红牌许可证红牌许可证
Permit No. 0001
RED TAG PERMIT
红牌许可证
Description of Work:
工作简述: ____________________________________________________________________ Working Unit: Contracted Work Permit No. 作业单元: ________________ 承包作业许可证号: _______________ Contractor Representative: Compa...
红牌许可证
Permit No. 0001
RED TAG PERMIT
红牌许可证
Description of Work:
工作简述: ____________________________________________________________________ Working Unit: Contracted Work Permit No. 作业单元: ________________ 承包作业许可证号: _______________ Contractor Representative: Company Representative:
承包商代表: ________________ 公司代表: _______________ Contact No. Contact No.
联系电话: ________________ 联系电话: _______________
System out of operation:
受影响系统:
Water Sprinkler Fire Hydrants Fire Pumps
水喷淋系统 消火栓系统 消防泵
Inergen Fire Detection and Alarm Other
烟烙尽系统 火灾报警系统 其它:
Areas out of service: Attach essential drawings & specifications if necessary)
影响区域: ___________________________(需要时,附平面图加以注释)
Control valve No. Control valve location: 控制阀编号:_________________ 控制阀位置:____________________________
Measures to be taken:
需采取的预防措施:
Notify Fire Brigade Stop dangerous work Notify PEO
通知消防局 停止危险工序 通知厂内应急组织
Fire Fighting Truck on site Stop Hot Work Enforce guards patrol
准备消防车 停止热工作 加强保安巡逻 Other measures to be taken:
其它措施: _______________________________________________________________
Scheduled valve close date/time: Scheduled valve open date/time: 预定阀门关闭日期/时间 预定阀门开启日期/时间
Actually valve close date/time: Actually system recover date/time: 实际阀门关闭日期/时间 实际系统恢复日期/时间
Operated by: Operated by:
操作人签名: 操作人签名:
Tested by: Yes 是
System Test? 测试人签名:
是否进行系统测试: Test date/time: No 否
测试日期/时间:
Permit issued by: Permit approved by:
许可证发放人: 许可证批准人:
Date: Date:
日期 日期
st1 copy: Permit Issuer
第一页: 发放人
Page 1
Permit No. 0001
OUT OF SERVICE
暂停使用
Description of Work: 工作简述: ____________________________________________________________________ Working Unit: Contracted Work Permit No. 作业单元: ________________ 承包作业许可证号: _______________ Contractor Representative: Company Representative:
承包商代表: ________________ 公司代表: _______________ Contact No. Contact No.
联系电话: ________________ 联系电话: _______________
System out of operation:
受影响系统:
Water Sprinkler Fire Hydrants Fire Pumps
水喷淋系统 消火栓系统 消防泵
Inergen Fire Detection and Alarm Other
烟烙尽系统 火灾报警系统 其它:
Areas out of service: Attach essential drawings & specifications if necessary)
影响区域: ___________________________(需要时,附平面图加以注释)
Control valve No. Control valve location: 控制阀编号:_________________ 控制阀位置:____________________________
Measures to be taken:
需采取的预防措施:
Notify Fire Brigade Stop dangerous work Notify PEO
通知消防局 停止危险工序 通知厂内应急组织
Fire Fighting Truck on site Stop Hot Work Enforce guards patrol
准备消防车 停止热工作 加强保安巡逻 Other measures to be taken:
其它措施: _______________________________________________________________
Scheduled valve close date/time: Scheduled valve open date/time: 预定阀门关闭日期/时间 预定阀门开启日期/时间
Actually valve close date/time: Actually system recover date/time: 实际阀门关闭日期/时间 实际系统恢复日期/时间
Operated by: Operated by:
操作人签名: 操作人签名:
Tested by: Yes 是
System Test? 测试人签名:
是否进行系统测试: Test date/time: No 否
测试日期/时间:
Permit issued by: Permit approved by:
许可证发放人: 许可证批准人:
Date: Date:
日期 日期
nd2 copy: Security Control Center
第二页: 安保控制室
Page 2
Permit No. 0001
FIRE SYSTEM OUT OF SERVICE
消防系统暂停使用
Description of Work:
工作简述: ____________________________________________________________________ Working Unit: Contracted Work Permit No. 作业单元: ________________ 承包作业许可证号: _______________ Contractor Representative: Company Representative:
承包商代表: ________________ 公司代表: _______________ Contact No. Contact No.
联系电话: ________________ 联系电话: _______________
System out of operation:
受影响系统:
Water Sprinkler Fire Hydrants Fire Pumps
水喷淋系统 消火栓系统 消防泵
Inergen Fire Detection and Alarm Other
烟烙尽系统 火灾报警系统 其它:
Areas out of service: Attach essential drawings & specifications if necessary)
影响区域: ___________________________(需要时,附平面图加以注释)
Control valve No. Control valve location: 控制阀编号:_________________ 控制阀位置:____________________________
Measures to be taken:
需采取的预防措施:
Notify Fire Brigade Stop dangerous work Notify PEO
通知消防局 停止危险工序 通知厂内应急组织
Fire Fighting Truck on site Stop Hot Work Enforce guards patrol
准备消防车 停止热工作 加强保安巡逻 Other measures to be taken:
其它措施: _______________________________________________________________
Scheduled valve close date/time: Scheduled valve open date/time: 预定阀门关闭日期/时间 预定阀门开启日期/时间
Actually valve close date/time: Actually system recover date/time: 实际阀门关闭日期/时间 实际系统恢复日期/时间
Operated by: Operated by:
操作人签名: 操作人签名:
Tested by: Yes 是
System Test? 测试人签名:
是否进行系统测试: Test date/time: No 否
测试日期/时间:
Permit issued by: Permit approved by:
许可证发放人: 许可证批准人:
Date: Date:
日期 日期
rd3 copy: Control Site
第三页: 控制现场
Page 3
Permit No. 0001
FIRE SYSTEM
OUT OF SERVICE
消防系统
暂停使用
DESCRIPTION:
简述:
This permit authorizes the commencement of work, which conducting will impair fire
system’s normal function.
此许可授权工作的开始,此工作的实施将影响消防系统正常功能.
INSTRUCTION
:
1. 公司Representative informs Facility Engineer and/or EHS Engineer related work
planning.
公司代表通知厂务
师/EHS工程师相关工作
。
2. Facility Engineer and/or EHS Engineer issue “Red Tag Permit.
厂务工程师和/或EHS工程师发放 “红牌许可证”.
3. Facility Supervisor and/or Manager approve “Red Tag Permit”.
厂务主管和/或经理批准“红牌许可证”.
4. Security Technician operates fire system according to approved “Red Tag Permit”.
安保技术员根据经批准的 “红牌许可证”操作消防系统。
5. Security Technician recover system, conduct test where practicable.
安保技术员恢复系统,可能时对系统进行测试.
rd6. EHS Engineer keeps finished 3 page for file.
EHS 工程师将已完结的第三页存档.
Page 4
本文档为【红牌许可证】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑,
图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。