为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

30套书房样板间和房子装修流程

2017-10-17 50页 doc 1MB 11阅读

用户头像

is_882336

暂无简介

举报
30套书房样板间和房子装修流程30套书房样板间和房子装修流程 ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4...
30套书房样板间和房子装修流程
30套书房样板间和房子装修 ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with ready-mixed concrete manufacturers to sign quality guarantees. (3) using hot water mix, hot water temperature does not exceed 60 c to ensure concrete machine up to a temperature of 15~20?, casting temperature is greater than 5 degrees centigrade. (4) strict control of mixing concrete admixture admixture of cement and concrete, mixing time stirring at room temperature time of 1.5 times. 2 transport ready-mixed concrete trucks, concrete must be coated in transport insulation to prevent heat loss. To shorten the transport time to ensure concrete pouring temperature not lower than 10 degrees Celsius. 3, the pouring of concrete (1) before concrete pouring, clearing snow and ice on the template and steel and dirt. (2) using concrete pumps (HBT-80) for the vertical transportation, fire-retardant thermal insulation for concrete pump pipe wrap, to prevent heat loss, to ensure that the concrete into the mold temperature of not less than 5 degrees centigrade. (3) concrete not subjected to impact loading not fully cooled. 4, concrete curing concrete curing: concrete curing comprehensive thermal storage method is used. (1) wall of concrete curing: release time after flame-resistant quilt cover and press up or down to prevent wind, according to the thermal calculation to determine the thickness of the insulation is. (2) curing concrete roof: roof after the concrete has been poured, the surface covered with
/
本文档为【30套书房样板间和房子装修流程】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索