为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

如何解决EXCEL不能打印预览

2017-10-19 16页 doc 304KB 15阅读

用户头像

is_105949

暂无简介

举报
如何解决EXCEL不能打印预览如何解决EXCEL不能打印预览 如何解决EXCEL不能打印预览 有朋友说在重装OFFICE2003之后,在没有打印机的情况下,发现WORD可以打印预览,但EXCEL却不可以,甚至不可以“页面设置”,按照网上的做法也没法解决。所以本人亲自试了一下,发现的确有这种情况出现,但网上的朋友解释只解释了一半,难怪没法解决问题。 1、一般我们打开EXCEL要求“打印预览”或“页面设置”,都会出现下面这个画面,因为我们没有打印机。但WORD又可以。 2、我们按照电脑的提示,在“开始”里打开“打印机和传真” use it as a b...
如何解决EXCEL不能打印预览
如何解决EXCEL不能打印预览 如何解决EXCEL不能打印预览 有朋友说在重装OFFICE2003之后,在没有打印机的情况下,发现WORD可以打印预览,但EXCEL却不可以,甚至不可以“页面设置”,按照网上的做法也没法解决。所以本人亲自试了一下,发现的确有这种情况出现,但网上的朋友解释只解释了一半,难怪没法解决问。 1、一般我们打开EXCEL要求“打印预览”或“页面设置”,都会出现下面这个画面,因为我们没有打印机。但WORD又可以。 2、我们按照电脑的,在“开始”里打开“打印机和传真” use it as a basis for project acceptance and handover project completion final accounts, if the employer, the design proposed engineering changes, resulting in rework, downtime, material waste, and so on, we give economic visa units out into the field, economic damage check. Signature recognition, Visa records in the hands of the economy and budget staff, as a basis for project completion final accounts of the original information. Engineering change documents are important components of technical documentation management, engineering and technical management and even an important part of the overall project management. Nineth section, and engineering meeting system assigned project head participate in owners and total contracting people recruiting of engineering meeting, understand engineering command on engineering specific progress, and requirements, situation, coordination solution engineering implementation process in the appeared of problem, coordination I company and the construction units Zhijian of construction progress, informed I company in implementation process in the appeared of technology problem, and quality problem and solution and the rectification of method, and means and completed of date. Formation meeting and at each meeting record-keeping system reporting to the company in a timely manner and through the construction of grass-roots teams. Tenth section, and construction technology low-down we by technology chief engineer is responsible for implementation related sector and the personnel, technology low-down work of purpose has two aspects: a is to clear by bear construction task of 3、但发现里面没有打印机,于是想着“添加打印机”,安装“虚拟打 印机”。于是按下面的“添加打印机” 4、但会出现错误。 use it as a basis for project acceptance and handover project completion final accounts, if the employer, the design proposed engineering changes, resulting in rework, downtime, material waste, and so on, we give economic visa units out into the field, economic damage check. Signature recognition, Visa records in the hands of the economy and budget staff, as a basis for project completion final accounts of the original information. Engineering change documents are important components of technical documentation management, engineering and technical management and even an important part of the overall project management. Nineth section, and engineering meeting system assigned project head participate in owners and total contracting people recruiting of engineering meeting, understand engineering command on engineering specific progress, and requirements, situation, coordination solution engineering implementation process in the appeared of problem, coordination I company and the construction units Zhijian of construction progress, informed I company in implementation process in the appeared of technology problem, and quality problem and solution and the rectification of method, and means and completed of date. Formation meeting and at each meeting record-keeping system reporting to the company in a timely manner and through the construction of grass-roots teams. Tenth section, and construction technology low-down we by technology chief engineer is responsible for implementation related sector and the personnel, technology low-down work of purpose has two aspects: a is to clear by bear construction task of 5、正确的做法是: 1)先在“开始”的“运行”里, 2)搜索“services.msc” 3)打开之后,在右边找“print Spooler”,然后双击它。发现它是手动的或是禁止的, 而“启动状态”是“已经停止” use it as a basis for project acceptance and handover project completion final accounts, if the employer, the design proposed engineering changes, resulting in rework, downtime, material waste, and so on, we give economic visa units out into the field, economic damage check. Signature recognition, Visa records in the hands of the economy and budget staff, as a basis for project completion final accounts of the original information. Engineering change documents are important components of technical documentation management, engineering and technical management and even an important part of the overall project management. Nineth section, and engineering meeting system assigned project head participate in owners and total contracting people recruiting of engineering meeting, understand engineering command on engineering specific progress, and requirements, situation, coordination solution engineering implementation process in the appeared of problem, coordination I company and the construction units Zhijian of construction progress, informed I company in implementation process in the appeared of technology problem, and quality problem and solution and the rectification of method, and means and completed of date. Formation meeting and at each meeting record-keeping system reporting to the company in a timely manner and through the construction of grass-roots teams. Tenth section, and construction technology low-down we by technology chief engineer is responsible for implementation related sector and the personnel, technology low-down work of purpose has two aspects: a is to clear by bear construction task of 4)把“手动”改为“自动”,“服务状态”按“启动”, use it as a basis for project acceptance and handover project completion final accounts, if the employer, the design proposed engineering changes, resulting in rework, downtime, material waste, and so on, we give economic visa units out into the field, economic damage check. Signature recognition, Visa records in the hands of the economy and budget staff, as a basis for project completion final accounts of the original information. Engineering change documents are important components of technical documentation management, engineering and technical management and even an important part of the overall project management. Nineth section, and engineering meeting system assigned project head participate in owners and total contracting people recruiting of engineering meeting, understand engineering command on engineering specific progress, and requirements, situation, coordination solution engineering implementation process in the appeared of problem, coordination I company and the construction units Zhijian of construction progress, informed I company in implementation process in the appeared of technology problem, and quality problem and solution and the rectification of method, and means and completed of date. Formation meeting and at each meeting record-keeping system reporting to the company in a timely manner and through the construction of grass-roots teams. Tenth section, and construction technology low-down we by technology chief engineer is responsible for implementation related sector and the personnel, technology low-down work of purpose has two aspects: a is to clear by bear construction task of 5)确定之后,再回来“开始”--“打印机与传真”,按“添加打印机”,出现下面的画面,按 下一步 6)再按下一步 use it as a basis for project acceptance and handover project completion final accounts, if the employer, the design proposed engineering changes, resulting in rework, downtime, material waste, and so on, we give economic visa units out into the field, economic damage check. Signature recognition, Visa records in the hands of the economy and budget staff, as a basis for project completion final accounts of the original information. Engineering change documents are important components of technical documentation management, engineering and technical management and even an important part of the overall project management. Nineth section, and engineering meeting system assigned project head participate in owners and total contracting people recruiting of engineering meeting, understand engineering command on engineering specific progress, and requirements, situation, coordination solution engineering implementation process in the appeared of problem, coordination I company and the construction units Zhijian of construction progress, informed I company in implementation process in the appeared of technology problem, and quality problem and solution and the rectification of method, and means and completed of date. Formation meeting and at each meeting record-keeping system reporting to the company in a timely manner and through the construction of grass-roots teams. Tenth section, and construction technology low-down we by technology chief engineer is responsible for implementation related sector and the personnel, technology low-down work of purpose has two aspects: a is to clear by bear construction task of 7) use it as a basis for project acceptance and handover project completion final accounts, if the employer, the design proposed engineering changes, resulting in rework, downtime, material waste, and so on, we give economic visa units out into the field, economic damage check. Signature recognition, Visa records in the hands of the economy and budget staff, as a basis for project completion final accounts of the original information. Engineering change documents are important components of technical documentation management, engineering and technical management and even an important part of the overall project management. Nineth section, and engineering meeting system assigned project head participate in owners and total contracting people recruiting of engineering meeting, understand engineering command on engineering specific progress, and requirements, situation, coordination solution engineering implementation process in the appeared of problem, coordination I company and the construction units Zhijian of construction progress, informed I company in implementation process in the appeared of technology problem, and quality problem and solution and the rectification of method, and means and completed of date. Formation meeting and at each meeting record-keeping system reporting to the company in a timely manner and through the construction of grass-roots teams. Tenth section, and construction technology low-down we by technology chief engineer is responsible for implementation related sector and the personnel, technology low-down work of purpose has two aspects: a is to clear by bear construction task of 8)到这里时,随便选一个驱动 9)由于我们没有打印机,就选“否”吧 use it as a basis for project acceptance and handover project completion final accounts, if the employer, the design proposed engineering changes, resulting in rework, downtime, material waste, and so on, we give economic visa units out into the field, economic damage check. Signature recognition, Visa records in the hands of the economy and budget staff, as a basis for project completion final accounts of the original information. Engineering change documents are important components of technical documentation management, engineering and technical management and even an important part of the overall project management. Nineth section, and engineering meeting system assigned project head participate in owners and total contracting people recruiting of engineering meeting, understand engineering command on engineering specific progress, and requirements, situation, coordination solution engineering implementation process in the appeared of problem, coordination I company and the construction units Zhijian of construction progress, informed I company in implementation process in the appeared of technology problem, and quality problem and solution and the rectification of method, and means and completed of date. Formation meeting and at each meeting record-keeping system reporting to the company in a timely manner and through the construction of grass-roots teams. Tenth section, and construction technology low-down we by technology chief engineer is responsible for implementation related sector and the personnel, technology low-down work of purpose has two aspects: a is to clear by bear construction task of 10)确定完之后,这里出现打印机的图标了。 11)再打开EXCEL再测试一下,“打印预览”可以用了。呵呵, use it as a basis for project acceptance and handover project completion final accounts, if the employer, the design proposed engineering changes, resulting in rework, downtime, material waste, and so on, we give economic visa units out into the field, economic damage check. Signature recognition, Visa records in the hands of the economy and budget staff, as a basis for project completion final accounts of the original information. Engineering change documents are important components of technical documentation management, engineering and technical management and even an important part of the overall project management. Nineth section, and engineering meeting system assigned project head participate in owners and total contracting people recruiting of engineering meeting, understand engineering command on engineering specific progress, and requirements, situation, coordination solution engineering implementation process in the appeared of problem, coordination I company and the construction units Zhijian of construction progress, informed I company in implementation process in the appeared of technology problem, and quality problem and solution and the rectification of method, and means and completed of date. Formation meeting and at each meeting record-keeping system reporting to the company in a timely manner and through the construction of grass-roots teams. Tenth section, and construction technology low-down we by technology chief engineer is responsible for implementation related sector and the personnel, technology low-down work of purpose has two aspects: a is to clear by bear construction task of use it as a basis for project acceptance and handover project completion final accounts, if the employer, the design proposed engineering changes, resulting in rework, downtime, material waste, and so on, we give economic visa units out into the field, economic damage check. Signature recognition, Visa records in the hands of the economy and budget staff, as a basis for project completion final accounts of the original information. Engineering change documents are important components of technical documentation management, engineering and technical management and even an important part of the overall project management. Nineth section, and engineering meeting system assigned project head participate in owners and total contracting people recruiting of engineering meeting, understand engineering command on engineering specific progress, and requirements, situation, coordination solution engineering implementation process in the appeared of problem, coordination I company and the construction units Zhijian of construction progress, informed I company in implementation process in the appeared of technology problem, and quality problem and solution and the rectification of method, and means and completed of date. Formation meeting and at each meeting record-keeping system reporting to the company in a timely manner and through the construction of grass-roots teams. Tenth section, and construction technology low-down we by technology chief engineer is responsible for implementation related sector and the personnel, technology low-down work of purpose has two aspects: a is to clear by bear construction task of
/
本文档为【如何解决EXCEL不能打印预览】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索