著名景点,世界
世界著名景点名称中英对照
The Himalayas喜马拉雅山
Great Wall, China中国长城
Forbidden City, Beijing, China北京故宫
Mount Fuji, Japan日本富士山
Taj Mahal, India印度泰姬陵
Angkor Wat, Cambodia柬埔寨吴哥窟
Bali, Indonesia印度尼西亚巴厘岛
Borobudur, Indonesia印度尼西亚波罗浮屠
Sentosa, Singapore新加坡圣淘沙
Crocodile Farm, Thailand泰国北榄鳄鱼湖
Pattaya Beach, Thailand泰国芭堤雅海滩
Babylon, Iraq伊拉克巴比伦遗迹
Mosque of St, Sophia in Istanbul (Constantinople), Turkey土耳其圣索非亚教堂
Africa非洲
Suez Canal, Egypt印度苏伊士运河
Aswan High Dam, Egypt印度阿斯旺水坝
Nairobi National Park, Kenya肯尼亚内罗毕国家公园
Cape of Good Hope, South Africa南非好望角
Sahara Desert撒哈拉大沙漠
Pyramids, Egypt埃及金字塔
The Nile, Egypt埃及尼罗河
Oceania大洋洲
medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high
Great Barrier Reef大堡礁
Sydney Opera House, Australia悉尼歌剧院
Ayers Rock艾尔斯巨石
Mount Cook库克山
Easter Island复活节岛
Europe欧洲
Notre Dame de Paris, France法国巴黎圣母院
Effiel Tower, France法国艾菲尔铁塔
Arch of Triumph, France法国凯旋门
Elysee Palace, France法国爱丽舍宫
Louvre, France法国卢浮宫
Kolner Dom, Koln, Germany德国科隆大教堂
Leaning Tower of Pisa, Italy意大利比萨斜塔
Colosseum in Rome, Italy意大利古罗马圆形剧场
Venice, Italy意大利威尼斯
Parthenon, Greece希腊巴台农神庙
Red Square in Moscow, Russia莫斯科红场
Big Ben in London, England英国伦敦大笨钟
Buckingham Palace, England白金汉宫
Hyde Park, England英国海德公园
London Tower Bridge, England伦敦塔桥
Westminster Abbey, England威斯敏斯特大教堂 medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high
Monte Carlo, Monaco摩洛哥蒙特卡罗
The Mediterranean地中海
The Americas美洲
Niagara Falls, New York State, USA美国尼亚加拉大瀑布
Bermuda百慕大
Honolulu[,h?n?'lu:lu:], Hawaii, USA美国夏威夷火奴鲁鲁
Panama Canal巴拿马大运河
Yellowstone National Park, USA美国黄石国家公园
Statue of Liberty, New York City, USA美国纽约自由女神像
Times Square, New York City, USA美国纽约时代广场
The White House, Washington DC., USA美国华盛顿白宫
World Trade Center, New York City, USA美国纽约世界贸易中心
Central Park, New York City, USA美国纽约中央公园
Yosemite National Park, USA美国尤塞米提国家公园
Grand Canyon['kænj?n], Arizona, USA美国亚利桑那州大峡谷
Hollywood, California, USA美国加利佛尼亚好莱坞
Disneyland, California, USA加利佛尼亚迪斯尼乐园
Las Vegas, Nevada, USA美国内华达拉斯威加斯
Miami, Florida, USA美国佛罗里达迈阿密
Metropolitan Museum of Art, New York City, USA纽约大都会艺术博物馆
Acapulco, Mexico墨西哥阿卡普尔科
Cuzco, Mexico墨西哥库斯科
medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high
世界著名景点的英语翻译
Asia 亚洲
Mount Fuji, Japan 日本富士山
Taj Mahal, India 印度泰姬陵
Angkor Wat, Cambodia 柬埔寨吴哥窟 Bali, Indonesia 印度尼西亚巴厘岛
Borobudur, Indonesia 印度尼西亚波罗浮屠 Sentosa, Singapore 新加坡圣淘沙
Babylon, Iraq 伊拉克巴比伦遗迹
Africa 非洲
Suez Canal, Egypt 埃及苏伊士运河}'EU Aswan High Dam, Egypt 埃及阿斯旺水坝 Pyramids, Egypt 埃及金字塔
The Nile, Egypt 埃及尼罗河
Nairobi National Park, Kenya 肯尼亚内罗毕国家公园 Cape of Good Hope, South Africa 南非好望角 Sahara Desert 撒哈拉大沙漠
Oceania 大洋洲
Great Barrier Reef, Australia 澳大利亚大堡礁 Sydney Opera House, Australia 澳大利亚悉尼歌剧院 Ayers Rock, Australia 澳大利亚艾尔斯巨石 Mount Cook, New Zealand 新西兰库克山
Europe 欧洲
Mosque of St, Sophia in Istanbul (Constantinople), Turkey 土耳其圣索非亚教堂
Notre Dame de Paris, France 法国巴黎圣母院 Effiel Tower, France 法国艾菲尔铁塔 Arch of Triumph['trai?mf]
n.胜利, 成功;巨大的成就[成功]
vi.获胜, 得胜; 克服, France 法国凯旋门 Elysee Palace, France 法国爱丽舍宫 Louvre, France 法国卢浮宫
Kolner Dom, Koln, Germany 德国科隆大教堂 Leaning Tower of Pisa, Italy 意大利比萨斜塔 Colosseum in Rome, Italy 意大利古罗马圆形剧场 Parthenon, Greece 希腊巴台农神庙
Red Square in Moscow, Russia 俄罗斯莫斯科红场 Big Ben in London, England 英国伦敦大本钟 Buckingham Palace, England 英国白金汉宫 medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high
Hyde Park, England 英国海德公园
London Tower Bridge, England 英国伦敦塔桥
Westminster Abbey, England 英国威斯敏斯特大教堂 The Mediterranean 地中海
America 美洲
Niagara Falls, USA 美国尼亚加拉大瀑布
Honolulu, Hawaii, USA 美国夏威夷檀香山
Panama Canal 巴拿马运河
Yellowstone National Park, USA 美国黄石国家公园 Metropolitan Museum of Art, New York City, USA 美国纽约大都会艺术博物馆
Statue of Liberty, New York City, USA 美国纽约自由女神像 Times Square, New York City, USA 美国纽约时代广场 The White House, Washington DC., USA 美国华盛顿白宫 World Trade Center, New York City, USA 美国纽约世界贸易中心 Central Park, New York City, USA 美国纽约中央公园 Hollywood, California, USA 美国加利佛尼亚好莱坞 Disneyland, California, USA 加利佛尼亚迪斯尼乐园 Las Vegas, Nevada, USA 美国内华达拉斯威加斯
medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high