为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

少先队鼓号队总谱

2017-09-17 31页 doc 475KB 192阅读

用户头像

is_888153

暂无简介

举报
少先队鼓号队总谱少先队鼓号队总谱 0套 间奏鼓 circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance ...
少先队鼓号队总谱
少先队鼓号队总谱 0套 间奏鼓 circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high 第一套 开场曲 circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high 第二套 进行曲 circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high 第三套 出旗曲 circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high 第四套 退旗曲 circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high 第五套 颁奖曲 circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high 第六套 授巾曲 circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high 第七套 检阅曲 circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high 第八套 宣誓曲 circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high 第九套 迎宾曲 circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high 第十套 欢送曲 circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high 乐器的规格及演奏动作 大鼓:根据少年儿童身体发育的特点,少先队所用大鼓直径左右,鼓宽。演奏时右手持执,击鼓方法有斜线击鼓法和垂直击鼓法。 大擦:大擦直径—。双手持擦位于胸前,演奏强拍时,右手向右下方,左手向左上方运行,弱拍相反。 中擦:中擦直径,双手持擦位于胸前,中擦的演奏方法与大擦相同。 小擦:小擦直径,直立持擦位于胸前,小擦中心孔与上衣第二纽扣相平,大小臂夹角约度。 小鼓:小鼓直径—,鼓宽—,队员将小鼓挂在身体的右侧,鼓面稍向右倾,鼓挂钩与上衣第四纽扣相平。持执方法有三种:向上持执法,向下持执法和自然持执法,少先队鼓号队多采用自然持执法。 少年号:少年号长,号口直径,单弯管,降调。持号方法:右手持号,持号部位与号嘴处相距左右,休止时将号口夹于肘关节部位,大小臂夹角约度,号弯管与地面平行。演奏时将号平举。 吹号的训练要领: circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high 口型:吹号时两腮要收紧,不要鼓腮,号嘴要摆正,放在上下嘴唇的中间部位,持号的手不要过于用力,要放松一些。 呼吸:采用胸腹式呼吸方法,用口鼻同时吸气。 发音:正确的发音是嘴唇通过气流发生振动,高音嘴唇紧,出气少,力度较强,低音嘴唇松,出气多,力度较弱。 我们介绍四首号曲练习: 长音练习: 吐音练习: 吐音是通过舌头的运动产生的,发出“吐吐吐”的声音。 分音符吐音练习: 号曲练习(二) circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high 分音符吐音练习: 号曲练习(三) 节奏感测试 circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high 鼓号队指挥 一、指挥的素质 要想培养一支优秀的鼓号队,首先要培养一名优秀的指挥,鼓号队指挥的水平代着鼓号队的演奏水平。一名优秀的指挥能够带领队员应付各种复杂的场面,沉着冷静,灵活果断,所以,指挥是全队的核心。选择指挥有三点要注意:第一,身材较高,形体较好,聪明好学,反应灵敏;第二,具有良好的节奏感和一定的组织能力;第三,经过训练,能够掌握主要乐器的演奏方法。 二、指挥动作 1、持旗立正:右手握旗,指挥旗贴于右肩,成立正姿势站好。 2、持乐器:双手握旗至下而上直臂高举,两手间隔约60公分左右,队员见此指令,大鼓队员挂鼓,其他队员持乐器成立正姿势站好。 3、预备:持乐器动作完成后,右手将旗高举,从正面看,指挥旗在身体的右侧,从侧面看,旗与人体中垂线夹角约30度,队员见此指令,持乐器成演奏姿势站好。 4、起式:预备动作完成后,指挥旗向右肩方向移动,1 拍完成,而后,还原于预备动作位置,1拍完成。这两个预领动作是向队员表示演奏的速度,演奏速度快,动作则快,演奏速度慢,动作则慢。还原于预备动作后,迅及向下落旗至上衣第4纽扣处,落旗乐起,(鼓乐曲演奏速度每分钟116拍至120拍),所以,指挥的运行动作要和行进速度相吻合。 5、运行:指挥2/4拍鼓号曲,强拍向下运行,与上衣第4纽扣相平,弱拍向上运行,与上衣第2 纽扣相平。强弱拍运行间距离约20公分左右,运行时指挥旗稍向前倾。 6、收式:指挥在乐曲结束的前4小节将旗高举,在乐曲结束前两小节的第一拍向肩部方向运动,一拍完成,而后还原于预备动作位置,一拍完成,落旗结束。 7、下乐曲:下乐曲动作与持乐器动作相反,见此动作,大鼓队员摘鼓,其他队员持乐器成立正姿势站好。 8、队形展开动作:右手持旗,两手平举,旗杆向右与两手在一条水平线上。 9、队形收缩动作:两手在胸前交叉,左手在下,立掌,右手在上持旗,旗杆水平指向右方。10、指挥左手辅助指令:(用左手表示演奏程序) circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high 第零套: 将左手高举成握拳状。 第一套: 伸出食指,其余四指成空握拳状。 第二套: 伸出食指、中指。将拇指、小指、无名指并于掌心。 第三套: 伸出食指、中指、无名指。将拇指、小指并于掌心。 第四套: 将拇指并于掌心,伸出其余四指。 第五套: 将五指伸开。 第六套: 伸出拇指、小指,其余三指向掌心弯曲。 第七套: 将五指指尖并拢在一起。 第八套: 将拇指、食指伸开,其余三指向掌心弯曲。 第九套: 将食指伸开,指关节自然弯曲成“勾”状,其余四指成握拳状。 第十套: 将拇指伸开向下,其余四指握拳状。 指挥鼓号队要敲哪套,必须出示左手指令。 规范持器乐姿势(行进中) 一、大鼓: (不演奏)上端切点与上衣第1 纽扣相平,不能挂下。挂带十字交叉于背部,左右手前后自然摆动。 (演奏)见指挥举旗(棒),右手持槌儿高举过头,从侧方看与人体夹角30 度,左手扶握大鼓左上方鼓卡。 circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high 击鼓方法:强拍向下运行,弱拍向上运行,演奏1小节打一强拍时(1拍延长音1 ×01),将槌儿挥舞过头,而后落槌。演奏8 分音符时,垂直击鼓(平击)。 二、大镲: (不演奏)用尼龙绳将镲系劳,绳长短以队员能3 个手指为宜。镲绸0.6 ×0.6米。双手持镲前后自然摆动。 (演奏)双手持镲位于胸前,镲面稍向左倾,镲中孔与上衣第2 纽扣相平,演奏强拍左手向左上方,右手向右下方运行,弱拍相反。演奏1小节一强拍时(1拍延长音1×01),左手向左上方,右手向右下方挥舞大镲。从正前方看,双臂伸直,与人体夹角30 度,闭击演奏时,可双镲合扣一起。 三、小镲: (不演奏)同大镲。镲绸0.4 ×0.4米。 (演奏)双手持镲位于胸前,镲中孔与上衣第2 纽扣相平,大小臂夹角60 度。闭击演奏可以双镲合扣,也可以右镲垂直轻磕左镲中部,在休止符处压住左镲。 四、小鼓: (不演奏)在身体右侧挂鼓,左肩右挂,鼓面稍向右倾,鼓圈与上衣第4 纽扣相平,双手各持槌,前后自由摆动。 (演奏)双手持槌儿高于鼓面,采用左手虎口向上,右手虎口向下的自然持槌法演奏,第四套退旗曲,小鼓队员在击鼓圈演奏时(符号 ),可用鼓槌击小鼓上部鼓圈,也可用双槌打花棒,打花棒时,用一只鼓槌敲击另一鼓槌的头、尾部。 五、小号、少年号: 小号带有三个话塞键,又叫三音号。少年号单弯管号,又叫青年号。少年号右手持号,不演奏时,将号口夹于肘关节部位,大小臂夹角约90度,号弯管与地面平行。演奏时将号平举,单手举号。小号右手持号,不演奏时,号位于胸前,号口朝下。演奏时双手持号,将号平举。 队列与步伐 circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high 一、向左、右转:以左(右)脚为轴,向左(右)转90 度,不准自由左转弯、右转弯、向后转,按向右转动要领向后转180 度。队伍行进中不能倒退,横着走。 二、踏步走:抬脚时,脚尖自然下垂,距地面约10公分,踏步速度每分钟 116 拍至120 拍。 三、走位时间:行进走位总时间以3 至5 分钟为宜,时间过短不能完成图形的调度,过长会给人以拖沓的感受。每个设计图形定位时间以8 秒至16 秒为宜,定位时间短,图形连续变换,看不出图形要点,定位时间长,视觉单调。 四、行进走位原则:宁紧勿松,多方少圆,动作敏捷,速度稳定。 五、整场演奏不能超过8 分钟,参队以0 套为间奏曲,上下场可打0 套间奏曲,也可以直接奏指定套曲。 服装与鼓号旗 一、服装的选择要有少先队鼓号队的明显标志,颜色要协调,色彩搭配要合理,指挥着装要与队员有明显区别。鞋、帽、袜子、手套要与服装配套,袜子、手套均为白色,鞋子一般用白色胶底或穿白色靴子。 二、大鼓、小鼓、号上要装饰有星星火炬的鼓旗、号旗。指挥棒上要有指挥旗。 比赛评分标准 一、 队容整齐、服装美观、精神面貌好;二、组织纪律性强,服从指挥; 三、上下场不拖沓,干脆利落; 四、鼓乐队乐器配置和编队符合规定;五、各种乐器演奏动作、演奏速度准确; 六、指挥动作规范; 七、队形变换美观、整齐、设计新颖; circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high
/
本文档为【少先队鼓号队总谱】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索