为了正常的体验网站,请在浏览器设置里面开启Javascript功能!
首页 > 辽师大版快乐英语小学五年级下学期期末考试模拟试题1

辽师大版快乐英语小学五年级下学期期末考试模拟试题1

2017-09-30 50页 doc 477KB 292阅读

用户头像

is_721103

暂无简介

举报
辽师大版快乐英语小学五年级下学期期末考试模拟试题1辽师大版快乐英语小学五年级下学期期末考试模拟试题1 1、 有一个数学运算符号“”使下列算式成立:24=8~53=13~35=11~97=25.那么73=__17___。 1. 小永的三门功课的成绩~如果不算语文~平均分是98分,如果不算数学~平均分是93分,如果不算英语~平均分是91分。小永三门功课的平均成绩是___94____分。 2. 一家三口人~爸爸比妈妈大3岁~现在他们一家人的年龄之和是80岁~10年前全家人的年龄之和是51岁~女儿今年___9____岁。 3. 书店以每本10(08元的价格购进某种图书~每本售...
辽师大版快乐英语小学五年级下学期期末考试模拟试题1
辽师大版快乐英语小学五年级下学期期末考试模拟试1 1、 有一个数学运算符号“”使下列算式成立:24=8~53=13~35=11~97=25.那么73=__17___。 1. 小永的三门功课的成绩~如果不算语文~平均分是98分,如果不算数学~平均分是93分,如果不算英语~平均分是91分。小永三门功课的平均成绩是___94____分。 2. 一家三口人~爸爸比妈妈大3岁~现在他们一家人的年龄之和是80岁~10年前全家人的年龄之和是51岁~女儿今年___9____岁。 3. 书店以每本10(08元的价格购进某种图书~每本售价16(80元~卖到还剩10本时~除了收回全部成本外~还获利504administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 元这个书店购进该种图书____100___本。 4. 列车通过300米长的隧道用15秒~通过180米长的桥梁用12秒~列车的车身长是____300___米。 5. 若四位数能被11整除~则a代表的数字是 __3_______。 6. 如果四位数X=6??8能被236整除~那么X除以236所得的商是______28_____。 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 2 7. 如右图~是一片刚刚收割过的稻田~每个小正方形的边长是1米~A~B~C三点周围的阴影部分是圆形的水洼(一只小鸟飞来飞去~四处觅食~它最初停留在0号位~过了一会儿~它跃过水洼~飞到关于A点对称的1号位,不久~它又飞到关于B点对称的2号位,接着~它飞到关于C点对称的3号位~再飞到关于A点对称的4号位~„„如此继续~一直对称地飞下去(由此推断~2004号位和0号位之间的距离是 0 米(,2试第12题, 8. 盒子里放有编号为1到10的十个球~小明先后三次从盒中共取出九个球(如果从第二次开始~每次取出的球的编号之和都是前一次的2倍~那么未取出的球的编号是 6 _ 。 9. 幼儿园老师给几组小朋友分苹果~每组分7个~少3个,每组分6个~则多4个(苹果有______46__ 个~小朋友共 _____7__ 组。 administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 10. 某人徒步旅行~平路每天走38千米~山路每天走23千米~他15天共走了450千米。这期间他走了 184 千米山路。 真的不掉线吗,,、,,,,,,,,,,,, 11. 右图是一所小学的科技楼~它有4层~正面每层的三个圆形窗户由左向右表示一 个三位数~这些三位数是:837~571~206~439~但是不知道这四个数和哪一层的窗户对应(请你观察一下~然后画出表示2008的四个窗户 ( 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 4 12. 一次口算比赛~规定:答对一题得8分~答错一题倒扣5分(小华答了18道题~得92分~小华在此比赛中答错了 4 道题。 13. 口袋中有10个小球~颜色为1红、2黄、3蓝、4绿~至少需要摸出 8 个小球才可以保证其中一定含有3种不同颜色的小球。 14. 甲乙两人分别从A~B两地同时出发~相向而行。第一次在距A地40千米处相遇~两人继续向前行走~到达对方的出发点后立即返回~在距B地20千米处第二次相遇~则A~B两地相距____100___千米。 administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 15. 一架飞机从A地飞到B地~再返回A地。去时每小时飞1500千米~返回时每小时飞1000千米~来回共用6小时。那么A、B相距______3600_____千米。 16. 东、西两城相距75千米。小明从东向西~每小时走6.5千米。小希从西向东~每小时走6千米。小辉骑自行车从东向西而行~每小时行走15千米。三人同时动身~途中小辉遇见小希即折回向东行~遇见了小明又折回向西而行,再遇见小希又折回向东行。小辉这样往返-直到三人在途中相遇为止。小辉共行了____90____千米。 17. 学生问老师多少岁~老师说:“当我像你这么大时~你刚1岁~当你像我这么大时~我已经40岁了。”你知道老师多少岁吗, 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 6 分析:画线段图可知40与1的差相当于三个年龄差~所以年龄差为13岁~进而可以求出学生14岁~老师27岁。 18. 学校举行一次考试~科目是英语、历史、数学、物理和语文~每科满分5分~其余等级依次为4、3、2、1分(今已知按总分从多到少排列着5名同学A、B、C、D、 E~并且满足条件:?在同一科目中以及在总分中没有两人得同样的分数,?A的总分为24分,?C有4门科目得了相同的分数,?D历史得4分,?E物理得5分~语文得3分(那么B的成绩为:英语_______分~历史_______分~数学______分~物理______分~语文______分( administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 英 历 数 物 语 分析:A的总分为24~那么A的分 数只可能是4个5分和1个4分~而E 的物理为5分~所以其他4科A都是5 语 史 学 理 文 分(5人的总分是(1+2+3+4+5)×5=75~ 于是B、C、D、E的分数和为75—24=51~ 而E的分数至少是11~其他3少的分数 依次增高~所以这4个人的分数只能是 A 5 5 5 4 5 15、13、12、11.现在已经知道了A和E 的各科分数(C有4科分数一样~不能是 4和5~而总分是13~所以C有4科是3 分、一科是1分。D的历史是4分~他的 B 4 2 4 1 4 总分为12~而现在只剩下一个1分、3 个4分5个2分可以分配~这样D的其 他4科只能都是2分(A、C、D、E的分 数都已得到~剩下的即为B的分数。 C 3 3 3 3 1 D 2 4 2 2 2 真的不掉线 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500E l l l 5 3 8 吗,,、,,,,,,,,,,,, 提高班 1. 根据规律填空: ?15~16~13~19~11~22~___9____~___25____ 。 ? 3~5~9~17~____33____~65( 2. a、b、c都是质数~并且a十b=33~b+c=44~c+d=66~那么d=_____53_____。 3. 有一个数学运算符号“”使下列算式成立:24=8~53=13~35=11~97=25.那么73=__17___。 administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 4. 小永的三门功课的成绩~如果不算语文~平均分是98分,如果不算数学~平均分是93分,如果不算英语~平均分是91分。小永三门功课的平均成绩是___94____分。 5. 一家三口人~爸爸比妈妈大3岁~现在他们一家人的年龄之和是80岁~10年前全家人的年龄之和是51岁~女儿今年___9____岁。 6. 书店以每本10(08元的价格购进某种图书~每本售价16(80元~卖到还剩10本时~除了收回全部成本外~还获利504元这个书店购进该种图书____100___本。 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 10 7. 列车通过300米长的隧道用15秒~通过180米长的桥梁用12秒~列车的车身长是____300___米。 8. 若四位数能被11整除~则a代表的数字是 __3_______。 9. 如果四位数X=6??8能被236整除~那么X除以236所得的商是______28_____。 10. 如右图~是一片刚刚收割过的稻田~每个小正方形的边长是1米~A~B~C三点周围的阴影部分是圆形的水洼(一只小鸟飞来飞去~四处觅食~它最初停留在0号位~过了一会儿~它跃过水洼~飞到关于A点对称的1号位,不久~它又飞到关于B点对称的2号位,接着~它飞到关于C点对称的3号位~再飞 administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 到关于A点对称的4号位~„„如此继续~一直对称地飞下去(由此推断~2004号位和0号位之间的距离是 0 米(,2试第12题, 11. 盒子里放有编号为1到10的十个球~小明先后三次从盒中共取出九个球(如果从第二次开始~每次取出的球的编号之和都是前一次的2倍~那么未取出的球的编号是 6 _ 。 12. 幼儿园老师给几组小朋友分苹果~每组分7个~少3个,每组分6个~则多4个(苹果有______46__ 个~小朋友共 _____7__ 组。 13. 某人徒步旅行~平路每天走38千米~山路每天走23千米~他15天共走了450千米。这期间他走了 184 千米山 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 12 路。 真的不掉线吗,,、,,,,,,,,,,,, 14. 右图是一所小学的科技楼~它有4层~正面每层的三 个圆形窗户由左向右表示一 个三位数~这些三位数是:837~571~ 206~439~但是不知道这四个数和哪一层的窗户对应(请你观察 administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 一下~然后画出表示2008的四个窗户 ( 15. 一次口算比赛~规定:答对一题得8分~答错一题倒扣5分(小华答了18道题~得92分~小华在此比赛中答错了 4 道题。 16. 口袋中有10个小球~颜色为1红、2黄、3蓝、4绿~至少需要摸出 8 个小球才可以保证其中一定含有3种不同颜色的小球。 17. 甲乙两人分别从A~B两地同时出发~相向而行。第 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 14 一次在距A地40千米处相遇~两人继续向前行走~到达对方的出发点后立即返回~在距B地20千米处第二次相遇~则A~B两地相距____100___千米。 18. 一架飞机从A地飞到B地~再返回A地。去时每小时飞1500千米~返回时每小时飞1000千米~来回共用6小时。那么A、B相距______3600_____千米。 19. 东、西两城相距75千米。小明从东向西~每小时走6.5千米。小希从西向东~每小时走6千米。小辉骑自行车从东向西而行~每小时行走15千米。三人同时动身~途中小辉遇见小希即折回向东行~遇见了小明又折回向西而行,再遇见小希又折回向东行。小辉这样往返-直到三人在途中相遇为止。小辉共行了____90____千米。 administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 20. 满足被5除余3~被6除余l~被7除余2的最小的自然数是____163____. 21. 学生问老师多少岁~老师说:“当我像你这么大时~你刚1岁~当你像我这么大时~我已经40岁了。”你知道老师多少岁吗, 分析:画线段图可知40与1的差相当于三个年龄差~所以年龄差为13岁~进而可以求出学生14岁~老师27岁。 22. 学校举行一次考试~科目是英语、历史、数学、物理和语文~每科满分5分~其余等级依次为4、3、2、1分(今已知按总分从多到少排列着5名同学A、B、C、D、 E~并且满足条件:?在同一科目中以及在总分中没有两人得同样的分数,?A的总分为24分,?C有4门科目得了相同的分数,?D历史得4分,?E物理得5分~语文得3分(那么B的成绩为:英语_______ 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 16 分~历史_______分~数学______分~物理______分~语文______ 分( administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 英 历 数 物 语 分析:A的总分为24~那么A的分 数只可能是4个5分和1个4分~而E 的物理为5分~所以其他4科A都是5 语 史 学 理 文 分(5人的总分是(1+2+3+4+5)×5=75~ 于是B、C、D、E的分数和为75—24=51~ 而E的分数至少是11~其他3少的分数 依次增高~所以这4个人的分数只能是 A 5 5 5 4 5 15、13、12、11.现在已经知道了A和E 的各科分数(C有4科分数一样~不能是 4和5~而总分是13~所以C有4科是3 分、一科是1分。D的历史是4分~他的 B 4 2 4 1 4 总分为12~而现在只剩下一个1分、3 个4分5个2分可以分配~这样D的其 他4科只能都是2分(A、C、D、E的分 数都已得到~剩下的即为B的分数。 C 3 3 3 3 1 D 2 4 2 2 2 真的不掉线 吗,,、,,,,,,,,,,,, 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500E l l l 5 3 18 23. 甲、乙两人沿铁路相向而行~速度相同。一列火车从甲身边开过~用了8秒~离开甲后5分钟与乙相遇~用了7秒开过。从乙与火车相遇开始~再过______分钟~甲、乙两人相遇。 分析:一列火车从甲身边开过~用了8秒:车长为 = 8×,车速-人速,,离开甲后5分钟与乙相遇~用了7秒开过:车长为 = 7×,车速+人速, ,所以可得:车速=15×人速 。当火车车尾离开甲到乙与火车相遇时~甲乙之间的路程为~5×,车速-人速,= 5×14人速=70人速~所以再过70人速?2人速=35,分钟,~甲、乙两人相遇。 精英班 1. 根据规律填空: ?15~16~13~19~11~22~___9____~___25____ 。 administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan ? 3~5~9~17~____33____~65( 2. a、b、c都是质数~并且a十b=33~b+c=44~c+d=66~那么d=_____53_____。 3. 有一个数学运算符号“”使下列算式成立:24=8~53=13~35=11~97=25.那么73=__17___。 4. 小永的三门功课的成绩~如果不算语文~平均分是98分,如果不算数学~平均分是93分,如果不算英语~平均分是91分。小永三门功课的平均成绩是___94____分。 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 20 5. 一家三口人~爸爸比妈妈大3岁~现在他们一家人的年龄之和是80岁~10年前全家人的年龄之和是51岁~女儿今年___9____岁。 6. 书店以每本10(08元的价格购进某种图书~每本售价16(80元~卖到还剩10本时~除了收回全部成本外~还获利504元这个书店购进该种图书____100___本。 7. 列车通过300米长的隧道用15秒~通过180米长的桥梁用12秒~列车的车身长是____300___米。 8. 若四位数能被11整除~则a代表的数字是 __3_______。 administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 9. 如果四位数X=6??8能被236整除~那么X除以236所得的商是______28_____。 10. 如右图~是一片刚刚收割过的稻田~每个小正方形的边长是1米~A~B~C三点周围的阴影部分是圆形的水洼(一只小鸟飞来飞去~四处觅食~它最初停留在0号位~过了一会儿~它跃过水洼~飞到关于A点对称的1号位,不久~它又飞到关于B点对称的2号位,接着~它飞到关于C点对称的3号位~再飞到关于A点对称的4号位~„„如此继续~一直对称地飞下去(由此推断~2004号位和0号位之间的距离是 0 米(,2试第12题, 11. 盒子里放有编号为1到10的十个球~小明先后三次从盒中共取出九个球(如果从第二次开始~每次取出的球的编号 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 22 之和都是前一次的2倍~那么未取出的球的编号是 6 _ 。 12.幼儿园老师给几组小朋友分苹果~每组分7个~少3个,每组分6个~则多4个(苹果有______46__ 真的不掉线吗,,、,,,,,,,,,,,, 个~小朋友共 _____7__ 组。 12. 40只脚的蜈蚣与3个头的龙同在一个笼中~共有26个头和298只脚。若40只脚的蜈蚣有一个头~那么3个头的龙有___14___只脚。 administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 13. 右图是一所小学的科技楼~它有4层~正面每层的三个圆形窗户由左向右表示一 个三位数~这些三位数是:837~571~206~439~但是不知道这四个数和哪一层的窗户对应(请你观察一下~然后画出表示2008的四个窗户 ( 14. 一次口算比赛~规定:答对一题得8分~答错一题倒扣5分(小华答了18道题~得92分~小华在此比赛中答错了 4 道题。 15. 口袋中有10个小球~颜色为1红、2黄、3蓝、4绿~至少需要摸出 8 个小球才可以保证其中一定含有3种不同颜色的小球。 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 24 16. 在右图中四个圆圈内分别填入四个不同的自然数~使得1至13中任一个自然数都可以表示成若干相邻圆圈内填数之和~那么填入的四个自然数依次为 1 、 2 、 6 、 4 。,按顺时针顺序, 17. 原计划有600块砖让现有的男孩搬运~后来又来了两个女孩~工作量平均分配~每个男孩比原计划少搬25块~那么共有_____6____个男孩。 18. 东、西两城相距75千米。小明从东向西~每小时走6.5千米。小希从西向东~每小时走6千米。小辉骑自行车从东向西而行~每小时行走15千米。三人同时动身~途中小辉遇见小希即折回向东行~遇见了小明又折回向西而行,再遇见小希又折回向东行。小辉这样往返-直到三人在途中相遇为止。小辉共行了____90____千米。 administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 19. 满足被5除余3~被6除余l~被7除余2的最小的自然数是____163____. 20. 学生问老师多少岁~老师说:“当我像你这么大时~你刚1岁~当你像我这么大时~我已经40岁了。”你知道老师多少岁吗, 分析:画线段图可知40与1的差相当于三个年龄差~所以年龄差为13岁~进而可以求出学生14岁~老师27岁。 21. 对于一个自然数n~如果能找到非零自然数k和l~使得n=k+l+kl~则称n为一个“好数”~如3=1+1+11~则3是一个“好数”。在1~2~„~46这g个自然数中~“好数”共有 个。 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 26 分析: 又k和l都是非零自然数~故n+1为合数~在1,46中加上 1之后不是合数的有1~2~4~6~10~12~16~18~22~28~30~ 36~40~42~46共15个。因此~“好数”共有46-15=31(个)。 真的不掉线吗,,、,,,,,,,,,,,, administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 22. 学校举行一次考试~科目是英语、历史、数学、物理和语文~每科满分5分~其余等级依次为4、3、2、1分(今已知按总分从多到少排列着5名同学A、B、C、D、 E~并且满足条件:?在同一科目中以及在总分中没有两人得同样的分数,?A的总分为24分,?C有4门科目得了相同的分数,?D历史得4分,?E物理得5分~语文得3分(那么B的成绩为:英语_______分~历史_______分~数学______分~物理______分~语文______分( 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 28 英 历 数 物 语 分析:A的总分为24~那么A的分 数只可能是4个5分和1个4分~而E 的物理为5分~所以其他4科A都是5 语 史 学 理 文 分(5人的总分是(1+2+3+4+5)×5=75~ 于是B、C、D、E的分数和为75—24=51~ 而E的分数至少是11~其他3少的分数 依次增高~所以这4个人的分数只能是 A 5 5 5 4 5 15、13、12、11.现在已经知道了A和E 的各科分数(C有4科分数一样~不能是 4和5~而总分是13~所以C有4科是3 分、一科是1分。D的历史是4分~他的 B 4 2 4 1 4 总分为12~而现在只剩下一个1分、3 个4分5个2分可以分配~这样D的其 他4科只能都是2分(A、C、D、E的分 数都已得到~剩下的即为B的分数。 C 3 3 3 3 1 D 2 4 2 2 2 23. 甲、乙两人沿铁路相向而行~ 速度相同。一列火车从甲身边开过~用 了8秒~离开甲后5分钟与乙相遇~用 了7秒开过。从乙与火车相遇开始~再 E l l l 5 3 administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 过______分钟~甲、乙两人相遇。 分析:一列火车从甲身边开过~用了8秒:车长为 = 8×,车速-人速,,离开甲后5分钟与乙相遇~用了7秒开过:车长为 = 7×,车速+人速, ,所以可得:车速=15×人速 。当火车车尾离开甲到乙与火车相遇时~甲乙之间的路程为~5×,车速-人速,= 5×14人速=70人速~所以再过70人速?2人速=35,分钟,~甲、乙两人相遇。 真的不掉线吗,,、,,,,,,,,,,,, 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 30 am ([æm] ,is [iz]是)?was:[w?z] make([meik] 做;制造)?made:[meid] move([mu:v] 移动)?moved[mu:vd] draw([dr?:] 画) ?drew:[dru:] play([plei] 玩耍) ?played work([w?:k] 工作) ?worked[t] say([sei] 说) ?[sed] are([ɑ:] 是) ?were[w?:] cut( [k?t] 切;割;剪) ?cut administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan colour(['k?l?] 染色) ?cloured find([faind] 发现) ?found[faund] put([put] 放) ?put roll([r?ul] 打滚) ?rolled fall([f?:l] 落下;跌倒) ?fell[fel] burn([b?:n] 燃烧) ?burnt/burned buy([bai] 买) ?bought[b?:t] lay([lei] 下蛋;产卵) ?laid[leid] lead([li:d] 引导;领(路)) ?led[led] 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 32 learn([l?:n] 学习) ?learnt/learned leave([li:v] 离开) ?left[left] lend([lend] 把...借给) ?lent 真的不掉线吗,,、,,,,,,,,,,,, let([let] 让) ?let lie([lai] 撒谎) ?lay lose([lu:z] 丢失) ?lost[l?st] spell[spel] 拼写?spelt[spelt]/spelled spend[spend] 花(钱),花费?spent administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan stand[stænd] 站立?stood[stud] sweep[swi:p] 打扫?swept catch[kæt?] 抓住?caught[k?:t] choose[t?u:z] 选择?chose[t??uz] e[k?m] 来?came[keim] cost[k?st] 花费?cost dig[dig] 掘(土);挖?dug[d?g] do[du:] 做?did[did] draw[dr?:] 画?drew[dru:] 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 34 drink[dri?k] 饮,喝?drank [dræ?k] drive[draiv] 驾驶(汽车等) ?drove[dr?uv] eat[i:t] 吃?ate[eit] feel[fi:l] 摸,触、感觉?felt fly[flai] 飞?flew[flu:] meet[mi:t] 遇见?met[met] read[ri:d] 读?read ride骑(马等);乘(车等) [raid] ?rode[r?ud] ring[ri?]摇铃?rang[ræ?] rise[raiz] 上升?rose administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan run[r?n] 跑,奔?ran[ræn] swim[swim] 游泳?swam[swæm] take[teik] 拿,取; ?took[tuk] tell[tel] 告诉?told[t?uld] think[θi?k] 想?thought[θ?:t] throw[θr?u] 投,,扔?threw[θru:] forget [f?'get] 忘记?forgot[f?'g?t] freeze[fri:z] 结冰,凝固?froze[fr?uz] get[get] 到达?got[g?t] 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 36 give[giv] 给?gave[geiv] go [g?u] 去,行走?went[went] grow [gr?u] 生长?grew[gru:] hang[hæ?] 把...挂起?hung[h??]/hanged have[hæv]/has[hæz] 有?had hear[hi?] 听见?heard[h?:d] hide[haid] 把...藏起来?hid[hid] hit[hit] 打,击中?hit hurt[h?:t] 受伤?hurt keep[ki:p] 持有,保有?kept administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan know [n?u] 知道;懂得?knew[nju:] see[si:] 看见?saw[s?:] sell[sel] 卖?sold[s?uld] set[set] 放,置?set shake[?eik] 摇?shook[?uk] shine[?ain] 发光;照耀?shone[??n]/shined show[??u] 显示,露出?showed sing[si?] 唱歌?sang[sæ?]/sung[s??] sink[si?k]下沉?sank[sæ?k] /sunk[s??k] 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 38 sit[sit] 坐?sat[sæt] sleep[sli:p] 睡觉?slept[slept] smell[smel]嗅,闻?smelt[smelt]/smelled speak[spi:k] 说话?spoke[sp?uk] teach[ti:t?] 教?taught[t?:t] understand[,?nd?'stænd] 理解;懂?:understood ['?nd?'stud] wake[weik] 唤醒?woke[w?uk]/waked wear[w??] 穿着?wore[w?:] win[win] 获胜,成功?won[w?n] administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan write[rait] 写下?wrote[r?ut] 真的不掉线 吗,,、,,,,,,,,,,,, 八年级看图短文填空专项练习 看图短文填空专项练习 1 Tom was a poor boy(He made a living by cleaning leather(皮革) 1 for others in the street(Tom was also 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 40 a 2 boy(One day~a rich man 3 Miser appeared in front of Tom( He watched his 4 shoes for a while~and then~looked at Tom(Tom knew this kind of people well(They love money but hate to spend it( Tom said~“Let me 5 your shoes~sir(Only two pence(便土)~sir( Mr(Miser shook his head and walked away( Tom thought for a second and then called out~ ‘‘I’d like to clean it for nothing(”This time Mr(Miser agreed(And soon one of his shoes was shining brightly( When the rich man put his other shoe on the stool(凳 真的不掉线吗,,、,,,,,,,,,,,, 子)~Tom said he wouldn’t clean it for him 6 he was administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan paid two pence for his work(Mr(Miser was very 7 (He refused to pay anything and went away( But to his 8 ~the well-cleaned shoe was so bright that it made the other one look even dirtier(Mr(Miser looked round(People in the street were 9 at him( Finally the rich man 10 and gave Tom two pence(In a very short time his two shoes shone brightly( 2 Jerry is a middle school student. He likes 1 very much and his favourite star is Jay Chou. He usually practices Jay’s songs. One day, he took part in an imitation 2 of Jay in a park. He chose one of Jay’s most 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 42 3 songs, he sang and acted with his heart. He 4 he was acting just as Jay himself did. So when he heard someone 5 “once again, once again”, he was moved and 6 them. But to his surprise, the other two 7 of Jay who watched Jerry act told him what they really 8 . They wanted Jerry to practice more 9 he had acted so badly! Jerry was 10 and couldn’t say a word. 真的不掉线吗,,、,,,,,,,,,,,, 3 administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan Xiaohong is a primary school student. On (1) , she has to do all kinds of extra work. On Saturday morning, she has to practice the (2) . In the afternoon, her parents want her to practice (3) . On Sunday morning, she has a(n) (4) lesson. On Sunday afternoon, she has to learn (5) . Does this girl really have so many (6) ? Nowadays, parents in China have too much hope for their (7) . They hope that their children are able to (8) some special skills so that they can 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 44 have a better life in the future. In my (9) , few of the children are really interested in these lessons. Children are children. They must have some free time to enjoy their childhood. As an English proverb(谚语) goes, “All work and no (10) makes Jack a dull boy.” 4 thIt was December 25, my friends and I had a party in my house to celebrate (1) . Everyone(2) themselves at the party. But(3) 真的不掉线吗,,、,,,,,,,,,,,, something unhappy happened. I happened to find David, administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan my friend,(4) my diary in my bedroom. At that time I was so(5) that I(6) at him. David stood up and (7) my house at once, (8) saying a word. After he left, I thought it was not (9) to read other’s diary, yet it was not polite to shout at (10) . It’ s better for me to tell him not to do that politely. 5 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 46 It was Sunday. The weather was very fine. The students of Class One went out for a 1 .They went by 2 with fruits, vegetables, meat , cookers and some other things. At about half past ten, they 3 at the foot of a hill. There was a big 4 and many green trees there. Birds were singing and the air was very fresh. The students were busy 5 for the picnic. Some of them were getting 6 from the lake, some were washing vegeta真 的不掉线吗,,、,,,,,,,,,,,, bles and fruits, and others were putting a big cloth on the grass. At about twelve o’clock the lunch was ready. After lunch, they had a 7 time singing, dancing, drinking and talking. At three o’clock, they began to 8 the hill. The hill was quite 9 , but they all tried to climb to the 10 of it. On the top of the hill, they felt very excited and all cheered. administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 6 Mr. Smith is a sixty-year-old man. He loves sports. He often goes to different places to kill his spare time and enjoys the beautiful countryside scenery. On a 1 Saturday afternoon, Mr. Smith went 2 in the country. He carried a rucksack ,背包,on his back, with a stick in his hand. In the evening, he decided to stop for a 3 . He didn’t want to sleep in the open air, so he began to 4 up a tent near a village. The he made a 5 not far from the tent and placed a pot 6 the fire to cook something to eat. After supper, he spent the night in the tent. Because he kept walking a whole day, 真的不 掉线吗,,、,,,,,,,,,,,, he was very tired and fell asleep soon. At the mid-night the weather began to turn bad. A 7 wind began to blow. At that time, Mr. Smith was still 8 . The next morning, when he 9 up, he found himself in the open air. And to his great surprise, there was a pig, a 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 48 10 , a goose, a sheep and a cock running around him! 7 It was a reading room. A boy and a girl were sitting (1)____ a desk. The girl was reading (2)____when the boy suddenly(3)____ , because he was reading a book of jokes. The girl (4)____him by (5)____ him to look at the (6)____ with the words “Be quiet”. The boy (7) ____sorry and stopped laughing at once. Then he thought of an (8)____ . He took the book outside and (9)____ reading it. He laughed as (10)____ as he could. 8 administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan One day, Mr Black came back from a party very (1) 真 的不掉线吗,,、,,,,,,,,,,,, . It was too late, and the weather was very cold. There was no bus or taxi, so he had to go home on(2) . He held his (3) under his arms. When he got home, he opened his bag.He wanted to get his keys. They were always there. But he couldn’t find the keys this time. He was worried and he didn’t know(4) to do.When he looked up, he suddenly saw his window was (5) . Smiling to himself, Mr Black thought of an(6) . 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 50 There was a ladder behind his house.He carried it to the window.Then he began to (7) up the ladder. How dark it was! It was (8) for him to do that, because he was very nervous and his hat fell down. So he was very careful. A moment later he jumped into the room and he was very happy. But suddenly when he put his hand into his (9) , he was surprised to find his(10) just right there. 9 It was a 1 day. In the morning, Lulu’s mother was busy doing some 2 . When she had everything done, she said to her son, “ It’s time to get up, my son. ” But administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan there was 3 answer. She came into the bedroom and said again, “ e 4 , my baby. Did you hear it? It’s time to get up now. ” It 5 that Lulu was still having a dream. He didn’t hear 6 his mother said. His mother came to his bed, “ Lazybones (懒虫). You see, the sun is 真的 不掉线吗,,、,,,,,,,,,,,, 7 now, but you still 8 in bed. Get up, my dear! ” Suddenly, Lulu 9 , “That’s unfair (不公平) ! The sun went to bed at six o’clock last night, but I reviewed (复 习) my lessons 10 10 o’clock. ” 10 It was a quiet midnight. There was a full (1) in the sky. Mr. Black was sleeping. Suddenly, his dog (2) barking loudly. Maybe the dog had 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 52 (3) some sound. Mr. Black was (4) up. He was very angry with the dog. He jumped out of his bed and held a shoe, went up to the window and hit the dog (5) it. The dog stopped barking at once and ran away. Mr. Black went back to rest. But, a few minutes (6) , he heard the dog making a noise under the window. He got even (7) angry than before. He jumped out of the bed and (8) up the other shoe and wanted to hit the dog again. When he went near the window, he (9) the dog looking at him and holding the shoe in its (10) . Mr. Black felt sorry for the dog. : 1 1(shoes 2(clever,bright,wise 3(called,named 4(dirty 5(clean,brush 6(unless,until,before 7(angry,unhappy 8(surprise 9(laughing,looking 10(Returned,agreed administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 真的不掉线吗,,、,,,,,,,,,,,, 2 1singing 2 show 3 famous 4 thought 5 shout 6thanked 7 fans 8 meant 9 because 10 sorry/ frustrated/embarrassed 3 1. weekend(s) 2. piano 3. positions 4. English 5. painting/drawing 6. hobbies 7. children 8. learn 9. opinion 10. play 4 1. Christmas 2. enjoyed 3. suddenly 4. reading 5. angry 6. shouted 7. left 8. without 9. right\ polite 10. others\ him 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 54 5 1. picnic 2. bike 3. arrived 4. lake 5. preparing 6. water 7. good/great/happy/nice 8. climb 9. high 10. top 6 1.sunny 2. hiking 3. rest 4. set 5. fire 6. over 7. strong 8. sleeping 9. woke 10. cow 7 1 at 2 quietly 3 laughed 4 stopped/prevented 5 asking/telling 6 sign 7 was/felt 8 idea 9 continued 10 loudly 8 1.late 2.foot 3.bag 4.what 5.open 6.idea 7.climb 8.dangerous 9.pocket 10.keys administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 9 1. sunny 2. housework/ cooking 3. no 4. on 5. seemed 6. what 7. shining 8. stay 9. said 10. till 10 1.moon 2. began 3. heard 4. woken 5. with 6. later 7. more 8. picked 9. found/saw 10. mouth 真的不掉线 吗,,、,,,,,,,,,,,, god 神 goddess 女神 emperor皇帝 empress 女皇帝,皇后, king 国王 queen 女王,王后, prince 王子 princess 公主 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 56 actor 演员 actress 女演员 waiter 饭店服务员 waitress 饭店女服务员 master 男主人 mistress 女主人 host 男主人 hostess 女主人 heir 继承人 heiress 女继承人 shepherd 牧羊人 shepherdess 牧羊女 count 伯爵 countess 女伯爵~伯爵夫人 landlord 男房东 landlady 女房东 chairman 主席 chairwoman 女主席 wizard 巫师 witch 女巫 priest 教士 priestess 女教士 administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan poet 诗人 poetess 女诗人 manager 经理 manageress 女经理 widower 鳏夫 widow 寡妇 lad 少年 lass 少女 hero 英雄 heroine 女英雄 nephew 侄子 niece 侄女 lion 狮子 lioness 母狮子 tiger 老虎 tigress 母老虎 bull 公牛 cow 母牛 horse 马 mare 母马 cock 公鸡 hen 母鸡 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 58 drake 公鸭 duck 母鸭 英语中还有一些特殊的名词~我们常可在这类名词前加一个man, woman之类的词~例如: man teacher 男教员 woman writer 女作家 boy(man)friend 男朋友 girl cousin 表姐妹 he-wolf 雄狼 she-goat 母羊 male elephant 公象 female monkey 母猴 真的不掉线吗,,、,,,,,,,,,,,, 四年级英语 administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 第一单元: 一、对应词 my ?your I ?you our?your this ? that here ?there yes?no e?go teacher?student boy?girl his?her 二、知识点 1、表示在几楼上~要用介词on~如on the first floor.在一楼。 The first表示第一的~序数词在使用时前面一定要加the,表示事物的排列顺序。 2、介绍离自己近的事物时用this is …., 介绍离自己比较远的事物时用that is…如:This is my puter. 这是我的计算机。That is your puter.那是你的计算机。 3、how many…?多少, 用来询问物品的数量有多少~后面只能跟名词的复数形式。如How many books do you have?你有多少本书, 4、当表示有一个时~名词的前面可以用a或者an.元音前用an , 辅音前用a.如 an apple 一个苹果 an orange 一个橙子 a pear 一个梨 a dog 一只狗 5、当用Is this…? Is that…?提问时~一般用肯定回答是:Yes, it is .否定是: No , it isn?t. ?哈佛大学?英语系研究~美国布什推荐。专为中小学生英语量身定做。 : 第二单元: 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 60 1、同义词: supper ===dinner 晚饭 2、say (第三人称单数)??says 3、同义句:What time is it? ===What?s the time?现在几点了, 4、Let?s …后面直接跟动词的原形。如:Let?s go! 让我们走吧: Let?s clean the classroom.让我们打扫教室吧: 5、It?s time for …后面跟名词。如: It?s time for dinner. 该吃晚饭了。 It?s time for English class. 该上英语课了。 It?s time to…后面跟动词。如:It?s time to eat dinner. 该吃晚饭了。 It?s time to have English class. 该上英语课了。 第三单元: 1、对应词: put on -- take off white?black these--those 2、特殊疑问词What colour ,什么颜色,用来问物体的颜色~回答时一定要有表示颜色的词语。如: What colour is your bag? It?s blue. 3、Who 和Whose的区别: Who 谁。用来问人是谁。如:Who is that girl? 那个女孩是谁,She is my sister.她是我的姐姐。 administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 真的不掉线吗,,、,,,,,,,,,,,, Who is that tall man?那个高个子男人是谁,He is my father.他是我的爸爸。 Whose 谁的。 用来询问物品是谁的。在回答Whose引领的问题时~如果答案有人名~要在人名的后面加 „s, 其中的?s 表示“某人的”。如:Whose shirt is this? 这是谁的衬衣, It?s Mike?s . 它是mike的。 Whose bike is blue? 谁的书包是蓝色的, My bag is blue. 我的书包是蓝色的。 4、have(第三人称单数)??has 5、pants , socks , shoes , shorts , jeans 这些单词都是成双成对出现的~所以在句子中一般都是复数形式。如: These are my shoes.这是我的鞋子。 Those are your socks. 那是你的袜子。 6、人称代词和名词性物主代词对应: 我 I 我的 my 你you 你的 your 他 he 他的his 她she 她的 her 我们 we 我们的 our 你们you 你们的 your 他们they 他们的 their 她们they 她们的 their 人称代词一般在句中用作主语。 物主代词一般后面加名词。 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 62 第四单元: 一、对应词: close?open put on?take off cold?hot warm?cool 复数形式:foot?feet (脚) 二、表示天气的几个形容词都是同是由相应的名词变化而来的~它们的对应形式是: 名词形式 形容词形式 rain 雨 rainy 下雨的 snow雪 snowy 下雪的 wind 风 windy 有风的 cloud 云 cloudy 有云的 sun 阳光 sunny 晴朗的 三、一般疑问句Can you…?的回答形式有两种~肯定回答是:Yes, I can. 否定回答是: No, I can?t. 一般疑问句Can I …? 的回答形式也有两种~肯定回答是:Yes, you can. 否定回答是: No, you can?t. 四、同义词: How about …? ===What about …? 怎么样, 五、当问某个地方的天气如何时~要用 What?s the weather like in +地名, 如:What?s the weather like in Beijing?北京的天气怎么样, administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 第五单元: 一、Can I help you ? 是一般购物时~售货员的礼貌用语。 真的不掉线吗,,、,,,,,,,,,,,, 二、How much 与How many 的区别: 1、How much 意思是多少钱,用来问物品的价格。在回答时一般要有表示价钱的单位。如: 问一件物品的价钱时用How much is …? How much is this jacket? 这件夹克衫多少钱, It?s forty-five yuan. 它是45元。 问多件物品的价钱时用How much are …? How much are these books? 这些书多少钱, They are ninety-nine yuan. 它们是99元。 2、How many 意思是多少。用来询问物品的数量有多少~后面跟名词的复数形式~回答时一般数字后面没有单位。如: How many cows do you have? 你有多少头奶牛, I have 12. 我有12头。 How many horses are there ? 那儿有多少匹马, They are 12. 有12匹。 第六单元: 一、复数形式 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 64 sheep?sheep (绵羊) hen?hens,母鸡, lamb?lambs(羊羔) goat?goats,山羊, cow?cows,奶牛, horse?horses,马, goose?geese(鹅) foot?feet(脚) tooth?teeth(牙齿) 二、可数名词变复数的规则: 1、一般情况下~在单数名词词尾加“s”.如: cat?cats dog?dogs book?books ruler?rulers 2、在以s, ss , x , sh , ch 结尾的名词后面加“es”,如: box?boxes peach?peaches bus?buses class?classes 3、在以o结尾的单词后面加“es”,如: tomato?tomatoes potato?potatoes 4、以元音字母加y结尾的名词~直接加“s”如: boy?boys toy?toys day?days 以辅音字母加y结尾的名词~去掉y后加“ies”,如: baby?babies lady?ladies butterfly?butterflies 5、以f, fe结尾的名词~去掉f或fe后加“ves”~如: shelf?shelves leaf?leaves knife?knives 三、I like…后面要加可数名词的复数形式或者不可数名词~如: I like apples . 我喜欢苹果。 I like chicken.我喜欢鸡肉。 四、特殊疑问句: What are these? What are those ? What are they?在回答时~都 administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 要用“They are…” What is this ? What is that? What is it ? 在回答时都要用It?s a (an )… 一般疑问句:Are these …? Are those …? Are they…?的回答形式也都是一样的~肯定回答:Yes, they are. 否定回答:No, they aren?t. 真的不掉线吗,,、,,,,,,,,,,,, 一般疑问句: Is this a(an) …? Is that a(an ) …? Is it a(an)…?的回答形式也都是一样的~肯定回答:Yes, it is. 否定回答:No, it isn?t. 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 66 >> 四年级英语短语 1. May I have...? Yes/Sure.Here you are. 我可以有...吗,当然。给你。 2. Happy Teachers?Day 祝教师节快乐 3. in a toy shop 在一家玩具店里 4. I see.我明白了 5. have a look 看一看 6. I?d like 我想要 7. What?s this/that? 这/那是什么, It?s a... 是... 8. on the desk在课桌上 9. In which box? 在哪只盒子里, 10. over there 在那边 11. in the classroom 在教室里 12. e here 过来 13. Let me see. 让我看看。 14. Not at all.不用谢。 15. Excuse me 对不起~打扰了 administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 16. Sorry, I don?t know.对不起~我不知道。 17. Me,too. 我也是。 18. What?s this/that in English? 这/那用英语怎么说, It?s a... 是... 19. in English 用英语 20. I like...(用复数形式) 我喜欢… 21. Do you like...? 你喜欢...吗, Yes,I do./No,I don?t.是的~我喜欢。/不~我不喜欢。. Unit 6?9 单元 1. Try this one on. 试穿这件。 2. Try this pair on. 试穿这条。 3. Whose…is this? 这是谁的…? It?s…?s. 是…的。 4. Whose…are they? 这是谁的...? They?re…?s. 是…的。 5. Don?t worry. 别担心。 6. Oh, dear! 喔~天呀: 7. get up 起床 真的不掉线吗,,、,,,,,,,,,,,, 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 68 8. have breakfast 吃早饭 9. go to school 去上学 10. have lunch 吃午饭 11. go home 回家 12. watch TV 看电视 13. go to bed 上床睡觉 14. go to the cinema 去看电影 15. What?s the time, please? 请问几点了, It?s… 16. What time do you…? 你什么时候做什么, I…at… 17. See you. 再见。 18. It?s late. 迟到了。 19. It?s time to… 是… 的时候了 20.Shall we…? 我们…~好吗, 21. What?s…and…? 几加几等于几, It?s… 是… 22. What?s the matter? 怎么了, 23. read the new words 读生词 24. boys and girls 孩子们 25. sit down 坐下 26. stand up 起立 27. do the puzzle 玩拼图 administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 28. Good night. 晚安。 29. a glass of water 一杯水 30. have some cakes 吃些蛋糕 31. Good evening. 晚上好。 32. have some soft drink 喝些饮料 PEP教材四年级英语下册知识点归纳 一、语音 1. cake snake grapes face /apple bag cat hat 2. we me we he she / egg bed desk pen 3. bike rice kite ice-cream / milk fish pig windows 4. O hole home nose rose /box fox orange lock 5. student cute music tube / umbrella toothbrush cup bus 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 70 二、词汇 (一)四会单词 1、puter board fan light / this is my that your teacher?s desk picture wall floor / yes it 2、one two three four five six seven eight nine ten Math Chinese English P.E. music / what time it?s=it is o?clock for class 真的不掉线吗,,、,,,,,,,,,,,, 3、jacket shirt skirt dress T-shirt red blue yellow green white / no not colour 4、warm cold cool snowy sunny / today Jeans pants socks shoes / let?s=let us play football 5、big small long short / how much apple banana pear orange watermelon / are they 6、horse cat rabbit pig duck dog eleven twelve thirteen fifteen twenty / how many there aren?t=are not (二)听、说、认读词汇 1、playground / garden / teacher?s office / library / canteen Wele to our many class at please art room / puter room / washroom / music room / gym / TV room administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 2、lunch English class music class breakfast dinner P.E. class Get up go to school go home go to bed ready 3、weater shorts so they?re=they are 4、hot weather rainy windy cloudy hello hi bye 5 、 colourful pretty cheap expensive help sneakers slippers sandals boots For all right them 6、sheep hen lamb goat cow fat tomato cucumber potato onion carrot 三、句型 (一)Let's learn部分 1、Where is the canteen? It?s on the first 。 Where is the art room? It's on the second floor. 2、What time is it ? It's nine o'clock. It's time for English class . It's time to go to school. 3、I like the white sweater with the green skirt. I like the blue dress. 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 72 Where are my socks? What colour? White. 4、This is the weather report. It?s cool in Lhasa . Here's the world weather . It?s rainy in London. 5、Look at that dress. It's pretty. Yes.It is . Can I help you? Yes.I want a pair of sneakers. 6、What are they? They are goat. ,二,Let's talk部分 1、Wele to our school! This is the teacher's office. How many students are there in your class? Forty-five. Do you have a library? Yes. This way ,please. Is this the library? Yes, it is. Is that the art room? No,it isn't. Your school is beautiful /cool. 2、School is over. Let's go to the playground. OK. Let's run. Hurry. It's time to get up. Breakfast is ready! It's time for English. I'm ready. 真的不掉线吗,,、,,,,,,,,,,,, 3、 Whose is this ? It's your baby brother's. Where are they? These are your baby pants. Wow! They're so small. ] Our neighbour has a new baby. administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 4、 Can I wear my new shirt today? No,you can't. It's cold. What are you doing? Not much. What?s the weather like in Beijing? It?s snowy today. What's the matter? It's windy now. I have to close the window. 5、 Look at that dress. It's colourful. It's very pretty. Can I help you? Yes ,please. What size? Size five. How much is this dress ? It's eighty-five yuan. We'll take it. Oh,that's too expensive. Are they all right? Yes ,they are. 6、Oh, this farm is so big. Are they sheep/horses/donkeys? No, they aren?t. How many cows do you have? I don?t know./One hundred. Are these tomatoes? Yes, they are. /No,they aren't. Are those potatoes? Yes, they are. /No,they aren't. What are they? They're onions. Are those cucumbers? Yes, they are. (三)Read and write部分 1、This is my puter. That is your puter. Is this a teacher's desk . Yes ,it is . 2、What time is it ? It's two o'clock. 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 74 It's It?s time for math class. 3、Is this your T-shirt? No,it's not. What colour is it ? It's white. 4、 It's warm today. Let's play football. It's cool. Is it cold? 5、 How much is it ? It's ten yuan. How much are they? They?re three yuan. 6、 Are they ducks? No, they aren?t. How many horses are there? Twelve. PEP四年级下(第四册)各单元句型总汇 第一单元 Where is the canteen? It?s on the first floor. administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan Wele to our school! How many students are there in your class? Do you have a library? Do you have lunch at school? The canteen is on the first floor. This way, please. Your school is beautiful. We have a new puter room. 真的不掉线吗,,、,,,,,,,,,,,, Let?s go there. I like this one. Is this the library? Yes,it is. Is that the art room? No,it isn?t. What?s on it? Let?s go and have a look. 四会句型: This is my puter. That is your puter. Is this a teacher?s desk? 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 76 Yes,it is. 第二单元 It?s time for English class. School is over. Let?s go to the …. Let?s go home. Just a minute. Let?s run. That one is correct. It?s time to go to school. Breakfast is ready! I?m ready! Look at my clock. It?s nice. Can I have a try? 四会句型: What time is it? It?s two o?clock.. It?s 9:45. It?s time for math class. 第三单元 administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan I like the white sweater with the green skirt. Where is my skirt? Whose is it? It?s my T-shirt. Whose is this? It?s your baby brother?s! 真的不掉线吗,,、,,,,,,,,,,,, So many colours! Please pass me my T-shirt. My T-shirt is red. This small one? Where are my socks? Look at these. What are they? These are your baby pants. They?re so small. But what for? Our neighbour has a new baby! Hurry up! This red T-shirt is pretty! 四会句型: 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 78 Is this your skirt? No,it?s not. What colour is it? It?s white. 第四单元 This is the weather report. It?s cool in Lhasa. Can I wear my new shirt today? No,you can?t. e on . Those are my shoes. Where are they ? They are on your feet? Here?s the world weather. What are you doing? What?s the weather like in Beijing? Not much. It?s rainy today. How about New York? What?s the matter? I have to close the window. 四会句型: administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan It?s warm today. It?s cool Let?s play football. Is it cold? 真的不掉线吗,,、,,,,,,,,,,,, ?哈佛大学?英语系研究~美国布什推荐。专为中小学生英 语量身定做。 : 第五单元 Look at that dress. It?s colourful. Can I help you? That?s expensive. 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 80 I like it. This shirt is colourful,but it?s too big. It?s fits me well. I want a pair of sneakers. What size,Size five. How about this pair? Are they nice/all right? We?ll take them. 四会句型: How much is it? It?s ten yuan. How much are they? They?re three yuan. 第六单元 How many cows do you have? What do you see in the picture? What are those? How many geese can you see? Are these tomatoes? 四会句型: administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan Are they ducks? No,they aren?t. How many horses are there? Twelve. 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 82 真的不掉线吗,,、,,,,,,,,,,,, 四年级下册单词、句型集中营 Words in Book 4 Class________ Name______ Number_______ playground garden teacher?s office library canteen art room gym puter room washroom music room floor visitor there TV room first class lunch this way please cool beautiful second puter board fan light this is my administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan that your teacher?s desk wall picture floor breakfast English class music class lunch it dinner P.E. class get up yes go to school go home go to bed just a minute over go to the playground now run one kid two three four five six seven eight nine ten what time it?s=it is o?clock English P.E. hurry Chinese music for class jacket shirt skirt dress red 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 84 sweater T-shirt whose green white blue yellow not jeans pants no socks shoes shorts these those but what for neighbour colour warm cold cool hot weather report weather wear today can?t=cannot put on jeans pants socks shoes football let?s=let us play snowy cloudy sunny rainy windy New York matter close not much have to pretty cheap expensive administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan colourful sixty seventy hundred assistant how much ninety-nine big take apple small long short orange watermelon pear banana are they sneakers slippers sandals boots want pair we?ll=we will a pair of son size horse hen lamb sheep goat cow farm aren?t=are not donkey fat cat rabbit tomato pig duck dog onion carrot 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 86 cucumber potato eleven twelve thirteen fresh fifteen twenty how many there 重难点句子Sentences in Book 4 Class_________ Name________ Number________ 1. Where is the canteen? It?s on the first floor. 真的不掉线吗,,、,,,,,,,,,,,, 2. This is the teacher?s office. That is my classroom. 3. How many students are there in your class? Forty-five. administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 4. Do you have a library? Yes! 5. The canteen is on the first floor. 6. This is my puter. That is your puter. 7. Is this a teacher?s desk? Yes, it is.\No, it isn?t. 8. Is that the art room? Yes, it is.\No, it isn?t. 9. What time is it? It?s nine o?clock. 10. It?s time for English class. Breakfast is ready! 11. School is over. Let?s go to the playground. 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 88 12. Let?s go home. I?m ready. 13. It?s 7:05. It?s time to go to school. 14. It?s 8:30 .It?s time for music class. 15. I like the white sweater with the green skirt. 16. I like the blue dress. 17. Where is my skirt? 18. What colour is it? Blue. 19. Is this your skirt? Yes, it is./No. it isn?t. My T-shirt is red. 20. Is that your T-shirt? No, it?s not. administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 21. Whose is it? It?s my T—shirt. 22. Whose is this? It?s your baby brother?s! 23. What are they? These are your baby pants. They?re so small. 24. Are those my shoes? Yes. But what for? 25. Our neighbour has a new baby! 26. This is the weather report. It?s cool in Lhasa. 27. Can I wear my new shirt today? No, you can?t. /Yes, you can. 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 90 28. It?s warm today. You can wear your new shirt. 29. Can I wear my T-shirt? Yes, you can. 30. What are you doing? Not much. 31. What?s the weather like in Beijing? It?s rainy today. 32. How about New York? It?s sunny. 33. What?s the matter? 34. It?s windy now. I have to close the window. 35. Look at that dress. It?s colorful. It?s very pretty. administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 36. Can I help you? Yes. 37. How much is this dress? It?s ninety-nine Yuan. 38. What size? Size five. 39. Are they all right? Yes, they are. 40. How much are they? They?re thirty-five Yuan. 41. What are they? They are goats. 42. Are they sheep? No, they aren?t. They are goats. 43. Are they horses? No, they aren?t .They are donkeys. 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 92 真的不掉线吗,,、,,,,,,,,,,,, 44. Look at the hens. They are fat. 45. How many cows do you have? One hundred. 46. What do you see in the picture? I see five cats. 47. Are these tomatoes? Yes, they are. /No, they aren?t. 48. What are these? They are carrots. 连词成句 1. is, my, this, puter (.) 2. your, is, that, puter (.) administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 3. teacher?s desk, this, is, a (?) 4. is, it, time, what (?) 5. o?clock, it?s, two (.) 6. time, math, for, it?s, class (.) 7. this, is, your, T-shirt (?) 8. colour, it, is, what (?) 9. warm, it?s, today (.) 10. play, let?s, football (.) 11. much, how, it, is (?) 12. yuan, it?s, ten (.) 13. they, much, how, are (?) 14. three, they, yuan, are (.) 15. they, ducks, are (?) 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 94 16. many, horses, there, are, how (?) administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 四年级下册英语知识点 Unit 1 Our school 一、句子: 1、This is the teacher?s office.这是老师办公室。 2、That is my classroom.那是我的教室。 3、Go to the library. Read a story-book..去图书馆。读故事书。 4、Is this the library? Yes, it is.这是图书馆吗,是的。 5、Is that the art room? No, it isn?t. the art room is on the second floor.,on the third; on the 4th; on the 5th……., 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 96 那是美术室吗,不是~美术室在二楼。(三楼、四楼、五楼……) 6、Where is the canteen? It?s on the first floor. ,on the third; on the 4th; on the 5th…….,食堂在哪里,在一楼。(三楼、四楼、五楼……) 7、How many students are there in you class? Forty.(数字) 8、Let?s go and have a look! 让我们去看一看。 9、 二、单词: playground garden library canteen artroom light picture board 真的不掉线吗,,、,,,,,,,,,,,, administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan teacher?s office puter room washroom music room gym TV room teacher?s desk wall floor your puter fan this way please Unit 2 What time is it? 一、句子: 1、What time is it? 几点钟了, 2、It?s nine o?clock.现在九点。 3、It?s time for English class.该上英语课了。,lunch English class music class breakfast dinner P.E class, 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 98 4、School is over. Let?s go to the playground.放学了~让我们去操场吧: 5、It?s time to go to school.该去学校了:, get up go to school go to bed go home , 6、 Where is the short hand? 7、That one is correct 二、单词:lunch English class music class breakfast dinner P.E class get up go to school go to bed go home just a minute one two three four five six seven eight nine ten it?s=it is math Chinese English P.E music class Unit 3 Is this your skirt? 一、句子: administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 1、I like the white sweater with the green skirt.我喜欢白毛衣搭配绿裙子。 2、Whose is this? It?s my baby brother?s.这是谁的,是我小弟弟的。 3、Is this your T-shirt? No, it?s not.这是你的T恤衫吗,不是。 4、Where are my socks? 我的袜子在哪儿, 5、What colour is it? It?s white.它是什么颜色的,白色的。 二、单词:sweater jeans pants socks shoes shorts jacket shirt skirt dress T-shirt red blue yellow green white colour 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 100 Unit 4 It?s warm today 一、句子: 1、This is the weather report. 这是天气预报。 2、It?s cool in Lhasa. 拉萨天气凉爽。 3、What?s the weather like in Beijing? It?s rainy.北京天气怎样,下雨。 4、Can I wear my shirt today? Yes, you can./ No, you can?t.我今天能穿衬衫吗,能/不能。 5、What?s the matter?你有什么事情, 6、It?s warm today今天天气暖和。 7、Where are my shoes? 我的鞋子在哪里, administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 8、Those are my shoes.那些是我的鞋子。 9、they are on you feet.他们在你的脚上。 10、I have to close the window.我不得不关上窗户。 二、单词:hot the weather report the word report rainy windy cloudy warm cold cool today jeans pants socks shoes let?s=let 真的不掉线吗,,、,,,,,,,,,,,, us play football snowy sunny not much Unit 5 How much is it? 1、Look at that dress. It?s pretty。看那条裙子~真漂亮: 2、Can I help you? 需要我为你做些什么吗, 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 102 3、I want a pair of sneakers.我想要一双球鞋。 4、How much is it? It?s ninety-nine yuan.多少钱,九十九元。 5、That?s expensive.好贵阿: 6、A pair of sneakers for my son. 给我儿子买双球鞋。 7、What size? Size five. 几码,五码: 8、Are they all right? 合适吗, 9、We?ll take it.我们买下了: 10、How much are they? They?re three yuan.他们多少钱,三元。 11、It fits me well.它很适合我。 administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 二、单词: colourful pretty expensive sneakers slippers sandals boots big small long short apple banana pear orange watermelon cheap all right a pair of Unit 6 At a farm 一、句子: 1、What are they? They are goats.,必须加S,它们是什么,它们是山羊。 2、This farm is so big.这个农场好大阿: 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 104 3、Are they ducks? No, they aren?t.它们是鸭子吗,不是的。 4、Look at the cucumbers. They?re fresh.看那些黄瓜~他们好新鲜: 5、I like tomatoes. They are juicy.我喜欢番茄~他们很多汁。 6、I don?t like onions. They?re smelly.我不喜欢洋葱~他们有股味道。 7、How many horses ,必须是复数,are there? Twelve. 那儿有多少马,十二匹。 8、How many sheep(单复数相同)are there?这里有多少只绵羊, 9、How many geese(goose 的复数形式)can you see?你能看到多少只鹅, administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan 二、单词: sheep hen lamb goat cow tomato cucumber potato onion carrot horse aren?t=are not cat rabbit pig duck dog eleven twelve thirteen fifteen twenty how many there ?哈佛大学?英语系研究~美国布什推荐。专为中小学生英语量身定做。 : 真的不掉线吗,,、,,,,,,,,,,,, 98 compressor, fan-for 5 GB502752009 mechanical equipment installation engineering construction and acceptance specification -1997 steel welded atmospheric pressure vessel 4 GB50231-l steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T47352005 vertical cylindrica-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-02000 8 JB473-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-equipment 4 HGJ222 2002 industrial pipe welding engineering code for construction and acceptance of field-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-t joints, welding engineering2005 steel fusion welded but-ndis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323ttempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis muta1000 punishment. (5) significant near miss should be a-administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500 106
/
本文档为【辽师大版快乐英语小学五年级下学期期末考试模拟试题1】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索