机械完工 1.0 1.1 STAGES OF COMPLETION Mechanical Completion Mechanical Completion shall have been achieved when all construction activities, installation work, static (non-functional) testing have been completed and documented in accordance with the Contract Docum...
机械完工
1.0 1.1 STAGES OF COMPLETION Mechanical Completion Mechanical Completion shall have been achieved when all construction activities, installation work, static (non-functional) testing have been completed and documented in accordance with the Contract Documents. At this point, the turnover system or the Facility, as applicable, will be ready to start Precommissioning activities. Mechanical Completion shall include completion of the following activities: 1.1.1 Civil Work  All excavation, backfill and compaction work is complete.  All underground sewers and pressure pipe have been installed and tested.  All finish grading and paving is complete, and the Site has been checked for proper drainage. 1.1.2 Concrete Work  All concrete foundations and structures are complete.  All grouting of Equipment and supports is complete.  All fireproofing (structural steel, Equipment supports and skirts, cable tray and other required items) is complete. 1.1.3 Structural Steel Work  All structural steel, ladders, platforms, stairways and walkways are erected.  All bolted connections are tightened.  All welded connections and required non-destructive examinations are complete. 1.1.4 Building Work  All buildings are constructed.  All building architectural finishes and schedules are complete.  All building mechanical, electrical, control systems and protection systems installations have been checked and statically tested. 1.1.5 Mechanical Work  All mechanical Equipment requiring hydrostatic testing has been tested at the manufacturer’s shop or at the Site, as required.  All Factory Acceptance Testing (FAT) of machinery and Equipment, as required, is complete.  All vessel internals (with the exception of chemicals and catalysts) have been installed, checked and tested where required, and vessel interiors have been cleaned and checked for removal of all debris. With the exception of vessels requiring installation of chemicals and catalysts, final closure of vessels is complete.  All final cold alignment checks between rotating machinery and their drivers are complete and documented.  All tanks have been constructed, hydrostatically tested, drained, cleaned and final closure is complete.  All fired heaters and boilers have been erected, including installation of all internal refractory and insulation. 1.1.6 Piping Work  All piping systems have been installed and checked.  All fire control and fire protection hardware has been installed.  All piping connections to rotating machinery have been checked for proper alignment and clearance.  All non-destructive examinations and static pressure testing is complete. 1.1.7 Electrical Work  All electrical Equipment, junction boxes, panels and fixtures have been installed and all static checks and tests are complete.  All grounding, cable and wire installations are complete and have been checked.  All required insulation resistance tests are complete.  All dielectric testing of medium voltage (6kV) and high voltage (35kV)cable is complete.  All cable and wire terminations have been checked.  All panel schedules are complete, current and properly labeled. 1.1.8 Control Systems Work  All instrument bench calibrations are complete.  All Factory Acceptance Testing (FAT) and installation of the DCS is complete.  All control panels, marshalling cabinets, junction boxes and instruments have been installed and all static checks and tests are complete.  All cable and wire installations are complete and have been checked.  All cable and wire terminations have been checked.  All process leads and tubing have been installed and pressure tested.  All panel schedules are complete, current and properly labeled.  All fire protection, and fire and gas detection controls and instruments have been installed and checked. 1.1.9 Paint and Insulation Work  All painting and insulation is complete to the greatest extent possible. 1.1.10 Documentation  All system turnover packages have been assembled, their contents checked for completeness and accuracy, and the packages have been reviewed and confirmed by the Project Company to be complete.  All Specifications and Drawings requiring as-built updates have been updated. One copy of manual updates (red lines) has been transmitted to the Project Company. 1.1.11 Operator Training  Contractor’s formal classroom training program for Project Company’s operating personnel for the Facility is complete. 1.1.12 Spare Parts  All Spare Parts and special tools required for commissioning and startup have been turned over to the Project Company.  All Spare Parts have been delivered to the Site. 1.1.13 Site Cleanup  The Site is cleaned and all construction surplus material and rubbish is removed from the Site.  All scaffolding is removed as far as reasonable, except for that scaffolding required to support Precommissioning and Punch List activities.
/
本文档为【机械完工】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索