线性代数答案第四版赵树嫄主编习题一(A) 23--39
习题一(A) 23--39
of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge
of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge
of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge
of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge
of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge
of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge
of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge
of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge
of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge
of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge
of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge
of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge
of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge
of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge
of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge
of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge
of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge
of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge
of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge
of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge