插入音乐背景
如何在ppt中插入音乐作为几张或整个幻灯片的背景音乐
PowerPoint 2003的功能已经相当丰富,但还没有一种直接为整个幻灯片添加背景音乐的功能。虽然我们可以通过依次点击“插入-影片和声音-文件中的声音”的方法来插入音乐(图1),但是当演示到下一张幻灯片的时候音乐就会停止。因此要使整个幻灯片使用一个背景音乐似乎是不可能实现的事情。
但事实并非如此,下面我就将我在实际操作中所
的在PowerPoint中实现插入背景音乐的两种方法和大家一起分享(本文以PowerPoint 2003为例,其它版本请参照操作)。
1.依次点击“插入-影片和声音-文件中的声音”(图1),在出现的“插入声音”对话框中选中要作为背景音乐的文件,然后单击“确定”(图2),在弹出的对话框中点击“自动”按钮插入音乐对象(图3)。
Tools and personnel required: tools: large drills, turban 12.5 bit, wrenches, wooden hammer. People: three people in each group. 5. Management Essentials: the vertical box to select models, specifications are correct. bolted to avoid dead ends, to keep the bolt holes can be adjusted. choose the proper installation order. attention to material safety injury prevention, loss preventionsecond vertical box will end at the first core set at the top of the vertical box on the second vertical, leaving 20mm expansion joint, and hanging wire or to install the upper end of the beam, and so on to install. (7) the vertical installation, control process measurement on line, the three dimensions are floral, maintaining error <1mm until after installation to do full justification in the next step
2.用鼠标右键单击插入的声音对象(喇叭图标),在弹出的快捷菜单中选择“自定义动画”
(图4),在出现的“自定义动画”任务窗格中,点击刚刚插入的音乐选项右侧的下接箭头,在
出现的菜单中单击“效果选项”(图5)。
Tools and personnel required: tools: large drills, turban 12.5 bit, wrenches, wooden hammer. People: three people in each group. 5. Management Essentials: the vertical box to select models, specifications are correct. bolted to avoid dead ends, to keep the bolt holes can be adjusted. choose the proper installation order. attention to material safety injury prevention, loss preventionsecond vertical box will end at the first core set at the top of the vertical box on the second vertical, leaving 20mm expansion joint, and hanging wire or to install the upper end of the beam, and so on to install. (7) the vertical installation, control process measurement on line, the three dimensions are floral, maintaining error <1mm until after installation to do full justification in the next step
3.在弹出的“播放声音”对话框中,在“效果”标签中,在“停止播放”项下面选中“在(F):XX
张幻灯片之后”(中间XX为数字),在中间的数字增减框中输入适当的数字(图6)。
Tools and personnel required: tools: large drills, turban 12.5 bit, wrenches, wooden hammer. People: three people in each group. 5. Management Essentials: the vertical box to select models, specifications are correct. bolted to avoid dead ends, to keep the bolt holes can be adjusted. choose the proper installation order. attention to material safety injury prevention, loss preventionsecond vertical box will end at the first core set at the top of the vertical box on the second vertical, leaving 20mm expansion joint, and hanging wire or to install the upper end of the beam, and so on to install. (7) the vertical installation, control process measurement on line, the three dimensions are floral, maintaining error <1mm until after installation to do full justification in the next step
数字可以根据幻灯片的总张数来设定,比如幻灯片共有49张,那么你可以设定为50,这样就可以实现直到幻灯片结束都没有达到设定的张数,所以声音也就不会停止了。
如果插入的声音文件比较短,可以切换到“计时”标签,在“重复”后面的下拉列
框中选中“直到幻灯片末尾”项(图7),这样就可发避免因为声音文件太短,导致演示到后来没有背景音乐的情况的发生。
另外别忘了,切换到“声音设置”标签,勾选“幻灯片放映时隐藏声音图标”项(图8),这样在放映的时候小喇叭图标就不会显示了。
Tools and personnel required: tools: large drills, turban 12.5 bit, wrenches, wooden hammer. People: three people in each group. 5. Management Essentials: the vertical box to select models, specifications are correct. bolted to avoid dead ends, to keep the bolt holes can be adjusted. choose the proper installation order. attention to material safety injury prevention, loss preventionsecond vertical box will end at the first core set at the top of the vertical box on the second vertical, leaving 20mm expansion joint, and hanging wire or to install the upper end of the beam, and so on to install. (7) the vertical installation, control process measurement on line, the three dimensions are floral, maintaining error <1mm until after installation to do full justification in the next step
4.这时再放映幻灯片试试,是不是实现了背景音乐的功能了。
Tools and personnel required: tools: large drills, turban 12.5 bit, wrenches, wooden hammer. People: three people in each group. 5. Management Essentials: the vertical box to select models, specifications are correct. bolted to avoid dead ends, to keep the bolt holes can be adjusted. choose the proper installation order. attention to material safety injury prevention, loss preventionsecond vertical box will end at the first core set at the top of the vertical box on the second vertical, leaving 20mm expansion joint, and hanging wire or to install the upper end of the beam, and so on to install. (7) the vertical installation, control process measurement on line, the three dimensions are floral, maintaining error <1mm until after installation to do full justification in the next step