苏打粉的功效与作用
苏打粉功效与作用
苏打粉的作用:
苏打粉又叫膨大剂、小苏打、梳打粉、重曹、碳酸氢钠,苏打粉可以药用治疗胃酸过多,苏打粉可以焙制糕点,内服后能迅速中和胃酸,适用于胃酸过多、消化不良及碱化尿液等。
苏打粉的作用
性状:为白色结晶性粉末;无臭,味咸;在潮湿空气中即缓缓分解,水溶液放置稍久,或振摇,或加热,碱性即增加。溶于水,不溶于乙醇。
作用:本品为弱碱,内服后能迅速中和胃酸,其抗酸作用弱而短暂。此外尚有碱化液的作用。适用于胃酸过多、消化不良及碱化尿液等;静脉给药用于酸中毒;外用滴耳软化盯聍;2%溶液坐浴用于霉菌性阴道炎。
用法与用量:口服:每次0.3—2g,每日0.9—6g;小儿每次0(1(1(0g,每日3次。
碳酸氢钠有弱碱性,为吸收性抗酸药。内服后,能迅速中和胃酸,作用迅速,且维持短暂,并有产生二氧化碳等多种缺点。作为抗酸药不宜单用,常与碳酸钙或氧化镁等一起组成西比氏散用。此外,本品能碱化尿液,与碘胺药同服,以防磺胺在尿中结晶析出;与链霉素合用可增强泌尿道抗菌作用。静脉给药用经纠正酸血症。用5%100-200毫升滴注,小儿每公斤体重5毫升。妇科用于霉菌性阴道炎,用2%-4%溶液坐浴,每晚一次,每次500-1000毫升,连用7日。外用滴耳剂软25Cr-13Ni type or a welding material with high nickel content. Low temperature steels, austenitic stainless steel and heat-resistant corrosion-resistant high alloy steels and austenitic and non-austenite dissimilar steel welded joints shall comply with the following requirements: to ensure penetration and fusion under good conditions, low current, short-arc, welding speed and much faster welding process and interpass temperature should be controlled. High corrosion resistance performance of double-sided welded welds, welded layer in contact with corrosive media finally welded. Low temperature steel welding, suitable for the surface of the weld bead annealing. Check 6.6.1 6.6 welding inspection before welding material and welding materials, must be carried out according to standard acceptance, unqualified persons may be used. Group before the dimensions of various parts of the main structure, Groove sizes, and grooved surface for inspection. Welding Groove and Groove on both sides should be checked before the cleaning quality. Check the welding before welding conditions are consistent with the prescribed conditions, and welding equipment. The drying and cleaning of welding materials to confirm that it meets the requirements. 6.6.2 intermediate welding inspection tack welding after the skull should be cleared checks to welding the defects found shall be removed before they can. Multi-layer welding welding after the each floor should immediately clean the layers, and Visual inspection, found defects in welded to eliminate before they can proceed to the next level. To interrupt the welding seam, should be cleaned and checked before continuing to weld to eliminate welding defects found by the rear. 6.6.3 check after welding seams shall be welded ends immediately after the removal of slag skin, splash, clean weld and weld inspection. Profiles should shape forming beautiful, not undercut, cracked, incomplete fusion, blowhole, slag, splash and other defects. Weld reinforcement should
化盯聍(3%溶液滴耳,每日3-4次)。注射剂:10毫升支含药0.5克;100毫升支含药5克。本药品在非处方药中,仅为片剂和滴剂。
苏打粉可能作为分析试剂、有机合成、制药(治疗胃酸过多)、发酵剂(焙制糕点)、灭火剂(泡沫或干粉)。
注意事项:
1、苏打粉内服时产生大量的二氧化碳气体,增加胃内压力,对胃溃疡的病人,刺激溃疡面,甚至有产生胃穿孔的危险,同时二氧化碳刺激胃粘膜,引起继发性胃酸分泌过多。苏打粉用量过大可致碱中毒。
2、可能产生穿孔的溃疡病患者忌用苏打粉;苏打粉忌与酸性药物配伍。
sudafen
25Cr-13Ni type or a welding material with high nickel content. Low temperature steels, austenitic stainless steel and heat-resistant corrosion-resistant high alloy steels and austenitic and non-austenite dissimilar steel welded joints shall comply with the following requirements: to ensure penetration and fusion under good conditions, low current, short-arc, welding speed and much faster welding process and interpass temperature should be controlled. High corrosion resistance performance of double-sided welded welds, welded layer in contact with corrosive media finally welded. Low temperature steel welding, suitable for the surface of the weld bead annealing. Check 6.6.1 6.6 welding inspection before welding material and welding materials, must be carried out according to standard acceptance, unqualified persons may be used. Group before the dimensions of various parts of the main structure, Groove sizes, and grooved surface for inspection. Welding Groove and Groove on both sides should be checked before the cleaning quality. Check the welding before welding conditions are consistent with the prescribed conditions, and welding equipment. The drying and cleaning of welding materials to confirm that it meets the requirements. 6.6.2 intermediate welding inspection tack welding after the skull should be cleared checks to welding the defects found shall be removed before they can. Multi-layer welding welding after the each floor should immediately clean the layers, and Visual inspection, found defects in welded to eliminate before they can proceed to the next level. To interrupt the welding seam, should be cleaned and checked before continuing to weld to eliminate welding defects found by the rear. 6.6.3 check after welding seams shall be welded ends immediately after the removal of slag skin, splash, clean weld and weld inspection. Profiles should shape forming beautiful, not undercut, cracked, incomplete fusion, blowhole, slag, splash and other defects. Weld reinforcement should
25Cr-13Ni type or a welding material with high nickel content. Low temperature steels, austenitic stainless steel and heat-resistant corrosion-resistant high alloy steels and austenitic and non-austenite dissimilar steel welded joints shall comply with the following requirements: to ensure penetration and fusion under good conditions, low current, short-arc, welding speed and much faster welding process and interpass temperature should be controlled. High corrosion resistance performance of double-sided welded welds, welded layer in contact with corrosive media finally welded. Low temperature steel welding, suitable for the surface of the weld bead annealing. Check 6.6.1 6.6 welding inspection before welding material and welding materials, must be carried out according to standard acceptance, unqualified persons may be used. Group before the dimensions of various parts of the main structure, Groove sizes, and grooved surface for inspection. Welding Groove and Groove on both sides should be checked before the cleaning quality. Check the welding before welding conditions are consistent with the prescribed conditions, and welding equipment. The drying and cleaning of welding materials to confirm that it meets the requirements. 6.6.2 intermediate welding inspection tack welding after the skull should be cleared checks to welding the defects found shall be removed before they can. Multi-layer welding welding after the each floor should immediately clean the layers, and Visual inspection, found defects in welded to eliminate before they can proceed to the next level. To interrupt the welding seam, should be cleaned and checked before continuing to weld to eliminate welding defects found by the rear. 6.6.3 check after welding seams shall be welded ends immediately after the removal of slag skin, splash, clean weld and weld inspection. Profiles should shape forming beautiful, not undercut, cracked, incomplete fusion, blowhole, slag, splash and other defects. Weld reinforcement should
生甘草的功效与作用
25Cr-13Ni type or a welding material with high nickel content. Low temperature steels, austenitic stainless steel and heat-resistant corrosion-resistant high alloy steels and austenitic and non-austenite dissimilar steel welded joints shall comply with the following requirements: to ensure penetration and fusion under good conditions, low current, short-arc, welding speed and much faster welding process and interpass temperature should be controlled. High corrosion resistance performance of double-sided welded welds, welded layer in contact with corrosive media finally welded. Low temperature steel welding, suitable for the surface of the weld bead annealing. Check 6.6.1 6.6 welding inspection before welding material and welding materials, must be carried out according to standard acceptance, unqualified persons may be used. Group before the dimensions of various parts of the main structure, Groove sizes, and grooved surface for inspection. Welding Groove and Groove on both sides should be checked before the cleaning quality. Check the welding before welding conditions are consistent with the prescribed conditions, and welding equipment. The drying and cleaning of welding materials to confirm that it meets the requirements. 6.6.2 intermediate welding inspection tack welding after the skull should be cleared checks to welding the defects found shall be removed before they can. Multi-layer welding welding after the each floor should immediately clean the layers, and Visual inspection, found defects in welded to eliminate before they can proceed to the next level. To interrupt the welding seam, should be cleaned and checked before continuing to weld to eliminate welding defects found by the rear. 6.6.3 check after welding seams shall be welded ends immediately after the removal of slag skin, splash, clean weld and weld inspection. Profiles should shape forming beautiful, not undercut, cracked, incomplete fusion, blowhole, slag, splash and other defects. Weld reinforcement should
25Cr-13Ni type or a welding material with high nickel content. Low temperature steels, austenitic stainless steel and heat-resistant corrosion-resistant high alloy steels and austenitic and non-austenite dissimilar steel welded joints shall comply with the following requirements: to ensure penetration and fusion under good conditions, low current, short-arc, welding speed and much faster welding process and interpass temperature should be controlled. High corrosion resistance performance of double-sided welded welds, welded layer in contact with corrosive media finally welded. Low temperature steel welding, suitable for the surface of the weld bead annealing. Check 6.6.1 6.6 welding inspection before welding material and welding materials, must be carried out according to standard acceptance, unqualified persons may be used. Group before the dimensions of various parts of the main structure, Groove sizes, and grooved surface for inspection. Welding Groove and Groove on both sides should be checked before the cleaning quality. Check the welding before welding conditions are consistent with the prescribed conditions, and welding equipment. The drying and cleaning of welding materials to confirm that it meets the requirements. 6.6.2 intermediate welding inspection tack welding after the skull should be cleared checks to welding the defects found shall be removed before they can. Multi-layer welding welding after the each floor should immediately clean the layers, and Visual inspection, found defects in welded to eliminate before they can proceed to the next level. To interrupt the welding seam, should be cleaned and checked before continuing to weld to eliminate welding defects found by the rear. 6.6.3 check after welding seams shall be welded ends immediately after the removal of slag skin, splash, clean weld and weld inspection. Profiles should shape forming beautiful, not undercut, cracked, incomplete fusion, blowhole, slag, splash and other defects. Weld reinforcement should
25Cr-13Ni type or a welding material with high nickel content. Low temperature steels, austenitic stainless steel and heat-resistant corrosion-resistant high alloy steels and austenitic and non-austenite dissimilar steel welded joints shall comply with the following requirements: to ensure penetration and fusion under good conditions, low current, short-arc, welding speed and much faster welding process and interpass temperature should be controlled. High corrosion resistance performance of double-sided welded welds, welded layer in contact with corrosive media finally welded. Low temperature steel welding, suitable for the surface of the weld bead annealing. Check 6.6.1 6.6 welding inspection before welding material and welding materials, must be carried out according to standard acceptance, unqualified persons may be used. Group before the dimensions of various parts of the main structure, Groove sizes, and grooved surface for inspection. Welding Groove and Groove on both sides should be checked before the cleaning quality. Check the welding before welding conditions are consistent with the prescribed conditions, and welding equipment. The drying and cleaning of welding materials to confirm that it meets the requirements. 6.6.2 intermediate welding inspection tack welding after the skull should be cleared checks to welding the defects found shall be removed before they can. Multi-layer welding welding after the each floor should immediately clean the layers, and Visual inspection, found defects in welded to eliminate before they can proceed to the next level. To interrupt the welding seam, should be cleaned and checked before continuing to weld to eliminate welding defects found by the rear. 6.6.3 check after welding seams shall be welded ends immediately after the removal of slag skin, splash, clean weld and weld inspection. Profiles should shape forming beautiful, not undercut, cracked, incomplete fusion, blowhole, slag, splash and other defects. Weld reinforcement should
25Cr-13Ni type or a welding material with high nickel content. Low temperature steels, austenitic stainless steel and heat-resistant corrosion-resistant high alloy steels and austenitic and non-austenite dissimilar steel welded joints shall comply with the following requirements: to ensure penetration and fusion under good conditions, low current, short-arc, welding speed and much faster welding process and interpass temperature should be controlled. High corrosion resistance performance of double-sided welded welds, welded layer in contact with corrosive media finally welded. Low temperature steel welding, suitable for the surface of the weld bead annealing. Check 6.6.1 6.6 welding inspection before welding material and welding materials, must be carried out according to standard acceptance, unqualified persons may be used. Group before the dimensions of various parts of the main structure, Groove sizes, and grooved surface for inspection. Welding Groove and Groove on both sides should be checked before the cleaning quality. Check the welding before welding conditions are consistent with the prescribed conditions, and welding equipment. The drying and cleaning of welding materials to confirm that it meets the requirements. 6.6.2 intermediate welding inspection tack welding after the skull should be cleared checks to welding the defects found shall be removed before they can. Multi-layer welding welding after the each floor should immediately clean the layers, and Visual inspection, found defects in welded to eliminate before they can proceed to the next level. To interrupt the welding seam, should be cleaned and checked before continuing to weld to eliminate welding defects found by the rear. 6.6.3 check after welding seams shall be welded ends immediately after the removal of slag skin, splash, clean weld and weld inspection. Profiles should shape forming beautiful, not undercut, cracked, incomplete fusion, blowhole, slag, splash and other defects. Weld reinforcement should