新加坡金字塔公司项目管理模式英文版(4)_[全文]
STANDARD OPERATING PROCEDURES
SOP-ST-00 STRUCTURAL WORK
Ref3>. No. Contents
SOP-ST-01 Excavation and Backfilling
SOP-ST-02 Foundation Work
SOP-ST-03 Timber Formwork
SOP-ST-04 Steel Reinforcement
SOP-ST-05 Concreting
SOP-ST-06 Lifting of Precast Hollow Core Slab
SOP-ST-07 Lifting of Precast Column
SOP-ST-08 Grouting to Precast Items
PARK HYATT SAIGON HOTEL PROJECT
STANDARD OPERATION PROCEDURE NO
SOP –ST – 06
WORK TITLE :
Lifting of precast follow core slab
APPROVED BY :
Head, Control Dept
CHECKED BY :
PROJECT MANAGER
REVISION : A
EFFECTIVE DATA : 18/5/98
WORKMANSHIP STANDARD : ACCEPTANCE /REJECTION CRITERIA
To comply with specification
REFERENCE STANDARDS/ CODES & QUALITY PLAN :
To comply with specialist requirement
FACILITIES /INSPECTION INSTRUMENT :
Hoist beam & clambers are attached with shackle/sling
ENVIRNMENT CONTROLS :
NA
NECESSARY RECORDS :
Shop drawings
FREQUENCY :
Every inspection
SPECIAL REQUIREMENTS :
NA
SAFETY & HEALTH REQUIREMENTS :
Check the safety working load for hoisting equipment
WORK PROCEDURE
CHECKING METHOD
REMEDIAL MEASURE
RESPOSIBILITY
Project Manager
Engineer
Foreman
Assistant Foreman
Trade Worker
Checker
Subcon
Others
1.When delivery arrives inform the driver where to park the trailer
2. Slabs shall be off loaded using a lifting beam and clampers or a lifting beam and bells , Both
systems are attached by shackle and sliding to the claim block of the crane
3.Check the condition of all lifting equipment
4.Place clampers at the correct position on the slabs
5. Check that area for lifting is clear
6. Once the slab is lifted slightly, attaché the safety chains around the component and latch on
the other site of the clampers
By visual
By visual
By visual
Measure by tape
By visual
By visual
Re-park again
Re – place by the correct size
Re-place by the correct size
Re-adjust
Clear the area
Re-do
F
F
F
F
F
F
C
C
C
C
C
P
P
P
P
P
P
File : ST - 06 DISK: SOP
A : APPROVE F : CONFIRM P : PERFORM
C: CHECK
PARK HYATT SAIGON HOTEL PROJECT
STANDARD OPERATION PROCEDURE NO
SOP –ST – 06
WORK TITLE :
Lifting of precast follow core slab
APPROVED BY :
Head, Control Dept
CHECKED BY :
PROJECT MANAGER
REVISION : A
EFFECTIVE DATA : 18/5/98
WORK PROCEDURE
CHECKING METHOD
REMEDIAL MEASURE
RESPOSIBILITY
Project Manager
Engineer
Foreman
Assistant Foreman
Trade Worker
Checker
Subcon
Others
7.Hoist the slab to the installation location and lower it slowly into the correct position.
8.Once the slab is in position and seated safety, the safety chains are released , clampers are
removed to pick up the next slab
9.Check that the position of the slab is correct
10.If the slab is seated in the wrong location, adjust by using a crowbar
By visual
By visual
By visual
By visual
Re-do
Re-do
Re-do
Re-do
A
F
F
F
F
C
C
C
C
P
P
P
P
File : ST - 06 DISK: SOP
A : APPROVE F : CONFIRM P : PERFORM
C: CHECK
PARK HYATT SAIGON HOTEL PROJECT
STANDARD OPERATION PROCEDURE NO
SOP –ST – 07
WORK TITLE :
Lifting of precast column
APPROVED BY :
Head, Control Dept
CHECKED BY :
PROJECT MANAGER
REVISION : A
EFFECTIVE DATA : 18/5/98
WORKMANSHIP STANDARD : ACCEPTANCE /REJECTION CRITERIA
To comply with specification
REFERENCE STANDARDS/ CODES & QUALITY PLAN :
To comply with specialist requirement
FACILITIES /INSPECTION INSTRUMENT :
ENVIRNMENT CONTROLS :
NA
NECESSARY RECORDS :
Shop drawings
FREQUENCY :
Every inspection
SPECIAL REQUIREMENTS :
SAFETY & HEALTH REQUIREMENTS :
Check the safety working load for hoisting equipment
WORK PROCEDURE
CHECKING METHOD
REMEDIAL MEASURE
RESPOSIBILITY
Project Manager
Engineer
Foreman
Assistant Foreman
Trade Worker
Checker
Subcon
Others
1.When delivery arrives inform the driver where to park the trailer
2.Check the condition of all lifting equipment
3.Mrak a straight line at the center of two sides of the column, to check the alignment after
installation.
4.Check that area for lifting is clear
5.Lift the column from the trailer to a location close to the installation position.
6.Insert the lifting pin through the column and lift from its resting position.
By visual
By visual
By theodolite & dumpy level
By visual
By visual
By visual
Re- park
Re-pair
Re-do
Clear the area
Re-do
Re-do
F
F
F
F
F
F
C
C
C
C
C
C
P
P
P
P
P
P
File : ST - 07 DISK: SOP
A : APPROVE F : CONFIRM P : PERFORM
C: CHECK
PARK HYATT SAIGON HOTEL PROJECT
STANDARD OPERATION PROCEDURE NO
SOP –ST – 07
WORK TITLE :
Lifting of precast column
APPROVED BY :
Head, Control Dept
CHECKED BY :
PROJECT MANAGER
REVISION : A
EFFECTIVE DATA : 18/5/98
WORK PROCEDURE
CHECKING METHOD
REMEDIAL MEASURE
RESPOSIBILITY
Project Manager
Engineer
Foreman
Assistant Foreman
Trade Worker
Checker
Subcon
Others
7.The column is then hoisted slowly to upright position and raised above the right of the starter bars
8.Lower the column down so that starter bars slot neatly into the correct ducts
9.The column is then lowered to its seated position with the aid of slim plates to adjust the level ensure that the base of the column is seated on the slim plates and there are no obstructions.
10. Props ate then secured and fastened both to the column and floor
11.Crane is released to pick the next column
By visual
By visual
Dumpy level
By visual
By visual
Re- do
Re-do
Re-adjust
Re-do
Re-do
F
F
F
F
F
F
C
C
C
C
C
C
P
P
P
P
P
P
File : ST - 07 DISK: SOP
A : APPROVE F : CONFIRM P : PERFORM
C: CHECK
PARK HYATT SAIGON HOTEL PROJECT
STANDARD OPERATION PROCEDURE NO
SOP –ST – 08
WORK TITLE :
Grouting to precast items
APPROVED BY :
Head, Control Dept
CHECKED BY :
PROJECT MANAGER
REVISION : A
EFFECTIVE DATA : 18/5/98
WORKMANSHIP STANDARD : ACCEPTANCE /REJECTION CRITERIA
To comply with specification
REFERENCE STANDARDS/ CODES & QUALITY PLAN :
To comply with specialist requirement
FACILITIES /INSPECTION INSTRUMENT :
Gout mixer/stirrer . pail , measurement jug
ENVIRNMENT CONTROLS :
NA
NECESSARY RECOR NA
FREQUENCY :
Every inspection
SPECIAL REQUIREMENTS :
NA
SAFETY & HEALTH REQUIREMENTS :
NA
WORK PROCEDURE
CHECKING METHOD
REMEDIAL MEASURE
RESPOSIBILITY
Project Manager
Engineer
Foreman
Assistant Foreman
Trade Worker
Checker
Subcon
Others
1.Ensure firstly that the base of the column is cleat , free from dirt and debris
2.Check that the grouting sleeve is clear
3.The base of the column is then seated off and formed up by means of timber formwork
4.Grout mixer /stirrer , pail, measuring jug to be made available
5.The grouting is then mixed by pouring the measured volume of water with a stirrer
6.After mixing is completed , pour/pump into the grouting holes of the column
By visual
By visual
By visual
Measure by visual
By visual
By visual
Check debris
Clear debris
Re –seal up
Get ready
Re –do
Re-do
F
F
F
F
F
F
C
C
C
C
C
C
P
P
P
P
P
P
File : ST – 08 DISK: SOP
A : APPROVE F : CONFIRM P : PERFORM
C: CHECK
PARK HYATT SAIGON HOTEL PROJECT
STANDARD OPERATION PROCEDURE NO
SOP –ST – 08
WORK TITLE :
Grouting to precast items
APPROVED BY :
Head, Control Dept
CHECKED BY :
PROJECT MANAGER
REVISION : A
EFFECTIVE DATA : 18/5/98
WORK PROCEDURE
CHECKING METHOD
REMEDIAL MEASURE
RESPOSIBILITY
Project Manager
Engineer
Foreman
Assistant Foreman
Trade Worker
Checker
Subcon
Others
7. After 24 hours props can be released
By visual
NA
F
C
P
File : ST – 08 DISK: SOP A : APPROVE F : CONFIRM P : PERFORM C: CHECK