为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

湖南二氧化氯发生器厂家,CCTV展播品牌湘怡源生

2018-04-14 14页 doc 46KB 15阅读

用户头像

is_215732

暂无简介

举报
湖南二氧化氯发生器厂家,CCTV展播品牌湘怡源生湖南二氧化氯发生器厂家,CCTV展播品牌湘怡源生 湖南二氧化氯发生器厂家 CCTV展播品牌湘怡源生 ? 湘怡源生二氧化氯发生器 湖南源生环保设备有限公司 Hunan Yuansheng EnvironmentaL Protection Equipment co.;Ltd that summarizes data in a timely manner, practice of the commissioning process. Requirements can skilled, and right to using...
湖南二氧化氯发生器厂家,CCTV展播品牌湘怡源生
湖南二氧化氯发生器厂家,CCTV展播品牌湘怡源生 湖南二氧化氯发生器厂家 CCTV展播品牌湘怡源生 ? 湘怡源生二氧化氯发生器 湖南源生环保设备有限公司 Hunan Yuansheng EnvironmentaL Protection Equipment co.;Ltd that summarizes data in a timely manner, practice of the commissioning process. Requirements can skilled, and right to using test instrument, and do test records, and can in test process in the found problem, timely reported problem third section electrical system debugging low voltage cable test 5.3.1.1 first should in electrical apparatus not installation Qian for line insulation test: will lamp box within wire separate, switch box within wire connected, test Shi should will route and extension separate, a people test, a people timely readings and records. 5.3.1.2 second in electrical apparatus, electric box all after installation (before transmission) to test: 1, line switch on the switch, instruments, equipment and other electrical disconnect switch all in position, the test method described in the above, confirm that the insulation test after trial operation of transmission. 2, 1kV megohmmeter 1kV cables, test the cables, insulation resistance 10M ω or more. 3, wiring insulation 500V, range 0~500M ω-megohmmeter. 4, when measuring the insulation resistance, Megger has three labeled "ground (e)", "line (l)", "protection ring (G)" Terminal, respectively shall be measured with the e and l on the two side buttons. 5.3.1.3 testing instruments ready for test instruments the following table:d Distribution box debugging 5.3.2.1 equipment check number checks 1 distribution 一、二氧化氯介绍 二氧化氯是一种黄绿色或橙色的气体,与氯有相似的难闻的臭味和类似硝酸的气味,灭菌能力强,杀生速度快,对异养菌、铁细菌、硝化细菌、硫酸盐还原菌等具有良好的灭杀效果。 与此同时,二氧化氯具有药效持续时间长,受氨影响小的特性,因此,二氧化氯广泛用于饮用水消毒等方面,具有杀菌效果好,持续时间长,无致癌物质产生,其灭藻效果也相当好等特点。 但二氧化氯性质活泼,不易贮存和运输,当CLO2气体很薄时,具有臭氧味,其性质不稳定,只能现场制备使用。目前我国内外饮水消毒使用二氧化氯都采用现场制备的方式,能现场制备二氧化氯的装置叫做二氧化氯发生器。二氧化氯发生器,其发生有化学法和电解法两大类。 电解法二氯发生器因为投资少、运行费用低,使用安全可靠等特点,进速得到了推广,目前已广泛用于饮用水,游泳池水、医院污水、工业循环水等领域。但作为一种操作简单、用途广、环保节能的二氧化氯制备器材,目前市场上使用的二氧化氯发生器多有不合格产品,在选择的时候一定要慎重选择。 二、适应消毒范围 二氧化氯是一种黄绿色或橙色的气体,与氯有相似的难闻的臭味和类似硝酸的气味,可有效地杀灭细菌。无毒、无害的消毒剂, 二that summarizes data in a timely manner, practice of the commissioning process. Requirements can skilled, and right to using test instrument, and do test records, and can in test process in the found problem, timely reported problem third section electrical system debugging low voltage cable test 5.3.1.1 first should in electrical apparatus not installation Qian for line insulation test: will lamp box within wire separate, switch box within wire connected, test Shi should will route and extension separate, a people test, a people timely readings and records. 5.3.1.2 second in electrical apparatus, electric box all after installation (before transmission) to test: 1, line switch on the switch, instruments, equipment and other electrical disconnect switch all in position, the test method described in the above, confirm that the insulation test after trial operation of transmission. 2, 1kV megohmmeter 1kV cables, test the cables, insulation resistance 10M ω or more. 3, wiring insulation 500V, range 0~500M ω-megohmmeter. 4, when measuring the insulation resistance, Megger has three labeled "ground (e)", "line (l)", "protection ring (G)" Terminal, respectively shall be measured with the e and l on the two side buttons. 5.3.1.3 testing instruments ready for test instruments the following table:d Distribution box debugging 5.3.2.1 equipment check number checks 1 distribution 氧化氯消毒处理在我国工艺成熟,效果好,经验丰富,已经广泛用于:医院、卫生、临床器械的消毒、灭菌、除臭的防霉处理;配置各种口腔消毒液、除臭剂及创口清洗液等;面粉与各种食品的漂白剂;电镀含氰废水的破氰处理、印染废水的脱色处理,工业徨冷却水的除藻灭菌处理;废水回用中的灭菌及脱臭;家庭、宾馆、饭店、水果蔬菜、鱼肉等食品的保鲜及最终淋洗消毒;造纸、印染行业的漂白药剂;中水回用中的灭菌及除异味。 三、公司产品介绍 (一)产品描述 “湘怡源生”牌YS-CD-HP-?型和YS-CD-HP-?型二氧化氯发生器是我公司(湖南源生环保设备有限公司)自主研发的采用正压反应、正压投加的智能型现制现用二氧化氯消毒设备。设备以“亚氯酸钠”和“盐酸”为反应原料,通过余二氧化氯或流量信号控制设备二氧化氯的产量,高效制取纯二氧化氯消毒液。其优点在于无需投加任何化学药剂,不影响水的物理性质和化学成分,不增加水的臭和味,操作简单,便于管理,易于实现自动化。设备整体构坚固耐用,系统运行速度快,节省空间等许多特点。设备具备缺料、故障信号显示和自动报警功能,是一款实用性很强的高纯型二氧化氯设备。 湘怡源生”牌YS-CD-HP-?型和YS-CD-HP-?型二氧化氯发生器电解发生所产生的以C102为主,混有C12、O3、H202等多种强氧化剂,具有极强的氧化和杀菌能力,能杀灭水中各种芽孢病毒。 that summarizes data in a timely manner, practice of the commissioning process. Requirements can skilled, and right to using test instrument, and do test records, and can in test process in the found problem, timely reported problem third section electrical system debugging low voltage cable test 5.3.1.1 first should in electrical apparatus not installation Qian for line insulation test: will lamp box within wire separate, switch box within wire connected, test Shi should will route and extension separate, a people test, a people timely readings and records. 5.3.1.2 second in electrical apparatus, electric box all after installation (before transmission) to test: 1, line switch on the switch, instruments, equipment and other electrical disconnect switch all in position, the test method described in the above, confirm that the insulation test after trial operation of transmission. 2, 1kV megohmmeter 1kV cables, test the cables, insulation resistance 10M ω or more. 3, wiring insulation 500V, range 0~500M ω-megohmmeter. 4, when measuring the insulation resistance, Megger has three labeled "ground (e)", "line (l)", "protection ring (G)" Terminal, respectively shall be measured with the e and l on the two side buttons. 5.3.1.3 testing instruments ready for test instruments the following table:d Distribution box debugging 5.3.2.1 equipment check number checks 1 distribution (二)反应原理 将一定浓度或饱和盐液力口入电解槽阳极室,同时将清水加入电 解槽阴极室,接通12V直流电源开始电解,即可产生C102、C12、03、 H202等混合消毒剂,经水射器负压管脚争气体吸入水中消毒。 其反应公式为: 一类反应原理:5NaCLO2+4HCL=4CLO2+5NaCL+2H 2O 或 2NaCLO3+H2O2+H2SO4=2CLO2+Na2SO4+O2+2H2O 2NaCLO2+NaCLO+2HCL=2CLO2+3NaCL+H2O 二类反应原理:NaCLO3+2HCL=CLO2+1/2CL2+NaCL+H2O (三)系统组成 “湘怡源生”牌YS-CD-HP-?型和YS-CD-HP-?型二氧化氯发生 器由止回阀、计量泵、水射器、发生器、PLC控制器及配套管道、阀 门、仪表等组成。整体性强,体积小,重量轻,外形美观。 (四)使用原料 一类使用原料:亚氯酸钠(工业一级品,含量?85%)工业合成 盐酸(浓度?31%) 或,浓硫酸(工业一级品,浓度83.0?2.0%)氯酸钠(工业一级 品,含量?99%)过氧化氢(工业合格品,含量?27.5%) 次氯酸钠 10% 二类使用原料:氯酸钠(工业一级品,含量?99%)工业合成盐 that summarizes data in a timely manner, practice of the commissioning process. Requirements can skilled, and right to using test instrument, and do test records, and can in test process in the found problem, timely reported problem third section electrical system debugging low voltage cable test 5.3.1.1 first should in electrical apparatus not installation Qian for line insulation test: will lamp box within wire separate, switch box within wire connected, test Shi should will route and extension separate, a people test, a people timely readings and records. 5.3.1.2 second in electrical apparatus, electric box all after installation (before transmission) to test: 1, line switch on the switch, instruments, equipment and other electrical disconnect switch all in position, the test method described in the above, confirm that the insulation test after trial operation of transmission. 2, 1kV megohmmeter 1kV cables, test the cables, insulation resistance 10M ω or more. 3, wiring insulation 500V, range 0~500M ω-megohmmeter. 4, when measuring the insulation resistance, Megger has three labeled "ground (e)", "line (l)", "protection ring (G)" Terminal, respectively shall be measured with the e and l on the two side buttons. 5.3.1.3 testing instruments ready for test instruments the following table:d Distribution box debugging 5.3.2.1 equipment check number checks 1 distribution 酸(浓度?31%) (五)原料消耗 100g水需配置36gNACL,耗电5.00w。 (六)工作原理 设备采用电解氯化钠产生二氧化氯协同消毒剂,原料仅消耗氯化钠和水,在消毒过程中,二氧化氯发生器能够利用智能型恒流电解电源将交流电变为电压不超过12伏(安全电压)的直流电,将一定浓度或饱和盐液力口入电解槽阳极室,同时将清水加入电解槽阴极室,在带有特殊电极板和电解隔膜的电解槽内电解饱和氯化钠水溶液,产生C102、C12、03、H202等混合消毒剂,经水射器负压管脚争气体吸入水中消毒。消毒剂投加系统自动将设备产生的二氧化氯协同消毒剂投加到待消毒水体中,达到消毒处理的目的。 四、发生器的特点 二氧化氯发生器是一种操作简单、用途广、环保节能的二氧化氯制备器材。我公司(源生环保设备有限公司)独立自主研发的“湘怡源生”牌YS-CD-HP-?型和“湘怡源生”牌YS-CD-HP-?型二氧化氯发生器阳极使用寿命长达5,7年;电解槽自动温控冷却,运行稳定连续;电源性能可靠,采用可控硅直流电源;耐腐蚀性能强,电解槽为优质钢材及聚氯乙烯塑料;隔膜电导率高,更换方便;所有接管、阀门采用ABS工程塑料。 “湘怡源生”牌YS-CD-HP-?型和“湘怡源生”牌YS-CD-HP-?that summarizes data in a timely manner, practice of the commissioning process. Requirements can skilled, and right to using test instrument, and do test records, and can in test process in the found problem, timely reported problem third section electrical system debugging low voltage cable test 5.3.1.1 first should in electrical apparatus not installation Qian for line insulation test: will lamp box within wire separate, switch box within wire connected, test Shi should will route and extension separate, a people test, a people timely readings and records. 5.3.1.2 second in electrical apparatus, electric box all after installation (before transmission) to test: 1, line switch on the switch, instruments, equipment and other electrical disconnect switch all in position, the test method described in the above, confirm that the insulation test after trial operation of transmission. 2, 1kV megohmmeter 1kV cables, test the cables, insulation resistance 10M ω or more. 3, wiring insulation 500V, range 0~500M ω-megohmmeter. 4, when measuring the insulation resistance, Megger has three labeled "ground (e)", "line (l)", "protection ring (G)" Terminal, respectively shall be measured with the e and l on the two side buttons. 5.3.1.3 testing instruments ready for test instruments the following table:d Distribution box debugging 5.3.2.1 equipment check number checks 1 distribution 型二氧化氯发生器最大的特点在于设备的自动控制系统功能十分强大,LED显示屏可动态显示设备运行的各种工艺参数(温度、压力、液位、投加量、出水余二氧化氯及进水流量等),并可进行手动和自动模式的相互切换。 如有疑问,可以拨打我公司热线电话:400—8233—116随时接受客户的求助和为客户提供技术支持。 五、产品注意事项 1.确定消毒剂投加点和水射器、设备安装位置: 确定消毒剂投加点和水射器、设备安装位置; 安装水射器,并将管道连接到投加点;将设备摆放到适当位置,把水射器同设备连接;安装设备各部件,并检查各接口是否漏气。 2.各个管路之间的连接,管件之间的连接,一定要用专用胶粘好而不能有泄露。 3.反应器排污管要单接,不要和其他的排污管连在一起。原料罐的排污和水箱的不可以连在一起。 4.反应器安全管一定要接到室外,一般不高于设备高度;在室外的管头处应加一个三通。 5.设备没有完全安装好之前禁止给设备通电。 6.所有部件安装好以后,给反应器和水箱加水,反应器加到1/4左右;水箱加满。 that summarizes data in a timely manner, practice of the commissioning process. Requirements can skilled, and right to using test instrument, and do test records, and can in test process in the found problem, timely reported problem third section electrical system debugging low voltage cable test 5.3.1.1 first should in electrical apparatus not installation Qian for line insulation test: will lamp box within wire separate, switch box within wire connected, test Shi should will route and extension separate, a people test, a people timely readings and records. 5.3.1.2 second in electrical apparatus, electric box all after installation (before transmission) to test: 1, line switch on the switch, instruments, equipment and other electrical disconnect switch all in position, the test method described in the above, confirm that the insulation test after trial operation of transmission. 2, 1kV megohmmeter 1kV cables, test the cables, insulation resistance 10M ω or more. 3, wiring insulation 500V, range 0~500M ω-megohmmeter. 4, when measuring the insulation resistance, Megger has three labeled "ground (e)", "line (l)", "protection ring (G)" Terminal, respectively shall be measured with the e and l on the two side buttons. 5.3.1.3 testing instruments ready for test instruments the following table:d Distribution box debugging 5.3.2.1 equipment check number checks 1 distribution 7.二氧化氯专用料一定要溶解完全。 六、公司售后服务 (一)质量保证承诺 本公司对所销售的设备,免费保修1年,设备终生维护。在保修期间,凡属设备非人为、天灾、暴力等原因造成设备损坏的,均由本公司负责维修。 关于服务承诺和具体保修事宜,请参见《保修卡》。 (二)售后服务承诺 本工程质保期:设备主机为验收投产后12个月;辅助设备为验收投产后12个月,质保期内免费保修,终身维护,质保期后,只收取元器件成本费,免收服务费。 鉴于目前国内某些地区供电电源现状,电压不仅超过国家的规定,也超过了我公司的产品的许可范围,如有些地区电源电压小于198V或高于242V,电源的超范围波动影响设备的使用,甚至造成损坏。设备与计量泵的供电范围为?10%标准电压(详细数据请参见相关说明书中的技术信息)。 对于目前电源电压波动或浪涌电压超过允许范围的地区或单位,敬请加装交流稳压电源设备。对电源电压超范围而导致的设备损失,我公司为业主提供原价备品备件、易损件时将收取费,并继续提供业主所需要的技术服务。承诺主要设备保证在8年内可提供该产品的更换件或不低于该级别的替代件,且能满足原系统中的应用要求。 that summarizes data in a timely manner, practice of the commissioning process. Requirements can skilled, and right to using test instrument, and do test records, and can in test process in the found problem, timely reported problem third section electrical system debugging low voltage cable test 5.3.1.1 first should in electrical apparatus not installation Qian for line insulation test: will lamp box within wire separate, switch box within wire connected, test Shi should will route and extension separate, a people test, a people timely readings and records. 5.3.1.2 second in electrical apparatus, electric box all after installation (before transmission) to test: 1, line switch on the switch, instruments, equipment and other electrical disconnect switch all in position, the test method described in the above, confirm that the insulation test after trial operation of transmission. 2, 1kV megohmmeter 1kV cables, test the cables, insulation resistance 10M ω or more. 3, wiring insulation 500V, range 0~500M ω-megohmmeter. 4, when measuring the insulation resistance, Megger has three labeled "ground (e)", "line (l)", "protection ring (G)" Terminal, respectively shall be measured with the e and l on the two side buttons. 5.3.1.3 testing instruments ready for test instruments the following table:d Distribution box debugging 5.3.2.1 equipment check number checks 1 distribution 如果设备出现问题,客户来电后,一个小时内响应。如果需要我们的维修人员到现场去,我们将在24小时内派人到达现场。 (三)人员培训计划 为确保本项目二氧化氯成套设备交付使用后正常运行,水质达标,运行成本最低,同时为尽快让二氧化氯成套设备的运行与工程的正常生产相适应,使运行人员能尽快熟悉和掌握设备的运行操作,提高整个系统的可靠性和稳定性,我公司制定如下培训计划: (四)培训目标 对高级维护人员,我们将详细讲解二氧化氯系统控制原理,熟悉设备性能、参数、硬件配置进行操作、安装、维护;能对系统进行日常的维护、仪器仪表的定期整定等。 对操作、安装、维护人员,我们除了详细介绍二氧化氯系统控制原理,还讲解设备维修保养知识和现场操作要领,使其能熟悉系统,正确操作,合理、准确修改权限内参数,借助于自控系统。保证设备正常运行和出水水质。 (五)培训方式 实地运行操作:由我公司专业现场工程师手把手、理论联系实际深入浅出的讲解和操作。 培训对象和人数(计划) 高级维护人员,1-2名;自动化控制专业大专以上文化水平。 安装、维护人员,1-5名;电子电器专业中专以上文化水平。 (六)培训 that summarizes data in a timely manner, practice of the commissioning process. Requirements can skilled, and right to using test instrument, and do test records, and can in test process in the found problem, timely reported problem third section electrical system debugging low voltage cable test 5.3.1.1 first should in electrical apparatus not installation Qian for line insulation test: will lamp box within wire separate, switch box within wire connected, test Shi should will route and extension separate, a people test, a people timely readings and records. 5.3.1.2 second in electrical apparatus, electric box all after installation (before transmission) to test: 1, line switch on the switch, instruments, equipment and other electrical disconnect switch all in position, the test method described in the above, confirm that the insulation test after trial operation of transmission. 2, 1kV megohmmeter 1kV cables, test the cables, insulation resistance 10M ω or more. 3, wiring insulation 500V, range 0~500M ω-megohmmeter. 4, when measuring the insulation resistance, Megger has three labeled "ground (e)", "line (l)", "protection ring (G)" Terminal, respectively shall be measured with the e and l on the two side buttons. 5.3.1.3 testing instruments ready for test instruments the following table:d Distribution box debugging 5.3.2.1 equipment check number checks 1 distribution 熟悉工艺、设备的操作顺序; 熟悉二氧化氯发生器控制系统的基本组成、运行、管理; 掌握设备、仪表的日常维护、保养的方法; 了解设备、仪表的工作基本原理和故障的。 that summarizes data in a timely manner, practice of the commissioning process. Requirements can skilled, and right to using test instrument, and do test records, and can in test process in the found problem, timely reported problem third section electrical system debugging low voltage cable test 5.3.1.1 first should in electrical apparatus not installation Qian for line insulation test: will lamp box within wire separate, switch box within wire connected, test Shi should will route and extension separate, a people test, a people timely readings and records. 5.3.1.2 second in electrical apparatus, electric box all after installation (before transmission) to test: 1, line switch on the switch, instruments, equipment and other electrical disconnect switch all in position, the test method described in the above, confirm that the insulation test after trial operation of transmission. 2, 1kV megohmmeter 1kV cables, test the cables, insulation resistance 10M ω or more. 3, wiring insulation 500V, range 0~500M ω-megohmmeter. 4, when measuring the insulation resistance, Megger has three labeled "ground (e)", "line (l)", "protection ring (G)" Terminal, respectively shall be measured with the e and l on the two side buttons. 5.3.1.3 testing instruments ready for test instruments the following table:d Distribution box debugging 5.3.2.1 equipment check number checks 1 distribution
/
本文档为【湖南二氧化氯发生器厂家,CCTV展播品牌湘怡源生】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索