word_2013年日历一月一张A4纸含农历节日
2013 年 1 月
星期一 星期二 星期三 星期四 星期五 星期六 星期日
1 2 3 4 5 6
元旦廿一 廿二 廿三 小寒 廿五
二7 8 9 10 11 12 13
十
廿六 廿七 廿八 廿九 三十 腊月初二
初14 15 16 17 18 19 20
一 初三 初四 初五 初六 初七 初八 大寒 21 22 23 24 25 26 27
初十 十一 十二 十三 十四 十五 十六 28 29 30 31
十七 十八 十九 廿十
when provisions of grounding should be directly associated with the grounding connection of the equipment grounding. 5.1.10.2.2 received a protective earthing grounding protection of low-voltage electrical equipment in electrical engineering online, the connection should be solid and reliable, should not the series grounded. 5.1.10.2.3 protection of grounding resistance of ground and signal ground should be less than 4 ω, and the space between two grounding electrode must be greater than 5M. 5.1.10.2.4 instrument panel (box, frame) within the protective earthing, of the signal circuit grounding, grounding and shielding intrinsically safe instrument system grounding, should receive separate grounding bus bar; the ground straps, the grounding of General main line, between the main line should be insulated to each other. 5.1.11 instrument debugging engineering 5.1.11.1 debugging environment and the personnel qualification 6.4.1.11.1.1 set instrument debugging between and the instrument equipment warehouse, its workshop area, and indoor environment requirements and the by configuration of standard instrument equipment must meet engineering debugging of requirements, standard instrument instrument should has effective of identification qualified certificate, its basic errors absolute, not should over was school instrument basic errors absolute of 1/3, debugging personnel should holding card induction. 5.1.11.1.2 provides high quality circuit testing of instrument builders. Circuit testing exposed problems in the process must be processed in a timely manner; for questions related to system configuration to assist processing configuration engineer. After passing the 5.1.11.1.3 meter unit debugging in the meter
2013 年 2 月
星期一 星期二 星期三 星期四 星期五 星期六 星期日
1 2 3
廿一 廿二 立春 4 5 6 7 8 9 10
廿四 廿五 廿六 廿七 廿八 除夕 正月
初11 12 13 14 15 16 17
一 初二 初三 初四 初五 初六 初七 初八 18 19 20 21 22 23 24
雨水 初十 十一 十二 十三 十四 元宵
节 25 26 27 28
十六 十七 十八 十九
when provisions of grounding should be directly associated with the grounding connection of the equipment grounding. 5.1.10.2.2 received a protective earthing grounding protection of low-voltage electrical equipment in electrical engineering online, the connection should be solid and reliable, should not the series grounded. 5.1.10.2.3 protection of grounding resistance of ground and signal ground should be less than 4 ω, and the space between two grounding electrode must be greater than 5M. 5.1.10.2.4 instrument panel (box, frame) within the protective earthing, of the signal circuit grounding, grounding and shielding intrinsically safe instrument system grounding, should receive separate grounding bus bar; the ground straps, the grounding of General main line, between the main line should be insulated to each other. 5.1.11 instrument debugging engineering 5.1.11.1 debugging environment and the personnel qualification 6.4.1.11.1.1 set instrument debugging between and the instrument equipment warehouse, its workshop area, and indoor environment requirements and the by configuration of standard instrument equipment must meet engineering debugging of requirements, standard instrument instrument should has effective of identification qualified certificate, its basic errors absolute, not should over was school instrument basic errors absolute of 1/3, debugging personnel should holding card induction. 5.1.11.1.2 provides high quality circuit testing of instrument builders. Circuit testing exposed problems in the process must be processed in a timely manner; for questions related to system configuration to assist processing configuration engineer. After passing the 5.1.11.1.3 meter unit debugging in the meter
2013 年 3 月
星期一 星期二 星期三 星期四 星期五 星期六 星期日
1 2 3
二十 廿一 廿二 4 5 6 7 8 9 10
廿三 惊蛰 廿五 廿六 妇女廿八 廿九
节 11 12 13 14 15 16 17
三十 二月初二 初三 初四 初五 初六
初18 19 20 21 22 23 24
一 初七 初八 春分 初十 十一 十二 十三 25 26 27 28 29 30 31
十四 十五 十六 十七 十八 十九 二十
when provisions of grounding should be directly associated with the grounding connection of the equipment grounding. 5.1.10.2.2 received a protective earthing grounding protection of low-voltage electrical equipment in electrical engineering online, the connection should be solid and reliable, should not the series grounded. 5.1.10.2.3 protection of grounding resistance of ground and signal ground should be less than 4 ω, and the space between two grounding electrode must be greater than 5M. 5.1.10.2.4 instrument panel (box, frame) within the protective earthing, of the signal circuit grounding, grounding and shielding intrinsically safe instrument system grounding, should receive separate grounding bus bar; the ground straps, the grounding of General main line, between the main line should be insulated to each other. 5.1.11 instrument debugging engineering 5.1.11.1 debugging environment and the personnel qualification 6.4.1.11.1.1 set instrument debugging between and the instrument equipment warehouse, its workshop area, and indoor environment requirements and the by configuration of standard instrument equipment must meet engineering debugging of requirements, standard instrument instrument should has effective of identification qualified certificate, its basic errors absolute, not should over was school instrument basic errors absolute of 1/3, debugging personnel should holding card induction. 5.1.11.1.2 provides high quality circuit testing of instrument builders. Circuit testing exposed problems in the process must be processed in a timely manner; for questions related to system configuration to assist processing configuration engineer. After passing the 5.1.11.1.3 meter unit debugging in the meter
2013 年 4 月
星期一 星期二 星期三 星期四 星期五 星期六 星期日 1 2 3 4 5 6 7
二月廿二 廿三 清明廿五 廿六 廿七
廿节 8 9 10 11 12 13 14
一
廿八 廿九 三月初二 初三 初四 初五
初一 15 16 17 18 19 20 21
初六 初七 初八 初九 初十 谷雨 十 二
22 23 24 25 26 27 28
十三 十四 十五 十六 十七
29 30
二十 廿一
when provisions of grounding should be directly associated with the grounding connection of the equipment grounding. 5.1.10.2.2 received a protective earthing grounding protection of low-voltage electrical equipment in electrical engineering online, the connection should be solid and reliable, should not the series grounded. 5.1.10.2.3 protection of grounding resistance of ground and signal ground should be less than 4 ω, and the space between two grounding electrode must be greater than 5M. 5.1.10.2.4 instrument panel (box, frame) within the protective earthing, of the signal circuit grounding, grounding and shielding intrinsically safe instrument system grounding, should receive separate grounding bus bar; the ground straps, the grounding of General main line, between the main line should be insulated to each other. 5.1.11 instrument debugging engineering 5.1.11.1 debugging environment and the personnel qualification 6.4.1.11.1.1 set instrument debugging between and the instrument equipment warehouse, its workshop area, and indoor environment requirements and the by configuration of standard instrument equipment must meet engineering debugging of requirements, standard instrument instrument should has effective of identification qualified certificate, its basic errors absolute, not should over was school instrument basic errors absolute of 1/3, debugging personnel should holding card induction. 5.1.11.1.2 provides high quality circuit testing of instrument builders. Circuit testing exposed problems in the process must be processed in a timely manner; for questions related to system configuration to assist processing configuration engineer. After passing the 5.1.11.1.3 meter unit debugging in the meter
2013年 5 月
星期一 星期二 星期三 星期四 星期五 星期六 星期日
1 2 3 4 5
劳动三月廿四 廿五 廿六
节 廿三 立夏 6 7 8 9 10 11 12
廿七 廿八 廿九 三十 四月初二 初三
初一 13 14 15 16 17 18 19
初四 初五 初六 初七 初八 初九 初十 20 21 22 23 24 25 26
十二十一 十三 十四 十五 十六 十七
小满
27 28 29 30 31
十八 十九 二十 廿一 廿二
when provisions of grounding should be directly associated with the grounding connection of the equipment grounding. 5.1.10.2.2 received a protective earthing grounding protection of low-voltage electrical equipment in electrical engineering online, the connection should be solid and reliable, should not the series grounded. 5.1.10.2.3 protection of grounding resistance of ground and signal ground should be less than 4 ω, and the space between two grounding electrode must be greater than 5M. 5.1.10.2.4 instrument panel (box, frame) within the protective earthing, of the signal circuit grounding, grounding and shielding intrinsically safe instrument system grounding, should receive separate grounding bus bar; the ground straps, the grounding of General main line, between the main line should be insulated to each other. 5.1.11 instrument debugging engineering 5.1.11.1 debugging environment and the personnel qualification 6.4.1.11.1.1 set instrument debugging between and the instrument equipment warehouse, its workshop area, and indoor environment requirements and the by configuration of standard instrument equipment must meet engineering debugging of requirements, standard instrument instrument should has effective of identification qualified certificate, its basic errors absolute, not should over was school instrument basic errors absolute of 1/3, debugging personnel should holding card induction. 5.1.11.1.2 provides high quality circuit testing of instrument builders. Circuit testing exposed problems in the process must be processed in a timely manner; for questions related to system configuration to assist processing configuration engineer. After passing the 5.1.11.1.3 meter unit debugging in the meter
2013 年 6 月
星期一 星期二 星期三 星期四 星期五 星期六 星期日
1 2
儿童四月
节 廿四 3 4 5 6 7 8 9
廿五 廿六 廿七廿八 廿九 三十 五月
芒种 初一 10 11 12 13 14 15 16
初二 初三 初四 端午初六 初七 初八
节 17 18 19 20 21 22 23
初九 初十 十一 十二 十三十四 十五
夏至 24 25 26 27 28 29 30
十六 十七 十八 十九 二十 廿一 廿二
when provisions of grounding should be directly associated with the grounding connection of the equipment grounding. 5.1.10.2.2 received a protective earthing grounding protection of low-voltage electrical equipment in electrical engineering online, the connection should be solid and reliable, should not the series grounded. 5.1.10.2.3 protection of grounding resistance of ground and signal ground should be less than 4 ω, and the space between two grounding electrode must be greater than 5M. 5.1.10.2.4 instrument panel (box, frame) within the protective earthing, of the signal circuit grounding, grounding and shielding intrinsically safe instrument system grounding, should receive separate grounding bus bar; the ground straps, the grounding of General main line, between the main line should be insulated to each other. 5.1.11 instrument debugging engineering 5.1.11.1 debugging environment and the personnel qualification 6.4.1.11.1.1 set instrument debugging between and the instrument equipment warehouse, its workshop area, and indoor environment requirements and the by configuration of standard instrument equipment must meet engineering debugging of requirements, standard instrument instrument should has effective of identification qualified certificate, its basic errors absolute, not should over was school instrument basic errors absolute of 1/3, debugging personnel should holding card induction. 5.1.11.1.2 provides high quality circuit testing of instrument builders. Circuit testing exposed problems in the process must be processed in a timely manner; for questions related to system configuration to assist processing configuration engineer. After passing the 5.1.11.1.3 meter unit debugging in the meter
2013 年 7月
星期一 星期二 星期三 星期四 星期五 星期六 星期日 1 2 3 4 5 6 7
建党五月廿廿五 廿六 廿七 廿八 廿九
节 四 小暑 8 9 10 11 12 13 14
六月初二 初三 初四 初五 初六 初七 初一 15 16 17 18 19 20 21
初八 初九 初十 十一 十二 十三 十四 22 23 24 25 26 27 28
十五 十六大十七 十八 十九 二十 廿一
暑 29 30 31
廿二 廿三 廿四
when provisions of grounding should be directly associated with the grounding connection of the equipment grounding. 5.1.10.2.2 received a protective earthing grounding protection of low-voltage electrical equipment in electrical engineering online, the connection should be solid and reliable, should not the series grounded. 5.1.10.2.3 protection of grounding resistance of ground and signal ground should be less than 4 ω, and the space between two grounding electrode must be greater than 5M. 5.1.10.2.4 instrument panel (box, frame) within the protective earthing, of the signal circuit grounding, grounding and shielding intrinsically safe instrument system grounding, should receive separate grounding bus bar; the ground straps, the grounding of General main line, between the main line should be insulated to each other. 5.1.11 instrument debugging engineering 5.1.11.1 debugging environment and the personnel qualification 6.4.1.11.1.1 set instrument debugging between and the instrument equipment warehouse, its workshop area, and indoor environment requirements and the by configuration of standard instrument equipment must meet engineering debugging of requirements, standard instrument instrument should has effective of identification qualified certificate, its basic errors absolute, not should over was school instrument basic errors absolute of 1/3, debugging personnel should holding card induction. 5.1.11.1.2 provides high quality circuit testing of instrument builders. Circuit testing exposed problems in the process must be processed in a timely manner; for questions related to system configuration to assist processing configuration engineer. After passing the 5.1.11.1.3 meter unit debugging in the meter
2013 年 8 月
星期一 星期二 星期三 星期四 星期五 星期六 星期日
1 2 3 4
建军六月廿七 廿八
节 廿六 5 6 7 8 9 10 11
七月廿九 三十 初二 初三 初四 初五
初一
12 13 14 15 16 17 18
立秋 初六 初七 初八 初九 初十 十一 十二 19 20 21 22 23 24 25
十七十三 十四 十五 十六 十八 十九
处暑
26 27 28 29 30 31
二十 廿一 廿二 廿三 廿四 廿五
when provisions of grounding should be directly associated with the grounding connection of the equipment grounding. 5.1.10.2.2 received a protective earthing grounding protection of low-voltage electrical equipment in electrical engineering online, the connection should be solid and reliable, should not the series grounded. 5.1.10.2.3 protection of grounding resistance of ground and signal ground should be less than 4 ω, and the space between two grounding electrode must be greater than 5M. 5.1.10.2.4 instrument panel (box, frame) within the protective earthing, of the signal circuit grounding, grounding and shielding intrinsically safe instrument system grounding, should receive separate grounding bus bar; the ground straps, the grounding of General main line, between the main line should be insulated to each other. 5.1.11 instrument debugging engineering 5.1.11.1 debugging environment and the personnel qualification 6.4.1.11.1.1 set instrument debugging between and the instrument equipment warehouse, its workshop area, and indoor environment requirements and the by configuration of standard instrument equipment must meet engineering debugging of requirements, standard instrument instrument should has effective of identification qualified certificate, its basic errors absolute, not should over was school instrument basic errors absolute of 1/3, debugging personnel should holding card induction. 5.1.11.1.2 provides high quality circuit testing of instrument builders. Circuit testing exposed problems in the process must be processed in a timely manner; for questions related to system configuration to assist processing configuration engineer. After passing the 5.1.11.1.3 meter unit debugging in the meter
2013 年 9 月
星期一 星期二 星期三 星期四 星期五 星期六 星期日
1
七月
廿2 3 4 5 6 7 8
六 廿七 廿八 廿九 八月初二 初三初四
初一 白露 9 10 11 12 13 14 15
教师初五 初七 初八 初九 初十 十一
节
16 17 18 19 20 21 22
中秋十二 十三 十四 十六 十七 十八
节
23 24 25 26 27 28 29
十九二十 廿一 廿二 廿三 廿四 廿五 秋分 30
廿六
when provisions of grounding should be directly associated with the grounding connection of the equipment grounding. 5.1.10.2.2 received a protective earthing grounding protection of low-voltage electrical equipment in electrical engineering online, the connection should be solid and reliable, should not the series grounded. 5.1.10.2.3 protection of grounding resistance of ground and signal ground should be less than 4 ω, and the space between two grounding electrode must be greater than 5M. 5.1.10.2.4 instrument panel (box, frame) within the protective earthing, of the signal circuit grounding, grounding and shielding intrinsically safe instrument system grounding, should receive separate grounding bus bar; the ground straps, the grounding of General main line, between the main line should be insulated to each other. 5.1.11 instrument debugging engineering 5.1.11.1 debugging environment and the personnel qualification 6.4.1.11.1.1 set instrument debugging between and the instrument equipment warehouse, its workshop area, and indoor environment requirements and the by configuration of standard instrument equipment must meet engineering debugging of requirements, standard instrument instrument should has effective of identification qualified certificate, its basic errors absolute, not should over was school instrument basic errors absolute of 1/3, debugging personnel should holding card induction. 5.1.11.1.2 provides high quality circuit testing of instrument builders. Circuit testing exposed problems in the process must be processed in a timely manner; for questions related to system configuration to assist processing configuration engineer. After passing the 5.1.11.1.3 meter unit debugging in the meter
2013 年 10 月
星期一 星期二 星期三 星期四 星期五 星期六 星期日
1 2 3 4 5 6
九月国庆节 廿八 廿九 三十 初二
初一 7 8 9 10 11 12 13
初四寒重阳初三 初五 初六 初七 初八
露 节 14 15 16 17 18 19 20
初十 十一 十二 十三 十四 十五 十六 21 22 23 24 25 26 27
十九十七 十八 二十 廿一 廿二 廿三
霜降
28 29 30 31
廿四 廿五 廿六 廿七
when provisions of grounding should be directly associated with the grounding connection of the equipment grounding. 5.1.10.2.2 received a protective earthing grounding protection of low-voltage electrical equipment in electrical engineering online, the connection should be solid and reliable, should not the series grounded. 5.1.10.2.3 protection of grounding resistance of ground and signal ground should be less than 4 ω, and the space between two grounding electrode must be greater than 5M. 5.1.10.2.4 instrument panel (box, frame) within the protective earthing, of the signal circuit grounding, grounding and shielding intrinsically safe instrument system grounding, should receive separate grounding bus bar; the ground straps, the grounding of General main line, between the main line should be insulated to each other. 5.1.11 instrument debugging engineering 5.1.11.1 debugging environment and the personnel qualification 6.4.1.11.1.1 set instrument debugging between and the instrument equipment warehouse, its workshop area, and indoor environment requirements and the by configuration of standard instrument equipment must meet engineering debugging of requirements, standard instrument instrument should has effective of identification qualified certificate, its basic errors absolute, not should over was school instrument basic errors absolute of 1/3, debugging personnel should holding card induction. 5.1.11.1.2 provides high quality circuit testing of instrument builders. Circuit testing exposed problems in the process must be processed in a timely manner; for questions related to system configuration to assist processing configuration engineer. After passing the 5.1.11.1.3 meter unit debugging in the meter
2013 年 11 月
星期一 星期二 星期三 星期四 星期五 星期六 星期日
1 2 3
九月廿九 十月
廿八 初一 4 5 6 7 8 9 10
初二 初三 初四 初五初六 初七 初八
立冬 11 12 13 14 15 16 17
初九 初十 十一 十二 十三 十四 十五 18 19 20 21 22 23 24
十六 十七 十八 十九 二十廿一 廿二
小雪 25 26 27 28 29 30
廿三 廿四 廿五 廿六 廿七 廿八
when provisions of grounding should be directly associated with the grounding connection of the equipment grounding. 5.1.10.2.2 received a protective earthing grounding protection of low-voltage electrical equipment in electrical engineering online, the connection should be solid and reliable, should not the series grounded. 5.1.10.2.3 protection of grounding resistance of ground and signal ground should be less than 4 ω, and the space between two grounding electrode must be greater than 5M. 5.1.10.2.4 instrument panel (box, frame) within the protective earthing, of the signal circuit grounding, grounding and shielding intrinsically safe instrument system grounding, should receive separate grounding bus bar; the ground straps, the grounding of General main line, between the main line should be insulated to each other. 5.1.11 instrument debugging engineering 5.1.11.1 debugging environment and the personnel qualification 6.4.1.11.1.1 set instrument debugging between and the instrument equipment warehouse, its workshop area, and indoor environment requirements and the by configuration of standard instrument equipment must meet engineering debugging of requirements, standard instrument instrument should has effective of identification qualified certificate, its basic errors absolute, not should over was school instrument basic errors absolute of 1/3, debugging personnel should holding card induction. 5.1.11.1.2 provides high quality circuit testing of instrument builders. Circuit testing exposed problems in the process must be processed in a timely manner; for questions related to system configuration to assist processing configuration engineer. After passing the 5.1.11.1.3 meter unit debugging in the meter
2013 年 12 月
星期一 星期二 星期三 星期四 星期五 星期六 星期日
1
十月
廿2 3 4 5 6 7 8
九 三十 冬月初二 初三 初四 初五初六
初一 大雪 9 10 11 12 13 14 15
初七 初八 初九 初十 十一 十二 十三 16 17 18 19 20 21 22
十九十四 十五 十六 十七 十八 二十
冬至 23 24 25 26 27 28 29
廿一 廿二 圣诞廿四 廿五 廿六 廿七
节 30 31
廿八 廿九
when provisions of grounding should be directly associated with the grounding connection of the equipment grounding. 5.1.10.2.2 received a protective earthing grounding protection of low-voltage electrical equipment in electrical engineering online, the connection should be solid and reliable, should not the series grounded. 5.1.10.2.3 protection of grounding resistance of ground and signal ground should be less than 4 ω, and the space between two grounding electrode must be greater than 5M. 5.1.10.2.4 instrument panel (box, frame) within the protective earthing, of the signal circuit grounding, grounding and shielding intrinsically safe instrument system grounding, should receive separate grounding bus bar; the ground straps, the grounding of General main line, between the main line should be insulated to each other. 5.1.11 instrument debugging engineering 5.1.11.1 debugging environment and the personnel qualification 6.4.1.11.1.1 set instrument debugging between and the instrument equipment warehouse, its workshop area, and indoor environment requirements and the by configuration of standard instrument equipment must meet engineering debugging of requirements, standard instrument instrument should has effective of identification qualified certificate, its basic errors absolute, not should over was school instrument basic errors absolute of 1/3, debugging personnel should holding card induction. 5.1.11.1.2 provides high quality circuit testing of instrument builders. Circuit testing exposed problems in the process must be processed in a timely manner; for questions related to system configuration to assist processing configuration engineer. After passing the 5.1.11.1.3 meter unit debugging in the meter
when provisions of grounding should be directly associated with the grounding connection of the equipment grounding. 5.1.10.2.2 received a protective earthing grounding protection of low-voltage electrical equipment in electrical engineering online, the connection should be solid and reliable, should not the series grounded. 5.1.10.2.3 protection of grounding resistance of ground and signal ground should be less than 4 ω, and the space between two grounding electrode must be greater than 5M. 5.1.10.2.4 instrument panel (box, frame) within the protective earthing, of the signal circuit grounding, grounding and shielding intrinsically safe instrument system grounding, should receive separate grounding bus bar; the ground straps, the grounding of General main line, between the main line should be insulated to each other. 5.1.11 instrument debugging engineering 5.1.11.1 debugging environment and the personnel qualification 6.4.1.11.1.1 set instrument debugging between and the instrument equipment warehouse, its workshop area, and indoor environment requirements and the by configuration of standard instrument equipment must meet engineering debugging of requirements, standard instrument instrument should has effective of identification qualified certificate, its basic errors absolute, not should over was school instrument basic errors absolute of 1/3, debugging personnel should holding card induction. 5.1.11.1.2 provides high quality circuit testing of instrument builders. Circuit testing exposed problems in the process must be processed in a timely manner; for questions related to system configuration to assist processing configuration engineer. After passing the 5.1.11.1.3 meter unit debugging in the meter