strictly according to the tower crane, remove programme impleme-8 content security technology to give the low-2-down (reference tables) construction construction construction organization name project name 4-safety technology gives the lowcrane time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower le support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature reliabrk, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and ould wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for woes; Shshould check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measurns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you colum ng in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reportie cagein a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside ther, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopp-7 content security technology to give the low-2-n site ... Construction construction construction organization name project name 4ed acceptance not made the next processes work; 10, the constructioshall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualifi 7 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 四、田间工作记载 1、整地、移植时间及方式: 2012.5.2-3整地、2012.05.04移栽(植),人工。 2、施肥表 主要记载各处理每次施肥的时间、肥料品种、施用量 养分含量 各次施肥肥情况 基肥 第1次追肥 第2次追肥 第3次追肥 处PO施施施施2肥料名称 N O 用量 用量 用量 用量 K2理 5 施用 肥施用肥施用肥施用肥% % (Kg/小(Kg/小(Kg/(Kg/小% 时间 方时间 方时间 方时间 方区) 区) 小区) 区) 式 式 式 式 尿素 46 3/5 0.4 深施 10/5 0.6 撒施 12/6 0.2 撒施 过磷酸钙 12 1.5 3/5 深施 1 钙镁磷肥 15 3/5 氯化钾 60 0.4 0.3 10/5 撒施 3/5 深施 46 0.4 0.6 12/6 0.2 尿素 10/5 撒施 撒施 3/5 深施 过磷酸钙 12 3/5 2 钙镁磷肥 15 1.2 3/5 深施 氯化钾 60 0.4 0.3 10/5 撒施 3/5 深施 46 0.4 0.6 12/6 0.2 尿素 10/5 撒施 撒施 3/5 深施 过磷酸钙 12 1.5 3/5 深施 3 钙镁磷肥 15 3/5 氯化钾 60 0.4 0.3 10/5 撒施 3/5 深施 广东钙肥 2.2 3/5 深施 46 0.4 0.6 12/6 0.2 尿素 10/5 撒施 撒施 3/5 深施 过磷酸钙 12 3/5 4 钙镁磷肥 15 1.2 3/5 深施 氯化钾 60 0.4 10/5 0.3 撒施 3/5 深施 3/5 2.2 柳州硅钙肥 深施 3、灌水记录表 日期 合计 方/亩 4、降水记录表 生长期日期 合计 年降水总量 降水量 mm 8 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 5、温度记录表 项目 无霜期 ?10?积温 生长期 全年 6、主要病虫害发生期、危害程度、防治方法及效果(如处理间有差别,请分别描述): 5.15、5.25、6.6、防治病虫害,稻飞虱用扑虱灵、吡虫啉、叶蝉散,卷叶虫用茚虫威(安打)、康宽、阿维菌素、锐劲特兑水50公斤喷雾;防治效果好;危害程度轻。 6.20、7.5:防治病虫害,稻飞虱用扑虱灵,卷叶虫用茚虫威(安打)、康宽、阿维菌素、锐劲特,稻瘟病(穗瘟)用三环唑兑水50公斤喷雾;防治效果好;危害程度轻。 7、灾害性天气记载: 8、其它田间操作情况记载: 5.2-3 :把对比试验田基扶好,并用农膜将田基包裹隔离。 9、收获时间及收获方式: 2012.07.21人工电动打谷机收茯 9 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 五、观察记载 1、生育期记载表 项目 分蘖 分蘖 幼穗分 回青期 拨节期 抽穗期 成熟期 收获期 处理 初期 盛期 化初期 7.21 7.21 6(15 1 5.8 5.13 5.21 5.26 5.25 5.87.21 7.21 2 5.12 5.20 5.27 5.25 6.15 5.86.15 7.21 7.21 3 5.11 5.20 5.27 5.25 5.86.15 7.21 4 5.11 5.19 5.27 5.25 7.21 2、植株经济性状考种 植株经济性状考种表 理论亩每穗粒数 结实 项目 株高 亩有效穗 千粒重 产 率 谷/秆 其中 处理 (cm) (万穗) (g) 总粒数 (kg) (%) 实粒 秕粒 1 113 16.32 134 105 29 78.5 24.5 0.21/0.19 420.59 2 115 16.51 137 108 29 79.1 24.8 0.22/0.20 443.71 3 120 16.96 140 113 27 81 25.4 0.25/0.21 488.51 4 123 17.12 140 115 25 82.2 26.3 0.26/0.21 518.15 注:收获前每个试验点选一个重复,每个小区?形定5点,每点随机、连续定2蔸共10蔸齐地面割下带回室内进行考种调查。谷/秆=10蔸的实粒风干重/(10蔸的秕粒重+10蔸的风干稻草重)。 3、试验产量表 小区实际产量统计表 单位:kg/小区 处理 1 2 3 4 ? 18 19.5 21.42 22.43 ? 18.27 19.8 21.74 22.1 ? 17.69 19.2 21.1 22.75 平均 17.99 19.5 21.42 22.43 试验平均亩产统计表 单位:kg/亩 处理 1 2 3 4 ? 400 433 476 498 ? 406 440 483 491 ? 393 427 469 506 平均 400 433 476 498 10 shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may be 4、土壤分析测试 试验地块土壤测试结果 交换性钙取样时间 处理 pH 有机质 全氮 有效磷 速效钾 镁 基础土样 分蘖初期 幼穗分化 初期 收获后 11
/
本文档为【2012施用碱性肥料对酸性土壤改良效果对比试验总结】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索