为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

个人企业网站域名ICP备案流程

2018-01-12 44页 doc 546KB 8阅读

用户头像

is_435706

暂无简介

举报
个人企业网站域名ICP备案流程个人企业网站域名ICP备案流程 ICP自主备案操作说明 自主备案分成两部分:注册过程、备案过程。 一、公司备案 1、《备案信息真实性核验单》一式两份 2、《网络安全承诺书》一式两份 3、公司营业执照复印件、网站负责人身份证复印件一式两份 4、《域名注册证书》一式两份 二、个人备案 1、《备案信息真实性核验单》个人版一式两份 2、《网络安全承诺书》一式两份 3、个人身份证复印件一式两份 4、《域名注册证书》一式两份 accident occurred, the direct punishment 0.5-...
个人企业网站域名ICP备案流程
个人企业网站域名ICP备案流程 ICP自主备案操作说明 自主备案分成两部分:注册过程、备案过程。 一、公司备案 1、《备案信息真实性核验单》一式两份 2、《网络安全承诺书》一式两份 3、公司营业执照复印件、网站负责人身份证复印件一式两份 4、《域名注册证书》一式两份 二、个人备案 1、《备案信息真实性核验单》个人版一式两份 2、《网络安全承诺书》一式两份 3、个人身份证复印件一式两份 4、《域名注册证书》一式两份 accident occurred, the direct punishment 0.5-10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) personal injury accident occurs, the direct punishment 500-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance 三、备注说明: 1.域名证书必须和申请备案主体信息一致 2.凡深圳地区备案必须到接入商现场拍照办理,如跨地域或特殊情况不能到现场拍照者,须按照接入商提供的备案背景图进行PS处理,PS图片并注明备案的主体和域名 3.所有备案信息均按照新备案流程审核,资料有误、资料不全一律不给予审核,但备案客服必须第一时间客户将资料补齐再进行审核 4.对添加备案域名或变更的,须提供域名证书和核验单进行核验才给予添加。 公司备案所有的纸质资料均需盖公章。 5. 6、核验单必须填报完整,核验单不可打印成分页,分页无效,签写日期不可涂改。 7、个人备案个人承诺,必须是申请人手抄(填写说明第二页有) 由于备案流程较为繁琐,有不明白的联系备案专员QQ7851127 11 手机;15083837 507祝您 备案成功~ 一:注册过程 , 首先打开IE浏览器(建议使用IE6)登录本网站(www.miibeian.gov.cn)。 2002 industrial pipe weld-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-ations, serial number a 1 GB3323icn team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specif1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-500strative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-of criticism and 501000, who is directly responsible for the accident responsibility, give notice -l injury accident occurs, the direct punishment 500hip, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) persona10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leaders-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-ion engineering 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installat-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-alification for steel pressure vessels 7 JB/47092000 of welding procedure qu-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-ing engineering code for construction and acceptance of field equipment 4 HGJ2222 , 点击“新网站主办者用户请[注册]”中的“注册”字样,进入下图。 92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-for grade 3 GB5023689 steel welds manual methods of ultrasonic inspection and testing results -Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-rm in the construction standards and specifications, serial number a 1 GB3323n team injuries accident penalty provisions, mutatis mutandis. Eight, should perfo1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-ences, the pursuit of leadership, along with 500strative leadership of the criticism, resulting in serious consequ100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-for the accident responsibility, give notice of criticism and 501000, who is directly responsible -sonnel Department of the company. (3) personal injury accident occurs, the direct punishment 500he accident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the per10,000 yuan, responsible for the direct responsibility for t-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-lded plate II, mechanical equipment installation engineering 1 GB1502000 steel pressure vessel products mechanical properties test of we-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-emical JB/ T47082004 petroch-3 , 点击“接受”,进入下图。 ing engineering code for construction and acceptance of field equipment 4 HGJ2222002 industrial pipe weld-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-ations, serial number a 1 GB3323icn team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specif1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-500strative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-of criticism and 501000, who is directly responsible for the accident responsibility, give notice -l injury accident occurs, the direct punishment 500hip, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) persona10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leaders-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-ion engineering 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installat-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-alification for steel pressure vessels 7 JB/47092000 of welding procedure qu-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-4 , 再点击“接受”,进入下图。 2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-for grade 3 GB5023689 steel welds manual methods of ultrasonic inspection and testing results -Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-rm in the construction standards and specifications, serial number a 1 GB3323n team injuries accident penalty provisions, mutatis mutandis. Eight, should perfo1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-ences, the pursuit of leadership, along with 500strative leadership of the criticism, resulting in serious consequ100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-for the accident responsibility, give notice of criticism and 501000, who is directly responsible -sonnel Department of the company. (3) personal injury accident occurs, the direct punishment 500he accident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the per10,000 yuan, responsible for the direct responsibility for t-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-lded plate II, mechanical equipment installation engineering 1 GB1502000 steel pressure vessel products mechanical properties test of we-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-emical JB/ T47082004 petroch-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-5 , 请仔细阅读屏幕中的提示信息,并按照屏幕中的提示依次填写信息。填写完毕后,点击 “注册”进入下图。 ing engineering code for construction and acceptance of field equipment 4 HGJ2222002 industrial pipe weld-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-ations, serial number a 1 GB3323icn team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specif1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-500strative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-of criticism and 501000, who is directly responsible for the accident responsibility, give notice -l injury accident occurs, the direct punishment 500hip, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) persona10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leaders-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-ion engineering 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installat-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-alification for steel pressure vessels 7 JB/47092000 of welding procedure qu-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-6 , 按“确定”完成注册。(注:由于手机短信发送平台的原因,目前阶段如上图所示,系 统会将手机和邮件验证码显示在屏幕中,供注册用户直接使用。等短信平台稳定以后, 系统将在上图中取消验证码的页面直接显示功能。) -92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-for grade 3 GB5023689 steel welds manual methods of ultrasonic inspection and testing results -Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-rm in the construction standards and specifications, serial number a 1 GB3323n team injuries accident penalty provisions, mutatis mutandis. Eight, should perfo1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-ences, the pursuit of leadership, along with 500strative leadership of the criticism, resulting in serious consequ100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-for the accident responsibility, give notice of criticism and 501000, who is directly responsible -sonnel Department of the company. (3) personal injury accident occurs, the direct punishment 500he accident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the per10,000 yuan, responsible for the direct responsibility for t-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-lded plate II, mechanical equipment installation engineering 1 GB1502000 steel pressure vessel products mechanical properties test of we-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-emical JB/ T47082004 petroch7 二:备案过程 , 登录网站首页面,如下图所示,在“报备类别”中选择“ICP报备(网站主办者)”类 别,然后在“用户名”和“密码”处输入您刚刚注册的用户名和密码,在验证码处根据 屏幕提示输入正确的验证码。 , 点击“登录”,进入下图。 n team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specif1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-500strative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-of criticism and 501000, who is directly responsible for the accident responsibility, give notice -l injury accident occurs, the direct punishment 500hip, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) persona10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leaders-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-ion engineering 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installat-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-alification for steel pressure vessels 7 JB/47092000 of welding procedure qu-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-ing engineering code for construction and acceptance of field equipment 4 HGJ2222002 industrial pipe weld-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-ations, serial number a 1 GB3323ic8 , 如图所示,将您手机或邮件收到的验证码输入到相应位置(注:手机和邮件验证码是相 同的)。点击“登录”进入下图。 , 在上图中点击屏幕左侧树型菜单上的“备案信息录入”,进入下图。 -92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-for grade 3 GB5023689 steel welds manual methods of ultrasonic inspection and testing results -Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-rm in the construction standards and specifications, serial number a 1 GB3323n team injuries accident penalty provisions, mutatis mutandis. Eight, should perfo1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-ences, the pursuit of leadership, along with 500strative leadership of the criticism, resulting in serious consequ100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-for the accident responsibility, give notice of criticism and 501000, who is directly responsible -sonnel Department of the company. (3) personal injury accident occurs, the direct punishment 500he accident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the per10,000 yuan, responsible for the direct responsibility for t-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-lded plate II, mechanical equipment installation engineering 1 GB1502000 steel pressure vessel products mechanical properties test of we-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-emical JB/ T47082004 petroch9 , 点击“信息录入”这个菜单项,进入下图。 ing engineering code for construction and acceptance of field equipment 4 HGJ2222002 industrial pipe weld-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-ations, serial number a 1 GB3323icn team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specif1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-500strative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-of criticism and 501000, who is directly responsible for the accident responsibility, give notice -l injury accident occurs, the direct punishment 500hip, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) persona10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leaders-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-ion engineering 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installat-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-alification for steel pressure vessels 7 JB/47092000 of welding procedure qu-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-10 , 如图所示,填写ICP备案主体信息, -2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-for grade 3 GB5023689 steel welds manual methods of ultrasonic inspection and testing results -Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-rm in the construction standards and specifications, serial number a 1 GB3323n team injuries accident penalty provisions, mutatis mutandis. Eight, should perfo1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-ences, the pursuit of leadership, along with 500strative leadership of the criticism, resulting in serious consequ100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-for the accident responsibility, give notice of criticism and 501000, who is directly responsible -sonnel Department of the company. (3) personal injury accident occurs, the direct punishment 500he accident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the per10,000 yuan, responsible for the direct responsibility for t-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-lded plate II, mechanical equipment installation engineering 1 GB1502000 steel pressure vessel products mechanical properties test of we-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-emical JB/ T47082004 petroch-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH352511 , 填写完毕后,点击“下一步”,进入下图。 ing engineering code for construction and acceptance of field equipment 4 HGJ2222002 industrial pipe weld-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-ations, serial number a 1 GB3323icn team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specif1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-500strative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-of criticism and 501000, who is directly responsible for the accident responsibility, give notice -l injury accident occurs, the direct punishment 500hip, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) persona10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leaders-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-ion engineering 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installat-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-alification for steel pressure vessels 7 JB/47092000 of welding procedure qu-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-12 , 如图所示,点击“添加网站”在下图所示的弹出窗口中进行网站信息的填写。 -for grade 3 GB5023689 steel welds manual methods of ultrasonic inspection and testing results -Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-rm in the construction standards and specifications, serial number a 1 GB3323n team injuries accident penalty provisions, mutatis mutandis. Eight, should perfo1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-ences, the pursuit of leadership, along with 500strative leadership of the criticism, resulting in serious consequ100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-for the accident responsibility, give notice of criticism and 501000, who is directly responsible -sonnel Department of the company. (3) personal injury accident occurs, the direct punishment 500he accident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the per10,000 yuan, responsible for the direct responsibility for t-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-lded plate II, mechanical equipment installation engineering 1 GB1502000 steel pressure vessel products mechanical properties test of we-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-emical JB/ T47082004 petroch-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ22213 , 请仔细阅读图中的提示,然后依次填写网站信息,填写完毕后,点击“提交”按钮进行 保存。然后系统会返回到下图所示的窗口中。 -ing engineering code for construction and acceptance of field equipment 4 HGJ2222002 industrial pipe weld-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-ations, serial number a 1 GB3323icn team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specif1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-500strative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-of criticism and 501000, who is directly responsible for the accident responsibility, give notice -l injury accident occurs, the direct punishment 500hip, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) persona10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leaders-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-ion engineering 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installat-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-alification for steel pressure vessels 7 JB/47092000 of welding procedure qu-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH352514 , 如图所示,若还有其它网站信息需要添加的话,请再次点击“添加网站”按钮进行网站 信息的添加。全部网站信息填写完毕后,可以通过点击“添加接入”按钮,进入下图, 为相应网站添加接入信息。 2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-for grade 3 GB5023689 steel welds manual methods of ultrasonic inspection and testing results -Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-rm in the construction standards and specifications, serial number a 1 GB3323n team injuries accident penalty provisions, mutatis mutandis. Eight, should perfo1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-ences, the pursuit of leadership, along with 500strative leadership of the criticism, resulting in serious consequ100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-for the accident responsibility, give notice of criticism and 501000, who is directly responsible -sonnel Department of the company. (3) personal injury accident occurs, the direct punishment 500he accident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the per10,000 yuan, responsible for the direct responsibility for t-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-lded plate II, mechanical equipment installation engineering 1 GB1502000 steel pressure vessel products mechanical properties test of we-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-emical JB/ T47082004 petroch-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-15 , 如图所示,点击弹出窗口中的“添加接入”按钮,进入下图。 ing engineering code for construction and acceptance of field equipment 4 HGJ2222002 industrial pipe weld-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-ations, serial number a 1 GB3323icn team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specif1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-500strative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-of criticism and 501000, who is directly responsible for the accident responsibility, give notice -l injury accident occurs, the direct punishment 500hip, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) persona10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leaders-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-ion engineering 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installat-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-alification for steel pressure vessels 7 JB/47092000 of welding procedure qu-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-16 , 如图所示填写接入信息。注:在“网站接入服务提供者名称”一栏中,可以输入一个或 者两个(用“空格”分割)关键词,然后点击“查询”按钮,系统会在弹出的窗口中显 示符合关键词查询条件的网站接入服务提供者名单。如下图所示。 2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-for grade 3 GB5023689 steel welds manual methods of ultrasonic inspection and testing results -Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-rm in the construction standards and specifications, serial number a 1 GB3323n team injuries accident penalty provisions, mutatis mutandis. Eight, should perfo1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-ences, the pursuit of leadership, along with 500strative leadership of the criticism, resulting in serious consequ100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-for the accident responsibility, give notice of criticism and 501000, who is directly responsible -sonnel Department of the company. (3) personal injury accident occurs, the direct punishment 500he accident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the per10,000 yuan, responsible for the direct responsibility for t-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-lded plate II, mechanical equipment installation engineering 1 GB1502000 steel pressure vessel products mechanical properties test of we-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-emical JB/ T47082004 petroch-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-17 , 用户在如图所示的名单中,选择一个接入服务商(点击其左侧的单选按钮),然后点击 窗口的“确定”按钮。如下图所示,系统会将您选择的接入服务商名称填写到“网站接 入服务提供者名称”一栏中。 ing engineering code for construction and acceptance of field equipment 4 HGJ2222002 industrial pipe weld-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-ations, serial number a 1 GB3323icn team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specif1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-500strative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-of criticism and 501000, who is directly responsible for the accident responsibility, give notice -l injury accident occurs, the direct punishment 500hip, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) persona10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leaders-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-ion engineering 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installat-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-alification for steel pressure vessels 7 JB/47092000 of welding procedure qu-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-18 , 如图所示,点击“提交”按钮完成此接入商的添加操作,系统返回到下图所示的窗口中。 2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-for grade 3 GB5023689 steel welds manual methods of ultrasonic inspection and testing results -Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-rm in the construction standards and specifications, serial number a 1 GB3323n team injuries accident penalty provisions, mutatis mutandis. Eight, should perfo1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-ences, the pursuit of leadership, along with 500strative leadership of the criticism, resulting in serious consequ100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-for the accident responsibility, give notice of criticism and 501000, who is directly responsible -sonnel Department of the company. (3) personal injury accident occurs, the direct punishment 500he accident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the per10,000 yuan, responsible for the direct responsibility for t-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-lded plate II, mechanical equipment installation engineering 1 GB1502000 steel pressure vessel products mechanical properties test of we-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-emical JB/ T47082004 petroch-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-19 , 如果还有其他接入信息需要添加的话,可以点击窗口中的“添加接入”按钮重复以上步 骤进行添加;如果没有其他接入信息需要添加的话,可以点击窗口中的“继续”按钮。 , 网站及其接入信息全部填写完毕后,用户可以点击窗口中的“下一步”按钮,进入下图 所示的窗口。 92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-ing engineering code for construction and acceptance of field equipment 4 HGJ2222002 industrial pipe weld-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-ations, serial number a 1 GB3323icn team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specif1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-500strative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-of criticism and 501000, who is directly responsible for the accident responsibility, give notice -l injury accident occurs, the direct punishment 500hip, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) persona10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leaders-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-ion engineering 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installat-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-alification for steel pressure vessels 7 JB/47092000 of welding procedure qu-2004 petrochemical JB/ T4708-20 , 上图所示是“ICP备案信息总结”,您可以浏览您刚才输入的信息,如有错误可以点击 “上一步”按钮返回上一步骤进行修改。如果确认无误后,点击“完成”按钮,完成备 案信息的报备工作(注:一旦在此处点击“完成”按钮,用户就再也不能对备案信息进 行自主修改了,如要修改的话,必须到相应的接入服务商处,请其为您进行代为修改工 作),进入到下图所示的成功界面中。 92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-for grade 3 GB5023689 steel welds manual methods of ultrasonic inspection and testing results -Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-rm in the construction standards and specifications, serial number a 1 GB3323n team injuries accident penalty provisions, mutatis mutandis. Eight, should perfo1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-ences, the pursuit of leadership, along with 500strative leadership of the criticism, resulting in serious consequ100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-for the accident responsibility, give notice of criticism and 501000, who is directly responsible -sonnel Department of the company. (3) personal injury accident occurs, the direct punishment 500he accident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the per10,000 yuan, responsible for the direct responsibility for t-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-lded plate II, mechanical equipment installation engineering 1 GB1502000 steel pressure vessel products mechanical properties test of we-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-emical JB/ T47082004 petroch-21 , 用户的备案信息提交以后,可以通过点击左侧树型菜单内的“信息浏览”项,对录入的 信息进行浏览。 -ing engineering code for construction and acceptance of field equipment 4 HGJ2222002 industrial pipe weld-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-ations, serial number a 1 GB3323icn team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specif1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-500strative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-of criticism and 501000, who is directly responsible for the accident responsibility, give notice -l injury accident occurs, the direct punishment 500hip, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) persona10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leaders-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-ion engineering 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installat-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-alification for steel pressure vessels 7 JB/47092000 of welding procedure qu-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH352522 , 用户的备案信息提交后,可以点击左侧树型菜单中“查询统计服务-〉备案进度查询”, 查看自己的备案信息当前所处的阶段,如下图所示。 -2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-for grade 3 GB5023689 steel welds manual methods of ultrasonic inspection and testing results -Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-rm in the construction standards and specifications, serial number a 1 GB3323n team injuries accident penalty provisions, mutatis mutandis. Eight, should perfo1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-ences, the pursuit of leadership, along with 500strative leadership of the criticism, resulting in serious consequ100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-for the accident responsibility, give notice of criticism and 501000, who is directly responsible -sonnel Department of the company. (3) personal injury accident occurs, the direct punishment 500he accident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the per10,000 yuan, responsible for the direct responsibility for t-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-lded plate II, mechanical equipment installation engineering 1 GB1502000 steel pressure vessel products mechanical properties test of we-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-emical JB/ T47082004 petroch-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH352523 , 左侧树型菜单的“备案业务管理”中,提供了“电子证书下载”、“注销主体申请”、“注 销网站申请”三项功能。如果您的备案信息已经通过相关部门的审核,您看到的屏幕如 下: ing engineering code for construction and acceptance of field equipment 4 HGJ2222002 industrial pipe weld-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-ations, serial number a 1 GB3323icn team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specif1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-500strative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-of criticism and 501000, who is directly responsible for the accident responsibility, give notice -l injury accident occurs, the direct punishment 500hip, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) persona10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leaders-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-ion engineering 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installat-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-alification for steel pressure vessels 7 JB/47092000 of welding procedure qu-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-24 89 steel welds manual methods of ultrasonic inspection and testing results -Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-rm in the construction standards and specifications, serial number a 1 GB3323n team injuries accident penalty provisions, mutatis mutandis. Eight, should perfo1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-ences, the pursuit of leadership, along with 500strative leadership of the criticism, resulting in serious consequ100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-for the accident responsibility, give notice of criticism and 501000, who is directly responsible -sonnel Department of the company. (3) personal injury accident occurs, the direct punishment 500he accident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the per10,000 yuan, responsible for the direct responsibility for t-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-lded plate II, mechanical equipment installation engineering 1 GB1502000 steel pressure vessel products mechanical properties test of we-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-emical JB/ T47082004 petroch-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-for grade 3 GB5023625 ing engineering code for construction and acceptance of field equipment 4 HGJ2222002 industrial pipe weld-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-ations, serial number a 1 GB3323icn team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specif1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-500strative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-of criticism and 501000, who is directly responsible for the accident responsibility, give notice -l injury accident occurs, the direct punishment 500hip, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) persona10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leaders-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-ion engineering 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installat-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-alification for steel pressure vessels 7 JB/47092000 of welding procedure qu-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-26 -for grade 3 GB5023689 steel welds manual methods of ultrasonic inspection and testing results -Ray lighting and quality rating of 2 GB11345-2005 steel fusion welded butt joints, welding engineering-rm in the construction standards and specifications, serial number a 1 GB3323n team injuries accident penalty provisions, mutatis mutandis. Eight, should perfo1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and constructio-ences, the pursuit of leadership, along with 500strative leadership of the criticism, resulting in serious consequ100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the admini-for the accident responsibility, give notice of criticism and 501000, who is directly responsible -sonnel Department of the company. (3) personal injury accident occurs, the direct punishment 500he accident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the per10,000 yuan, responsible for the direct responsibility for t-accident occurred, the direct punishment 0.52005 vertical cylindrical steel pressure vessel steel welded tank code for construction and acceptance-98 2 GB50128-lded plate II, mechanical equipment installation engineering 1 GB1502000 steel pressure vessel products mechanical properties test of we-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 8 JB4730-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-emical JB/ T47082004 petroch-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ22227
/
本文档为【个人企业网站域名ICP备案流程】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索