联想Lenovo 安装XP系统后出现蓝屏、显卡驱动无法安装、一键恢复功能无法使用,解决方法
security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1)
Lenovo Y460/Y560出厂预装WIN7如何避免安装XP系统后出现蓝屏、显卡驱动无
法安装、一键恢复功能无法使用
问题描述
用户反映Y460/Y560机型在安装XP系统过程中出现蓝屏报错、进入系统后独立显卡驱动无法安装成功以及无法使用一键恢复的现象,如何避免,
问题分析
1、由于XP系统版本较老,在未安装AHCI驱动的情况下无法识别到机器出厂默认的AHCI硬盘模式,会出现在安装系统时出现蓝屏报错0X000007B的问题,即无法识别到硬盘。
2、由于Y460/Y560机型出厂均有双显卡(配备intel I7-720QM CPU的不支持双显卡切换),由于XP系统较老,在双显卡切换开启的情况下只能识别到集成显卡,即无法识别ATI独立显卡,导致ATI独立显卡驱动无法安装成功。
3、Y460/Y560机型均带有一键恢复功能,在WIN7下该功能需要200M引导分区、硬盘尾端的14.75G左右的隐藏分区不被破坏以及C盘大小不被改变才可正常使用。
解决
注意:安装系统之前务必备份硬盘重要数据
1、启动机器看到LENOVO logo界面时按F2键进入BIOS中。
2、修改硬盘传输模式
security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1)
security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1)
3、关闭双显卡切换
4、修改之后的bios信息
5、F10保存并退出即可
6、重启光驱引导进入到选择分区安装WINDOWS界面后首先保证引导分区不被破坏
open pit operation should be set up-and rain-proof body combat operations, and positive security rope fence. (2) must be equipped with the such as open storage should be tightly covered, transportation and shipment to prevent the impurity of flying in order to reduce dust. 4.4 measures to prevent water pollution: 4.4.1 mixing wastewater discharge control: emissions of wastewater discharged into the sedimentation tank in the second ... BA, labor scheduling and measure 1, labour demand: calculated according to the schedule of the project, preparation takes about 2,400 labor days, said today it will mop up to 2,100. About the project, total said today it will need 92,600. According to the construction schedule, peaked on the 15th day of labour to the 45th day. This phase focuses on engineering subgrade earthwork, drainage, manhole in construction labor demand up to 880 days/day, need to focus on labor guarantee. We arrange production on this issue that, wherever possible, machinery in order to reduce the amount of labor needed, restrict contracts through legal procedures, and measures to improve the treatment, ensure the necessary labor to maintain normal production. In order to ensure the quality of the workforce must have a certain number of technical workers. 2 2.1 establishment of workers ' wages, labor organizations and arrangements to ensure system: Project Manager and construction team, the teams and personal signature guarantee timely and full payment of wages of migrant workers undertaking signed on the protection of workers ' wages with the owners responsibility, establishing guarantee system from top to bottom. Financial guarantee: to establish a special fund for workers ' wages, project workers ' wages may not be appropriated for its use, according to report project progress allow workers ' wages per month and on time, never in arrears. And laborers team leaders, workers ' wages have signed terms of reward and punishment, each migrant worker payment salary cards, payment of wages by the laborers team leaders sign, discovery team leader was not issued in full and on time wages of migrant workers, fined them 10 times. Establish oversight bodies: the monthly salary payments issued, so that every migrant worker can understand and monitor salary payments. 2.2 Summary of project construction, project manager and department managers are chosen and construction management experience, strong expertise, extensive construction experience with similar projects personnel. 2.3 15 days before the start of the project to the corporate services sector provides detailed workforce planning, corporate services sector according to the project plan to ensure. 2.4 resolutely implement State Council issued on effectively solving the problem of default on construction project cost notification file indicates the spirit of, strictly implement the longest [document 2004]54 on the issuance of the notice, commitment not to workers
security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1)
7、保证14.75G的隐藏分区不被破坏
8、选择C盘格式化然后重新创建磁盘分区进行安装即可
security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1)
security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1)
9、系统安装完成后安装驱动即可。
备注:该文档仅适用于Y460A/Y560A机型,不适用于Y460N/Y460C和Y460P/Y560P。
open pit operation should be set up-and rain-proof body combat operations, and positive security rope fence. (2) must be equipped with the such as open storage should be tightly covered, transportation and shipment to prevent the impurity of flying in order to reduce dust. 4.4 measures to prevent water pollution: 4.4.1 mixing wastewater discharge control: emissions of wastewater discharged into the sedimentation tank in the second ... BA, labor scheduling and measure 1, labour demand: calculated according to the schedule of the project, preparation takes about 2,400 labor days, said today it will mop up to 2,100. About the project, total said today it will need 92,600. According to the construction schedule, peaked on the 15th day of labour to the 45th day. This phase focuses on engineering subgrade earthwork, drainage, manhole in construction labor demand up to 880 days/day, need to focus on labor guarantee. We arrange production on this issue that, wherever possible, machinery in order to reduce the amount of labor needed, restrict contracts through legal procedures, and measures to improve the treatment, ensure the necessary labor to maintain normal production. In order to ensure the quality of the workforce must have a certain number of technical workers. 2 2.1 establishment of workers ' wages, labor organizations and arrangements to ensure system: Project Manager and construction team, the teams and personal signature guarantee timely and full payment of wages of migrant workers undertaking signed on the protection of workers ' wages with the owners responsibility, establishing guarantee system from top to bottom. Financial guarantee: to establish a special fund for workers ' wages, project workers ' wages may not be appropriated for its use, according to report project progress allow workers ' wages per month and on time, never in arrears. And laborers team leaders, workers ' wages have signed terms of reward and punishment, each migrant worker payment salary cards, payment of wages by the laborers team leaders sign, discovery team leader was not issued in full and on time wages of migrant workers, fined them 10 times. Establish oversight bodies: the monthly salary payments issued, so that every migrant worker can understand and monitor salary payments. 2.2 Summary of project construction, project manager and department managers are chosen and construction management experience, strong expertise, extensive construction experience with similar projects personnel. 2.3 15 days before the start of the project to the corporate services sector provides detailed workforce planning, corporate services sector according to the project plan to ensure. 2.4 resolutely implement State Council issued on effectively solving the problem of default on construction project cost notification file indicates the spirit of, strictly implement the longest [document 2004]54 on the issuance of the notice, commitment not to workers