pes2013《实况足球2013》初始阵容开档,大师联赛全109。
《实况足球2013》初始阵容开档。。大师联赛全109。 初始阵容开档,数据高的有钱也不来。。。好吧,买80多、甚至75的自己慢慢练吧,漫长的等待到了2021年,终于全上109了~呃。。。除了门将。。。
下图,主力整容:
涅兰德纳:团队配合高,但是已经到极限了,成长缓慢,所以和岁数小的德尼轮着打主力,谁状态好谁上。
弗兰:给前腰做替补,不打前锋或影锋。久巴疲劳轮休时候用梅赫梅迪打前锋,弗兰在身后打前腰。
格拉查:打中前卫,给斯米尔恰克做替补(常年板凳)
其他基本对位替补没啥特殊的了。
满了
from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order
附两大BT战士,在编辑模式 国家队选拔中 能找到其人,不是假人。
from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order
from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order
斯米尔恰克拿了好几年欧洲足球先生,结果想截图时候发现上年的
让队友 德尼 拿走了。。。。nnd
===================================================================
============
时间就是金钱,简要说清楚就好,不浪费大家看帖时间。
简要心得1:
极致总是好的,射门精度99 射门力量99 多爽啊~但是如果一直这么培养,不是好事。
因为球员数据到了99就停了,他每天还要拿成长的,而且是所有属性都有成长,或快
或慢而已。
那你到了99就亏了,拿不到成长了。(99后最多再拿0.99点,数据卡在顶头,到不了
100)
我的培养思路是均衡来,前锋为例:
from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order
射门精度、射门力量到了90多后观察速度属性,还都70多呢,那就别挂射门道具了,改挂“秒
”上速度。
要是射门这两个数据都上了95,你速度、身体、盘带三项综合还在85以下,那你的培养就算失败的了。
要尽快补救,如果再继续这么发展,再过几年,这前锋就只能挂着两个99不动,一点点的补其他数据了。
弗兰 从青年队入手的时候射门已经90+了,我想都没想 直接挂了 “自由重量器械” 练力量,补短板。
再在“训练”里面,微调一格 或 两格 给力量,辅助他的力量练习。
总之就是让球员均衡的成长起来~前期没经验,诺黑拼命的练防守和身体,结果都早早99了。
到后期居然不如均衡培养的克亚尔,人家5个A,诺黑 4个A 一个B ,好久之后才达到 5A。。。。
当然了,效果相差不太明显,但是作为数据控,还是越高越好,
中后卫冲到前场断了球,传球数据高,就地一个漂亮的直塞,多舒服。
总比数据不给力,一传就传到对方脚下要强。
全员谁得到好机会了,都不用顾虑,起脚就射,多舒服。
总比数据不给力,还要犹豫下要不要分给射门好的人去打 要强。
不管控制谁,都敢拿球 用身体硬抗对方,多舒服
总比数据不给力,球一到某人脚下就想着出球 要强。你说是不,
简要心得2:
买球员的时候不要盲目~当然,临时过渡,买个老将踢一两年的 这种不算。
买人时候看说明,最好的就是“虽大器晚成,但会持久弥香”,这种球员30多以后依然能稳健成长。好不容易培养起来的球员,自然是用的越久越好~
早起巅峰型的尽量不要买,就是“似乎年龄不大,就达到了较高水平”那种。
你去看看西班牙的法里诺斯,20多岁数据就开始跳水,即便在你队里,状态维持的好 也多挺不过26岁。
以上两种都是容易区分的,其他的就有点小麻烦,因为一般都写着“似乎在以稳定的速度成长”啥的。
我的办法是:看到了心仪的球员,记住他的国籍和名字。
存档、退出,去编辑模式,把他“选拔”进国家队。
再反过头来“编辑球员”,在其国家队里找到他,在编辑模式中,我们就可以看到他的成长类型了。
之前我筛选出一个25岁的边后卫,说明写的“在以稳定的速度成长”
用这个办法一看,居然是早期巅峰型,买了就坑爹了。
你们也知道,PES2013卖人不太好卖。。。
ps:另外也可以用这个办法测试球员其他位置适性。不一定第一注册位置就是他数据最高的位置。犹豫要不要买一个人的时候,可以用此法。看看他在其他注册位置上的表现。 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order
简要心得3:
早期巅峰型:维持的好 26岁 到顶,打的不好、或是在电脑其他队伍里20岁就掉。
早期巅峰型代表球员:涅兰德纳。普通型:维持的再好 31岁 必然到顶,表现稍差的30岁到顶。
偶尔没天理的,变现特好 29岁 也到顶。。。。。。nnd
所有球员到顶后,数据依然可以进步,但是要表现得好,场上拿高分。
不管怎样,增长速度也明显放缓,
表现得不好,或是坐一阵板凳,那么数据必然下降。
具体到啥时候数据不再增长,必然下降,还不可知,因为我最大的球员也就32岁,之前的老将幸运的卖掉了。
from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order