为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

著名景点,世界

2018-01-10 11页 doc 38KB 27阅读

用户头像

is_594886

暂无简介

举报
著名景点,世界著名景点,世界 世界著名景点名称中英对照 The Himalayas喜马拉雅山 Great Wall, China中国长城 Forbidden City, Beijing, China北京故宫 Mount Fuji, Japan日本富士山 Taj Mahal, India印度泰姬陵 Angkor Wat, Cambodia柬埔寨吴哥窟 Bali, Indonesia印度尼西亚巴厘岛 Borobudur, Indonesia印度尼西亚波罗浮屠 Sentosa, Singapore新加坡圣淘沙 Crocodi...
著名景点,世界
著名景点,世界 世界著名景点名称中英对照 The Himalayas喜马拉雅山 Great Wall, China中国长城 Forbidden City, Beijing, China北京故宫 Mount Fuji, Japan日本富士山 Taj Mahal, India印度泰姬陵 Angkor Wat, Cambodia柬埔寨吴哥窟 Bali, Indonesia印度尼西亚巴厘岛 Borobudur, Indonesia印度尼西亚波罗浮屠 Sentosa, Singapore新加坡圣淘沙 Crocodile Farm, Thailand泰国北榄鳄鱼湖 Pattaya Beach, Thailand泰国芭堤雅海滩 Babylon, Iraq伊拉克巴比伦遗迹 Mosque of St, Sophia in Istanbul (Constantinople), Turkey土耳其圣索非亚教堂 Africa非洲 Suez Canal, Egypt印度苏伊士运河 Aswan High Dam, Egypt印度阿斯旺水坝 Nairobi National Park, Kenya肯尼亚内罗毕国家公园 Cape of Good Hope, South Africa南非好望角 Sahara Desert撒哈拉大沙漠 Pyramids, Egypt埃及金字塔 The Nile, Egypt埃及尼罗河 Oceania大洋洲 medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high Great Barrier Reef大堡礁 Sydney Opera House, Australia悉尼歌剧院 Ayers Rock艾尔斯巨石 Mount Cook库克山 Easter Island复活节岛 Europe欧洲 Notre Dame de Paris, France法国巴黎圣母院 Effiel Tower, France法国艾菲尔铁塔 Arch of Triumph, France法国凯旋门 Elysee Palace, France法国爱丽舍宫 Louvre, France法国卢浮宫 Kolner Dom, Koln, Germany德国科隆大教堂 Leaning Tower of Pisa, Italy意大利比萨斜塔 Colosseum in Rome, Italy意大利古罗马圆形剧场 Venice, Italy意大利威尼斯 Parthenon, Greece希腊巴台农神庙 Red Square in Moscow, Russia莫斯科红场 Big Ben in London, England英国伦敦大笨钟 Buckingham Palace, England白金汉宫 Hyde Park, England英国海德公园 London Tower Bridge, England伦敦塔桥 Westminster Abbey, England威斯敏斯特大教堂 medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high Monte Carlo, Monaco摩洛哥蒙特卡罗 The Mediterranean地中海 The Americas美洲 Niagara Falls, New York State, USA美国尼亚加拉大瀑布 Bermuda百慕大 Honolulu[,h?n?'lu:lu:], Hawaii, USA美国夏威夷火奴鲁鲁 Panama Canal巴拿马大运河 Yellowstone National Park, USA美国黄石国家公园 Statue of Liberty, New York City, USA美国纽约自由女神像 Times Square, New York City, USA美国纽约时代广场 The White House, Washington DC., USA美国华盛顿白宫 World Trade Center, New York City, USA美国纽约世界贸易中心 Central Park, New York City, USA美国纽约中央公园 Yosemite National Park, USA美国尤塞米提国家公园 Grand Canyon['kænj?n], Arizona, USA美国亚利桑那州大峡谷 Hollywood, California, USA美国加利佛尼亚好莱坞 Disneyland, California, USA加利佛尼亚迪斯尼乐园 Las Vegas, Nevada, USA美国内华达拉斯威加斯 Miami, Florida, USA美国佛罗里达迈阿密 Metropolitan Museum of Art, New York City, USA纽约大都会艺术博物馆 Acapulco, Mexico墨西哥阿卡普尔科 Cuzco, Mexico墨西哥库斯科 medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high 世界著名景点的英语翻译 Asia 亚洲 Mount Fuji, Japan 日本富士山 Taj Mahal, India 印度泰姬陵 Angkor Wat, Cambodia 柬埔寨吴哥窟 Bali, Indonesia 印度尼西亚巴厘岛 Borobudur, Indonesia 印度尼西亚波罗浮屠 Sentosa, Singapore 新加坡圣淘沙 Babylon, Iraq 伊拉克巴比伦遗迹 Africa 非洲 Suez Canal, Egypt 埃及苏伊士运河}'EU Aswan High Dam, Egypt 埃及阿斯旺水坝 Pyramids, Egypt 埃及金字塔 The Nile, Egypt 埃及尼罗河 Nairobi National Park, Kenya 肯尼亚内罗毕国家公园 Cape of Good Hope, South Africa 南非好望角 Sahara Desert 撒哈拉大沙漠 Oceania 大洋洲 Great Barrier Reef, Australia 澳大利亚大堡礁 Sydney Opera House, Australia 澳大利亚悉尼歌剧院 Ayers Rock, Australia 澳大利亚艾尔斯巨石 Mount Cook, New Zealand 新西兰库克山 Europe 欧洲 Mosque of St, Sophia in Istanbul (Constantinople), Turkey 土耳其圣索非亚教堂 Notre Dame de Paris, France 法国巴黎圣母院 Effiel Tower, France 法国艾菲尔铁塔 Arch of Triumph['trai?mf] n.胜利, 成功;巨大的成就[成功] vi.获胜, 得胜; 克服, France 法国凯旋门 Elysee Palace, France 法国爱丽舍宫 Louvre, France 法国卢浮宫 Kolner Dom, Koln, Germany 德国科隆大教堂 Leaning Tower of Pisa, Italy 意大利比萨斜塔 Colosseum in Rome, Italy 意大利古罗马圆形剧场 Parthenon, Greece 希腊巴台农神庙 Red Square in Moscow, Russia 俄罗斯莫斯科红场 Big Ben in London, England 英国伦敦大本钟 Buckingham Palace, England 英国白金汉宫 medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high Hyde Park, England 英国海德公园 London Tower Bridge, England 英国伦敦塔桥 Westminster Abbey, England 英国威斯敏斯特大教堂 The Mediterranean 地中海 America 美洲 Niagara Falls, USA 美国尼亚加拉大瀑布 Honolulu, Hawaii, USA 美国夏威夷檀香山 Panama Canal 巴拿马运河 Yellowstone National Park, USA 美国黄石国家公园 Metropolitan Museum of Art, New York City, USA 美国纽约大都会艺术博物馆 Statue of Liberty, New York City, USA 美国纽约自由女神像 Times Square, New York City, USA 美国纽约时代广场 The White House, Washington DC., USA 美国华盛顿白宫 World Trade Center, New York City, USA 美国纽约世界贸易中心 Central Park, New York City, USA 美国纽约中央公园 Hollywood, California, USA 美国加利佛尼亚好莱坞 Disneyland, California, USA 加利佛尼亚迪斯尼乐园 Las Vegas, Nevada, USA 美国内华达拉斯威加斯 medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high
/
本文档为【著名景点,世界】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索