为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

英文名字 女孩

2017-09-29 8页 doc 31KB 43阅读

用户头像

is_531654

暂无简介

举报
英文名字 女孩英文名字 女孩 Eve 伊芙……生命 赋予生命者生灵之母 令人愉快的人 Evelyn 伊芙琳……生命 易相处的人 Faithe 费滋……忠实可信的人 Fanny 梵妮……自由之人 Fay 费怡……忠贞或忠诚 小仙女 花之神 Flora 弗罗拉……花 Florence 弗罗伦丝……开花的 美丽的 Frances 法兰西斯……自由之人 无拘束的人 Freda 弗莉达……和平 领导者 Frederica 菲蕾德翠卡……和平的领导者 Gabrielle 嘉比里拉……上帝就是力量 medium above the...
英文名字 女孩
英文名字 女孩 Eve 伊芙……生命 赋予生命者生灵之母 令人愉快的人 Evelyn 伊芙琳……生命 易相处的人 Faithe 费滋……忠实可信的人 Fanny 梵妮……自由之人 Fay 费怡……忠贞或忠诚 小仙女 花之神 Flora 弗罗拉……花 Florence 弗罗伦丝……开花的 美丽的 Frances 法兰西斯……自由之人 无拘束的人 Freda 弗莉达……和平 领导者 Frederica 菲蕾德翠卡……和平的领导者 Gabrielle 嘉比里拉……上帝就是力量 medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high Gail 盖尔……快乐的 唱歌 峡谷 Gemma 姬玛……宝石 Genevieve 珍妮芙……金发碧眼的人 白种人 Georgia 乔治亚……农夫 Geraldine 娇拉汀……强而有力的长矛 Gill 姬儿……少女 Gladys 葛莱蒂丝……公主 Gloria 葛罗瑞亚……荣耀者 光荣者 Grace 葛瑞丝……优雅的 Griselda 葛莉谢尔达……指对丈夫极顺从和忍耐的女人 Gustave 葛佳丝塔芙……瑞典 战争 medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high Gwendolyn 关德琳……白色眉毛的 Hannah 汉娜……优雅的 Harriet 哈莉特……家庭主妇 Hazel 海柔尔……领袖 指挥官 Hedda 赫达……斗争 战斗 Hedy 赫蒂……甜蜜 令人欣赏的 光亮的 Helen 海伦……火把 Heloise 海洛伊丝……健全的 在战场上很出名 Hermosa 何蒙莎……美丽 Hilda 希尔达……战斗 女战士 Hilary 希拉瑞莉……快乐的 Honey 汉妮……亲爱的人 medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high Hulda 胡达……优雅 被大众深深喜爱的 Ida 艾达……快乐的 勤奋的 富有的 Ina 艾娜……母亲 Ingrid 英格丽……女儿 可爱的人 Irene 艾琳……和平 和平女神 Iris 爱莉丝……彩虹女神 鸢尾花 Irma 艾尔玛……地位很高的 高贵的 Isabel 伊莎蓓尔……上帝的誓约 Ivy 艾薇……希腊传说中的神圣食物 Jacqueline 贾桂琳……愿上帝保护 Jamie 婕咪……取而代之者 Jane 珍……上帝是慈悲的 少女 medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high Janet 珍妮特……少女 上帝的恩赐 Janice 珍尼丝……少女 上帝是仁慈的 Jean 琴……上帝是慈悲的 Jennifer 珍尼佛……白色的波 施魔法 妖艳 迷人的女人 太神奇了 Jenny 珍妮……少女 Jessie 婕西……上帝的恩宠 财富 Jessica 杰西嘉……上帝的恩宠 财富 Jill 姬儿……少女 恋人 Jo 乔……恋人 Joan 琼……上帝仁慈的赠礼 Joanna 乔安娜……上帝仁慈的赠礼 medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high
/
本文档为【英文名字 女孩】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索