韩国泡菜汤的做法
1.将土豆去皮后切成片,洋葱切成丝,五花肉也切
成片、泡菜切成1口大小,大葱斜切成段备用
2.在五花肉片内调入蒜泥、姜泥、料酒、香油、白
糖和辣椒粉拌匀腌制10分钟
construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on
3.在陶锅内倒入少许芝麻油,然后放入腌制好的五
花肉片小火煎至变色,然后分别放入洋葱丝和泡菜翻炒
2分钟
4.往锅内倒入洗米水,转大火,然后调入大酱
construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on
5.将土豆片放入锅内煮2分钟后,再依次放入豆芽、
豆腐、金针菇煮至沸腾
6.最后将切好的葱段放入锅内烫熟提味即可
construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on
construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on
烹饪技巧
1、 韩国泡菜汤的变化很多,放入不同的材料就会变
化出各种新鲜的口味,作法都较相似,肉可以选用五花
肉、牛肉或鸡肉,放入海鲜的话就可以做成泡菜海鲜汤。
2、 韩国泡菜选用发酵较久,比较酸的口感更好。
construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on
3、 用洗米水做出来的汤会比较浓厚,在蒸饭的时候第一遍先用水将米轻轻地冲洗一下倒掉,然后再清洗的水即可留下。
4、 大酱也就是味增,用黄豆制作的豆酱,具体我知道的也不多,想了解更多关于韩国调料的不妨参考米桶姐为大家做的整理——韩国调料的不同应用,另外我把大酱的照片放在这里,虽然我们不识韩国字,看图还不会吗,~:)
construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on