为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

综合治理工程形象进度表9月29

2017-09-18 35页 doc 111KB 16阅读

用户头像

is_672950

暂无简介

举报
综合治理工程形象进度表9月29综合治理工程形象进度表9月29 Construction scheme of Chapter 1.1 the integrated presentation as a programmatic document for guiding construction of the construction organization design to meet the request of tender documents to principles highlight the scientific nature, serious...
综合治理工程形象进度表9月29
综合治理形象进度表9月29 Construction scheme of Chapter 1.1 the integrated presentation as a programmatic document for guiding construction of the construction organization design to meet the request of tender documents to principles highlight the scientific nature, seriousness and feasibility, regulatory and guidance. According to about content and the company related engineering construction experience, on project management organization institutions set, labor plans arrangements, material supply arrangements, mechanical equipment configuration, main points part items engineering construction, duration guarantee measures, and quality, and security guarantee measures, guarantee safety, civilization construction, reduced nuisance, reduced pollution and noise of measures, do has detailed of deployment, to ensure the engineering quality, and high-speed, and security civilization, and environmental construction. 1.1.1 the establishment basis 1 tender document; 2 Summary of construction drawing and drawing, technical approval; 3 geological survey report, local weather conditions; 4 to the supply of materials; 5 construction-related laws, regulations and local regulations, compulsory provision of engineering construction, existing national, industry, regional Atlas of norms, procedures and standards; 7 company of the quality manual, environmental/occupational safety and Health Handbook and procedures document; 8 technology, funding, equipment and construction managers, labor and technical force rich construction and related engineering experience with good service and commitment to the company. 1.1.2.1 1.1.2 preparation of principles committed to all meet all the requirements and tender documents all commitments service-oriented, focus on customer satisfaction as the main evaluation, quality first, fully embodies the design style. 1.1.2.2 earnestly familiarity with drawing paper and understand the design philosophy, manifests the design intent, play to the company's overall advantage to achieve high quality, high speed, safety, and environmental protection construction, advanced technology, reducing the cost of. 1.1.2.3 around the quality objectives of the project, carried out in the quality control "test evaluation of separation, strengthen inspection, perfect means, process control," the 16-character guideline to ensure that eligibility criteria, on the basis of striving for excellence. 1.1.2.4 ensuring construction safety accident-free, environmentally friendly production and civilized construction, to achieve municipal "model safe and civilized construction site". 1.1.2.5 promotion, application construction of 10 new technologies and new materials, new techniques, new equipment and improve the level of project and construction management of modern scientific and technological content, declare a provincial construction technologies application and demonstration project. 1.1.3 preparation of 综 合 说 明 一、基本情况:本工程招、投标共计四个标段,总投资23099455.02元,工期:2012年5月10日----2012年10月6日,历时工期150天。 其中:1、一标段内容为;浆砌挡土墙和格宾石笼网护坡(桩号R0+000---R1+200长1160.5米), 投资6514996.74元。 2、二标段施工内容为;格宾石笼网护坡(桩号R1+200---R2+361.24/L2+119.69和L2+523.16长1478.71米), 投资8132796.8元。 3、三标段施工内容为;1#橡胶坝工程(河中心桩号Z0+690.00----Z0+729.5),坝长100米,坝高1.5米, 总宽39.5米,投资3824067.47元。 4、四标段施工内容为;2#橡胶坝工程(河中心桩号Z2+352.23----Z2+395.23),坝长103米(变更),坝高 2..5米,总宽43米, 投资4627594元。 二、工程形象进度:截止2012年9月29日 一标;施工现场进度形象为; 1、已完成的坡脚防冲抛石碾压长300米,桩号(0+120-0+420)。 Construction scheme of Chapter 1.1 the integrated presentation as a programmatic document for guiding construction of the construction organization design to meet the request of tender documents to principles highlight the scientific nature, seriousness and feasibility, regulatory and guidance. According to about content and the company related engineering construction experience, on project management organization institutions set, labor plans arrangements, material supply arrangements, mechanical equipment configuration, main points part items engineering construction, duration guarantee measures, and quality, and security guarantee measures, guarantee safety, civilization construction, reduced nuisance, reduced pollution and noise of measures, do has detailed of deployment, to ensure the engineering quality, and high-speed, and security civilization, and environmental construction. 1.1.1 the establishment basis 1 tender document; 2 Summary of construction drawing and drawing, technical approval; 3 geological survey report, local weather conditions; 4 to the supply of materials; 5 construction-related laws, regulations and local regulations, compulsory provision of engineering construction, existing national, industry, regional Atlas of norms, procedures and standards; 7 company of the quality manual, environmental/occupational safety and Health Handbook and procedures document; 8 technology, funding, equipment and construction managers, labor and technical force rich construction and related engineering experience with good service and commitment to the company. 1.1.2.1 1.1.2 preparation of principles committed to all meet all the requirements and tender documents all commitments service-oriented, focus on customer satisfaction as the main evaluation, quality first, fully embodies the design style. 1.1.2.2 earnestly familiarity with drawing paper and understand the design philosophy, manifests the design intent, play to the company's overall advantage to achieve high quality, high speed, safety, and environmental protection construction, advanced technology, reducing the cost of. 1.1.2.3 around the quality objectives of the project, carried out in the quality control "test evaluation of separation, strengthen inspection, perfect means, process control," the 16-character guideline to ensure that eligibility criteria, on the basis of striving for excellence. 1.1.2.4 ensuring construction safety accident-free, environmentally friendly production and civilized construction, to achieve municipal "model safe and civilized construction site". 1.1.2.5 promotion, application construction of 10 new technologies and new materials, new techniques, new equipment and improve the level of project and construction management of modern scientific and technological content, declare a provincial construction technologies application and demonstration project. 1.1.3 preparation of Construction scheme of Chapter 1.1 the integrated presentation as a programmatic document for guiding construction of the construction organization design to meet the request of tender documents to principles highlight the scientific nature, seriousness and feasibility, regulatory and guidance. According to about content and the company related engineering construction experience, on project management organization institutions set, labor plans arrangements, material supply arrangements, mechanical equipment configuration, main points part items engineering construction, duration guarantee measures, and quality, and security guarantee measures, guarantee safety, civilization construction, reduced nuisance, reduced pollution and noise of measures, do has detailed of deployment, to ensure the engineering quality, and high-speed, and security civilization, and environmental construction. 1.1.1 the establishment basis 1 tender document; 2 Summary of construction drawing and drawing, technical approval; 3 geological survey report, local weather conditions; 4 to the supply of materials; 5 construction-related laws, regulations and local regulations, compulsory provision of engineering construction, existing national, industry, regional Atlas of norms, procedures and standards; 7 company of the quality manual, environmental/occupational safety and Health Handbook and procedures document; 8 technology, funding, equipment and construction managers, labor and technical force rich construction and related engineering experience with good service and commitment to the company. 1.1.2.1 1.1.2 preparation of principles committed to all meet all the requirements and tender documents all commitments service-oriented, focus on customer satisfaction as the main evaluation, quality first, fully embodies the design style. 1.1.2.2 earnestly familiarity with drawing paper and understand the design philosophy, manifests the design intent, play to the company's overall advantage to achieve high quality, high speed, safety, and environmental protection construction, advanced technology, reducing the cost of. 1.1.2.3 around the quality objectives of the project, carried out in the quality control "test evaluation of separation, strengthen inspection, perfect means, process control," the 16-character guideline to ensure that eligibility criteria, on the basis of striving for excellence. 1.1.2.4 ensuring construction safety accident-free, environmentally friendly production and civilized construction, to achieve municipal "model safe and civilized construction site". 1.1.2.5 promotion, application construction of 10 new technologies and new materials, new techniques, new equipment and improve the level of project and construction management of modern scientific and technological content, declare a provincial construction technologies application and demonstration project. 1.1.3 preparation of 2、完成桩号0+144--0+394段挡土墙贴面工序的脚手架搭设长250米,墙面打孔250米,支撑长60米, C25细石混凝土浇筑60米长。 二标:施工现场进度形象为; 1、河道左岸护坡已碾压整型400米,护坡格宾石笼网坡脚的基础开挖、砌筑格宾石笼网、砂砺料垫层填 筑工序长250米桩号(L2+119.69---L2+369)。 2、完成主河道格宾石笼网坡脚基础开挖、砌筑格宾石笼网、砂砺料垫层填筑工序长250米,桩号 (L2+119.69---L2+369)。 三标;施工现场进度形象为;没有开工。没有审报任何资料 四标;施工现场进度形象为;1、泵房主体巳完成。内外粉刷基本完毕。 2、橡胶坝左岸开工段长80米, 其中:橡胶坝完成了全部工序长70米, 铺盖段完成了干砌石长70米,正在进行下一道工序, 海漫段完成了基础开挖工序, 消力池完成了全部工序长40米, 防冲槽完成了全部工序长40米, scope other than unit package contents directly within the construction drawings of all civil works, installation. 1.1.4 used in this project the main norms and standard Atlas serial number name number 1 the architectural engineering construction quality approval standard GB 50300-2001 2 building ground foundation engineering construction quality approval standard GB masonry project construction quality approval standard GB 50202-2002 3 50203-2002 4 50204-2010 concrete structure project construction quality approval standard GB 5 project quality approval ... Steel parts of its steel to meet the relevant national standards on the basis of, also to meet the specification and design on mechanical properties of earthquake-resistant structures. For easy rebar supply reasonable, subcontractor selection 1-2. 2 steel raw materials testing steel comes into play, must verify that the certificate of quality of materials, which include: strength and reinforcement level, grade, grades, specifications, quantities, mechanical properties, chemical composition, process performance, order date, inspection seal, certificate number. Projects identified in the certificate is complete and accurate, listed mechanical properties, process performance and chemical composition in accordance with the corresponding technical standards, steel, model consistent with the procurement plan. Best steel quality certificate for the original, if when you copy, stamped seal of the original storage units. Steel comes into play, inspection and acceptance by batch, each issue of the same grade, the furnace tank, reinforced with the specifications, delivery status, and weight of not more than 60 tons for a second interview. Witness sampling by a supervising engineer, after passing the second interview and acceptance of supervision engineers to be used. 3 steel making 3.1 steel processing making Qian, Xia material table to by technician and foreman audit, and will steel processing Xia material table and design figure review, check Xia material table whether has errors missed, on each species steel to by Xia material table check whether reached design and specification requirements, after this two road check Hou, again by Xia material table made sample, trial qualified rear can batch making, processing good of steel semi-finished products to tone identifies, stacked neatly ordered. 3.2 when you need reinforcement replacement in construction, agreed with the consent of the design, and there is a written notification before substitution, shall not be an area of high-strength steel bars reinforcement replacement of low intensity. 3.3 bar surface cleaner, glue, grease, dirt, rust must be cleaned before use. 3.4 After straightening, the bars must not have local bending, small dead bent, wavy, its scars on the surface section of the reinforcement must not be greater than 5%. 3.5 steel according to the rebar sizes, diameters, lengths and quantities length match, Construction scheme of Chapter 1.1 the integrated presentation as a programmatic document for guiding construction of the construction organization design to meet the request of tender documents to principles highlight the scientific nature, seriousness and feasibility, regulatory and guidance. According to about content and the company related engineering construction experience, on project management organization institutions set, labor plans arrangements, material supply arrangements, mechanical equipment configuration, main points part items engineering construction, duration guarantee measures, and quality, and security guarantee measures, guarantee safety, civilization construction, reduced nuisance, reduced pollution and noise of measures, do has detailed of deployment, to ensure the engineering quality, and high-speed, and security civilization, and environmental construction. 1.1.1 the establishment basis 1 tender document; 2 Summary of construction drawing and drawing, technical approval; 3 geological survey report, local weather conditions; 4 to the supply of materials; 5 construction-related laws, regulations and local regulations, compulsory provision of engineering construction, existing national, industry, regional Atlas of norms, procedures and standards; 7 company of the quality manual, environmental/occupational safety and Health Handbook and procedures document; 8 technology, funding, equipment and construction managers, labor and technical force rich construction and related engineering experience with good service and commitment to the company. 1.1.2.1 1.1.2 preparation of principles committed to all meet all the requirements and tender documents all commitments service-oriented, focus on customer satisfaction as the main evaluation, quality first, fully embodies the design style. 1.1.2.2 earnestly familiarity with drawing paper and understand the design philosophy, manifests the design intent, play to the company's overall advantage to achieve high quality, high speed, safety, and environmental protection construction, advanced technology, reducing the cost of. 1.1.2.3 around the quality objectives of the project, carried out in the quality control "test evaluation of separation, strengthen inspection, perfect means, process control," the 16-character guideline to ensure that eligibility criteria, on the basis of striving for excellence. 1.1.2.4 ensuring construction safety accident-free, environmentally friendly production and civilized construction, to achieve municipal "model safe and civilized construction site". 1.1.2.5 promotion, application construction of 10 new technologies and new materials, new techniques, new equipment and improve the level of project and construction management of modern scientific and technological content, declare a provincial construction technologies application and demonstration project. 1.1.3 preparation of三、其它事宜: 1、业主方面:尽快解决三标一号橡胶坝右岸的苗圃问题。 2、监理方面:目前重点注意施工进度、安全、质量工作,监督和督促完善施工与资料同步程序。同时积极作好业主与 承包商的协调工作。 3、承包商方面:1、 建立健全质量管理体系、加快施工进度,完善施工程序等各种资料,严格履行施工与资料同步, 确保工程质量。 Construction scheme of Chapter 1.1 the integrated presentation as a programmatic document for guiding construction of the construction organization design to meet the request of tender documents to principles highlight the scientific nature, seriousness and feasibility, regulatory and guidance. According to about content and the company related engineering construction experience, on project management organization institutions set, labor plans arrangements, material supply arrangements, mechanical equipment configuration, main points part items engineering construction, duration guarantee measures, and quality, and security guarantee measures, guarantee safety, civilization construction, reduced nuisance, reduced pollution and noise of measures, do has detailed of deployment, to ensure the engineering quality, and high-speed, and security civilization, and environmental construction. 1.1.1 the establishment basis 1 tender document; 2 Summary of construction drawing and drawing, technical approval; 3 geological survey report, local weather conditions; 4 to the supply of materials; 5 construction-related laws, regulations and local regulations, compulsory provision of engineering construction, existing national, industry, regional Atlas of norms, procedures and standards; 7 company of the quality manual, environmental/occupational safety and Health Handbook and procedures document; 8 technology, funding, equipment and construction managers, labor and technical force rich construction and related engineering experience with good service and commitment to the company. 1.1.2.1 1.1.2 preparation of principles committed to all meet all the requirements and tender documents all commitments service-oriented, focus on customer satisfaction as the main evaluation, quality first, fully embodies the design style. 1.1.2.2 earnestly familiarity with drawing paper and understand the design philosophy, manifests the design intent, play to the company's overall advantage to achieve high quality, high speed, safety, and environmental protection construction, advanced technology, reducing the cost of. 1.1.2.3 around the quality objectives of the project, carried out in the quality control "test evaluation of separation, strengthen inspection, perfect means, process control," the 16-character guideline to ensure that eligibility criteria, on the basis of striving for excellence. 1.1.2.4 ensuring construction safety accident-free, environmentally friendly production and civilized construction, to achieve municipal "model safe and civilized construction site". 1.1.2.5 promotion, application construction of 10 new technologies and new materials, new techniques, new equipment and improve the level of project and construction management of modern scientific and technological content, declare a provincial construction technologies application and demonstration project. 1.1.3 preparation of Construction scheme of Chapter 1.1 the integrated presentation as a programmatic document for guiding construction of the construction organization design to meet the request of tender documents to principles highlight the scientific nature, seriousness and feasibility, regulatory and guidance. According to about content and the company related engineering construction experience, on project management organization institutions set, labor plans arrangements, material supply arrangements, mechanical equipment configuration, main points part items engineering construction, duration guarantee measures, and quality, and security guarantee measures, guarantee safety, civilization construction, reduced nuisance, reduced pollution and noise of measures, do has detailed of deployment, to ensure the engineering quality, and high-speed, and security civilization, and environmental construction. 1.1.1 the establishment basis 1 tender document; 2 Summary of construction drawing and drawing, technical approval; 3 geological survey report, local weather conditions; 4 to the supply of materials; 5 construction-related laws, regulations and local regulations, compulsory provision of engineering construction, existing national, industry, regional Atlas of norms, procedures and standards; 7 company of the quality manual, environmental/occupational safety and Health Handbook and procedures document; 8 technology, funding, equipment and construction managers, labor and technical force rich construction and related engineering experience with good service and commitment to the company. 1.1.2.1 1.1.2 preparation of principles committed to all meet all the requirements and tender documents all commitments service-oriented, focus on customer satisfaction as the main evaluation, quality first, fully embodies the design style. 1.1.2.2 earnestly familiarity with drawing paper and understand the design philosophy, manifests the design intent, play to the company's overall advantage to achieve high quality, high speed, safety, and environmental protection construction, advanced technology, reducing the cost of. 1.1.2.3 around the quality objectives of the project, carried out in the quality control "test evaluation of separation, strengthen inspection, perfect means, process control," the 16-character guideline to ensure that eligibility criteria, on the basis of striving for excellence. 1.1.2.4 ensuring construction safety accident-free, environmentally friendly production and civilized construction, to achieve municipal "model safe and civilized construction site". 1.1.2.5 promotion, application construction of 10 new technologies and new materials, new techniques, new equipment and improve the level of project and construction management of modern scientific and technological content, declare a provincial construction technologies application and demonstration project. 1.1.3 preparation of 襄垣县浊漳河东北阳段综合治理形象进度月报表 (时间:2012年 9月29日) 工序名称 单位 合同量 本月完成量 开工至今累计完成量 承包商 华宇广泰建工集团 挖一般土方 m? 31189.09 2917 3517 单 位 有限公司 填方 m? 5405.91 余土弃置 m? 25108.08 砌筑挡墙 m? 2854.25 挡墙砼压顶 m? 21.3 现浇砼挡墙墙身 m? 239.6 标段 一标 石材墙面 ? 1597.33 脚手架搭设 ? 1750 1750 墙面打孔 ? 1000 1000 模板 ? 108 108 碎石虑层 ? 675.85 中细砂虑层 ? 903.02 抛石碾压 m? 2917.79 1650 1650 桩号 R0+000---R1+200 挡墙泄水管 米 572 浆砌块料 m? 28.62 土工布 ? 10768.68 砂砾石 ? 25497.1 人员 格滨石笼 m? 7247.4 22人 (数量) 填方 m? 1278.52 临时工程 项 1 施工情况补充说明:按合同工期约定工期计算,工期严重滞后。主要因素:苗圃受影响,急需加快工程进度。 scope other than unit package contents directly within the construction drawings of all civil works, installation. 1.1.4 used in this project the main norms and standard Atlas serial number name number 1 the architectural engineering construction quality approval standard GB 50300-2001 2 building ground foundation engineering construction quality approval standard GB masonry project construction quality approval standard GB 50202-2002 3 50203-2002 4 50204-2010 concrete structure project construction quality approval standard GB 5 project quality approval ... Steel parts of its steel to meet the relevant national standards on the basis of, also to meet the specification and design on mechanical properties of earthquake-resistant structures. For easy rebar supply reasonable, subcontractor selection 1-2. 2 steel raw materials testing steel comes into play, must verify that the certificate of quality of materials, which include: strength and reinforcement level, grade, grades, specifications, quantities, mechanical properties, chemical composition, process performance, order date, inspection seal, certificate number. Projects identified in the certificate is complete and accurate, listed mechanical properties, process performance and chemical composition in accordance with the corresponding technical standards, steel, model consistent with the procurement plan. Best steel quality certificate for the original, if when you copy, stamped seal of the original storage units. Steel comes into play, inspection and acceptance by batch, each issue of the same grade, the furnace tank, reinforced with the specifications, delivery status, and weight of not more than 60 tons for a second interview. Witness sampling by a supervising engineer, after passing the second interview and acceptance of supervision engineers to be used. 3 steel making 3.1 steel processing making Qian, Xia material table to by technician and foreman audit, and will steel processing Xia material table and design figure review, check Xia material table whether has errors missed, on each species steel to by Xia material table check whether reached design and specification requirements, after this two road check Hou, again by Xia material table made sample, trial qualified rear can batch making, processing good of steel semi-finished products to tone identifies, stacked neatly ordered. 3.2 when you need reinforcement replacement in construction, agreed with the consent of the design, and there is a written notification before substitution, shall not be an area of high-strength steel bars reinforcement replacement of low intensity. 3.3 bar surface cleaner, glue, grease, dirt, rust must be cleaned before use. 3.4 After straightening, the bars must not have local bending, small dead bent, wavy, its scars on the surface section of the reinforcement must not be greater than 5%. 3.5 steel according to the rebar sizes, diameters, lengths and quantities length match, Construction scheme of Chapter 1.1 the integrated presentation as a programmatic document for guiding construction of the construction organization design to meet the request of tender documents to principles highlight the scientific nature, seriousness and feasibility, regulatory and guidance. According to about content and the company related engineering construction experience, on project management organization institutions set, labor plans arrangements, material supply arrangements, mechanical equipment configuration, main points part items engineering construction, duration guarantee measures, and quality, and security guarantee measures, guarantee safety, civilization construction, reduced nuisance, reduced pollution and noise of measures, do has detailed of deployment, to ensure the engineering quality, and high-speed, and security civilization, and environmental construction. 1.1.1 the establishment basis 1 tender document; 2 Summary of construction drawing and drawing, technical approval; 3 geological survey report, local weather conditions; 4 to the supply of materials; 5 construction-related laws, regulations and local regulations, compulsory provision of engineering construction, existing national, industry, regional Atlas of norms, procedures and standards; 7 company of the quality manual, environmental/occupational safety and Health Handbook and procedures document; 8 technology, funding, equipment and construction managers, labor and technical force rich construction and related engineering experience with good service and commitment to the company. 1.1.2.1 1.1.2 preparation of principles committed to all meet all the requirements and tender documents all commitments service-oriented, focus on customer satisfaction as the main evaluation, quality first, fully embodies the design style. 1.1.2.2 earnestly familiarity with drawing paper and understand the design philosophy, manifests the design intent, play to the company's overall advantage to achieve high quality, high speed, safety, and environmental protection construction, advanced technology, reducing the cost of. 1.1.2.3 around the quality objectives of the project, carried out in the quality control "test evaluation of separation, strengthen inspection, perfect means, process control," the 16-character guideline to ensure that eligibility criteria, on the basis of striving for excellence. 1.1.2.4 ensuring construction safety accident-free, environmentally friendly production and civilized construction, to achieve municipal "model safe and civilized construction site". 1.1.2.5 promotion, application construction of 10 new technologies and new materials, new techniques, new equipment and improve the level of project and construction management of modern scientific and technological content, declare a provincial construction technologies application and demonstration project. 1.1.3 preparation of 襄垣县浊漳河东北阳段综合治理工程施工形象进度月报表 (时间:2012年 9月29日) 工序名称 单位 合同量 本月完成量 开工至今累计完成量 林州市太行建设工程 承包商 挖一般土方 m? 35526.61 2000 4507 单 位 有限公司 余土弃置 m? 35526.61 浆砌块料 m? 28.62 标段 二标 土工布(新增) ? 砂砾石 ? 54406.03 300 450 R1+200---R2+361.24 桩号 格滨石笼 m? 16641.54 300 550 L2+119.69-----L2+433.16 填方 m? 2083.53 人员 30人 临时工程 项 1 (数量) 施工情况补充说明:按合同工期约定工期计算,工期严重滞后。急需加快工程进度。 Construction scheme of Chapter 1.1 the integrated presentation as a programmatic document for guiding construction of the construction organization design to meet the request of tender documents to principles highlight the scientific nature, seriousness and feasibility, regulatory and guidance. According to about content and the company related engineering construction experience, on project management organization institutions set, labor plans arrangements, material supply arrangements, mechanical equipment configuration, main points part items engineering construction, duration guarantee measures, and quality, and security guarantee measures, guarantee safety, civilization construction, reduced nuisance, reduced pollution and noise of measures, do has detailed of deployment, to ensure the engineering quality, and high-speed, and security civilization, and environmental construction. 1.1.1 the establishment basis 1 tender document; 2 Summary of construction drawing and drawing, technical approval; 3 geological survey report, local weather conditions; 4 to the supply of materials; 5 construction-related laws, regulations and local regulations, compulsory provision of engineering construction, existing national, industry, regional Atlas of norms, procedures and standards; 7 company of the quality manual, environmental/occupational safety and Health Handbook and procedures document; 8 technology, funding, equipment and construction managers, labor and technical force rich construction and related engineering experience with good service and commitment to the company. 1.1.2.1 1.1.2 preparation of principles committed to all meet all the requirements and tender documents all commitments service-oriented, focus on customer satisfaction as the main evaluation, quality first, fully embodies the design style. 1.1.2.2 earnestly familiarity with drawing paper and understand the design philosophy, manifests the design intent, play to the company's overall advantage to achieve high quality, high speed, safety, and environmental protection construction, advanced technology, reducing the cost of. 1.1.2.3 around the quality objectives of the project, carried out in the quality control "test evaluation of separation, strengthen inspection, perfect means, process control," the 16-character guideline to ensure that eligibility criteria, on the basis of striving for excellence. 1.1.2.4 ensuring construction safety accident-free, environmentally friendly production and civilized construction, to achieve municipal "model safe and civilized construction site". 1.1.2.5 promotion, application construction of 10 new technologies and new materials, new techniques, new equipment and improve the level of project and construction management of modern scientific and technological content, declare a provincial construction technologies application and demonstration project. 1.1.3 preparation of Construction scheme of Chapter 1.1 the integrated presentation as a programmatic document for guiding construction of the construction organization design to meet the request of tender documents to principles highlight the scientific nature, seriousness and feasibility, regulatory and guidance. According to about content and the company related engineering construction experience, on project management organization institutions set, labor plans arrangements, material supply arrangements, mechanical equipment configuration, main points part items engineering construction, duration guarantee measures, and quality, and security guarantee measures, guarantee safety, civilization construction, reduced nuisance, reduced pollution and noise of measures, do has detailed of deployment, to ensure the engineering quality, and high-speed, and security civilization, and environmental construction. 1.1.1 the establishment basis 1 tender document; 2 Summary of construction drawing and drawing, technical approval; 3 geological survey report, local weather conditions; 4 to the supply of materials; 5 construction-related laws, regulations and local regulations, compulsory provision of engineering construction, existing national, industry, regional Atlas of norms, procedures and standards; 7 company of the quality manual, environmental/occupational safety and Health Handbook and procedures document; 8 technology, funding, equipment and construction managers, labor and technical force rich construction and related engineering experience with good service and commitment to the company. 1.1.2.1 1.1.2 preparation of principles committed to all meet all the requirements and tender documents all commitments service-oriented, focus on customer satisfaction as the main evaluation, quality first, fully embodies the design style. 1.1.2.2 earnestly familiarity with drawing paper and understand the design philosophy, manifests the design intent, play to the company's overall advantage to achieve high quality, high speed, safety, and environmental protection construction, advanced technology, reducing the cost of. 1.1.2.3 around the quality objectives of the project, carried out in the quality control "test evaluation of separation, strengthen inspection, perfect means, process control," the 16-character guideline to ensure that eligibility criteria, on the basis of striving for excellence. 1.1.2.4 ensuring construction safety accident-free, environmentally friendly production and civilized construction, to achieve municipal "model safe and civilized construction site". 1.1.2.5 promotion, application construction of 10 new technologies and new materials, new techniques, new equipment and improve the level of project and construction management of modern scientific and technological content, declare a provincial construction technologies application and demonstration project. 1.1.3 preparation of 襄垣县浊漳河东北阳段综合治理工程施工形象进度月报表 (时间:2012年9月29日) 工序名称 单位 合同量 本月完成量 开工至今累计完成量 机械成孔灌住桩 M 2345.00 河南省佳兴建筑市政工程 承包商 (抛石碾压) ? (864) 单 位 块石 ? 920.00 有限公司 水泥混凝土(C20) ? 1001.33 混凝土基础(C25) m? 800.00 混凝土基础(C25) m? 739.7 碎石 ? 945.00 标段 三标(1#橡胶坝) 块石 ? 1000.00 挡墙基础 m? 46.8 现浇砼挡墙强身 m? 91.68 非预应力钢筋 t 107.2 桩号 Z0+690.00,Z0+729.5 块石 m? 600.00 低发泡聚乙烯泡沫板 ? 390.00 密封膏止水 m 300.00 橡胶坝袋安装 个 1 人员 1号泵站及集水池 个 1 (数量) 临时工程 项 1 挖淤泥 m? 2250.00 施工情况补充说明:人员设备设有进场,机械成孔灌住桩变更为:抛石碾压。按合同工期约定工期计算,工期严重滞后。主要因素:施工组织机构和人员不到位故工期严重滞后。 scope other than unit package contents directly within the construction drawings of all civil works, installation. 1.1.4 used in this project the main norms and standard Atlas serial number name number 1 the architectural engineering construction quality approval standard GB 50300-2001 2 building ground foundation engineering construction quality approval standard GB masonry project construction quality approval standard GB 50202-2002 3 50203-2002 4 50204-2010 concrete structure project construction quality approval standard GB 5 project quality approval ... Steel parts of its steel to meet the relevant national standards on the basis of, also to meet the specification and design on mechanical properties of earthquake-resistant structures. For easy rebar supply reasonable, subcontractor selection 1-2. 2 steel raw materials testing steel comes into play, must verify that the certificate of quality of materials, which include: strength and reinforcement level, grade, grades, specifications, quantities, mechanical properties, chemical composition, process performance, order date, inspection seal, certificate number. Projects identified in the certificate is complete and accurate, listed mechanical properties, process performance and chemical composition in accordance with the corresponding technical standards, steel, model consistent with the procurement plan. Best steel quality certificate for the original, if when you copy, stamped seal of the original storage units. Steel comes into play, inspection and acceptance by batch, each issue of the same grade, the furnace tank, reinforced with the specifications, delivery status, and weight of not more than 60 tons for a second interview. Witness sampling by a supervising engineer, after passing the second interview and acceptance of supervision engineers to be used. 3 steel making 3.1 steel processing making Qian, Xia material table to by technician and foreman audit, and will steel processing Xia material table and design figure review, check Xia material table whether has errors missed, on each species steel to by Xia material table check whether reached design and specification requirements, after this two road check Hou, again by Xia material table made sample, trial qualified rear can batch making, processing good of steel semi-finished products to tone identifies, stacked neatly ordered. 3.2 when you need reinforcement replacement in construction, agreed with the consent of the design, and there is a written notification before substitution, shall not be an area of high-strength steel bars reinforcement replacement of low intensity. 3.3 bar surface cleaner, glue, grease, dirt, rust must be cleaned before use. 3.4 After straightening, the bars must not have local bending, small dead bent, wavy, its scars on the surface section of the reinforcement must not be greater than 5%. 3.5 steel according to the rebar sizes, diameters, lengths and quantities length match, Construction scheme of Chapter 1.1 the integrated presentation as a programmatic document for guiding construction of the construction organization design to meet the request of tender documents to principles highlight the scientific nature, seriousness and feasibility, regulatory and guidance. According to about content and the company related engineering construction experience, on project management organization institutions set, labor plans arrangements, material supply arrangements, mechanical equipment configuration, main points part items engineering construction, duration guarantee measures, and quality, and security guarantee measures, guarantee safety, civilization construction, reduced nuisance, reduced pollution and noise of measures, do has detailed of deployment, to ensure the engineering quality, and high-speed, and security civilization, and environmental construction. 1.1.1 the establishment basis 1 tender document; 2 Summary of construction drawing and drawing, technical approval; 3 geological survey report, local weather conditions; 4 to the supply of materials; 5 construction-related laws, regulations and local regulations, compulsory provision of engineering construction, existing national, industry, regional Atlas of norms, procedures and standards; 7 company of the quality manual, environmental/occupational safety and Health Handbook and procedures document; 8 technology, funding, equipment and construction managers, labor and technical force rich construction and related engineering experience with good service and commitment to the company. 1.1.2.1 1.1.2 preparation of principles committed to all meet all the requirements and tender documents all commitments service-oriented, focus on customer satisfaction as the main evaluation, quality first, fully embodies the design style. 1.1.2.2 earnestly familiarity with drawing paper and understand the design philosophy, manifests the design intent, play to the company's overall advantage to achieve high quality, high speed, safety, and environmental protection construction, advanced technology, reducing the cost of. 1.1.2.3 around the quality objectives of the project, carried out in the quality control "test evaluation of separation, strengthen inspection, perfect means, process control," the 16-character guideline to ensure that eligibility criteria, on the basis of striving for excellence. 1.1.2.4 ensuring construction safety accident-free, environmentally friendly production and civilized construction, to achieve municipal "model safe and civilized construction site". 1.1.2.5 promotion, application construction of 10 new technologies and new materials, new techniques, new equipment and improve the level of project and construction management of modern scientific and technological content, declare a provincial construction technologies application and demonstration project. 1.1.3 preparation of 襄垣县浊漳河东北阳段综合治理工程施工形象进度月报表 (时间:2012年 9 月 29 日) 工序名称 单位 合同量 本月完成量 开工至今累计完成量 机械成孔灌住桩 3262.00 m 承包商 (抛石碾压) (1134) 润华建设有限公司 单 位 块石 ? 920.00 水泥混凝土(C20) ? 1001.33 混凝土基础(C25) m? 1050.00 C砼20 29.3 10 混凝土基础(C25) m? 843.25 垫层C砼340 垫层C砼763 1010 碎石 ? 945.00 360 420 标段 四标(2#橡胶坝) 块石 ? 1000.00 800 1500 挡墙基础 m? 75.72 现浇砼挡墙强身 m? 111.62 非预应力钢筋 t 137.7 16 73.6 桩号 Z2+352.23,Z2+395.23 块石 m? 600.00 300 300 低发泡聚乙烯泡沫板 ? 390.00 100 100 密封膏止水 m 300.00 橡胶坝袋安装 个 1 人员 1号泵站及集水池 个 1 25人 临时工程 项 1 (数量) 挖淤泥 m? 2600.00 1000 2000 泵房基础开挖土方 m? 1000 1000 施工情况补充说明:机械成孔灌住桩变更为:抛石碾压。按合同工期约定工期计算,工期严重滞后。急需加快工程进度。 Construction scheme of Chapter 1.1 the integrated presentation as a programmatic document for guiding construction of the construction organization design to meet the request of tender documents to principles highlight the scientific nature, seriousness and feasibility, regulatory and guidance. According to about content and the company related engineering construction experience, on project management organization institutions set, labor plans arrangements, material supply arrangements, mechanical equipment configuration, main points part items engineering construction, duration guarantee measures, and quality, and security guarantee measures, guarantee safety, civilization construction, reduced nuisance, reduced pollution and noise of measures, do has detailed of deployment, to ensure the engineering quality, and high-speed, and security civilization, and environmental construction. 1.1.1 the establishment basis 1 tender document; 2 Summary of construction drawing and drawing, technical approval; 3 geological survey report, local weather conditions; 4 to the supply of materials; 5 construction-related laws, regulations and local regulations, compulsory provision of engineering construction, existing national, industry, regional Atlas of norms, procedures and standards; 7 company of the quality manual, environmental/occupational safety and Health Handbook and procedures document; 8 technology, funding, equipment and construction managers, labor and technical force rich construction and related engineering experience with good service and commitment to the company. 1.1.2.1 1.1.2 preparation of principles committed to all meet all the requirements and tender documents all commitments service-oriented, focus on customer satisfaction as the main evaluation, quality first, fully embodies the design style. 1.1.2.2 earnestly familiarity with drawing paper and understand the design philosophy, manifests the design intent, play to the company's overall advantage to achieve high quality, high speed, safety, and environmental protection construction, advanced technology, reducing the cost of. 1.1.2.3 around the quality objectives of the project, carried out in the quality control "test evaluation of separation, strengthen inspection, perfect means, process control," the 16-character guideline to ensure that eligibility criteria, on the basis of striving for excellence. 1.1.2.4 ensuring construction safety accident-free, environmentally friendly production and civilized construction, to achieve municipal "model safe and civilized construction site". 1.1.2.5 promotion, application construction of 10 new technologies and new materials, new techniques, new equipment and improve the level of project and construction management of modern scientific and technological content, declare a provincial construction technologies application and demonstration project. 1.1.3 preparation of Construction scheme of Chapter 1.1 the integrated presentation as a programmatic document for guiding construction of the construction organization design to meet the request of tender documents to principles highlight the scientific nature, seriousness and feasibility, regulatory and guidance. According to about content and the company related engineering construction experience, on project management organization institutions set, labor plans arrangements, material supply arrangements, mechanical equipment configuration, main points part items engineering construction, duration guarantee measures, and quality, and security guarantee measures, guarantee safety, civilization construction, reduced nuisance, reduced pollution and noise of measures, do has detailed of deployment, to ensure the engineering quality, and high-speed, and security civilization, and environmental construction. 1.1.1 the establishment basis 1 tender document; 2 Summary of construction drawing and drawing, technical approval; 3 geological survey report, local weather conditions; 4 to the supply of materials; 5 construction-related laws, regulations and local regulations, compulsory provision of engineering construction, existing national, industry, regional Atlas of norms, procedures and standards; 7 company of the quality manual, environmental/occupational safety and Health Handbook and procedures document; 8 technology, funding, equipment and construction managers, labor and technical force rich construction and related engineering experience with good service and commitment to the company. 1.1.2.1 1.1.2 preparation of principles committed to all meet all the requirements and tender documents all commitments service-oriented, focus on customer satisfaction as the main evaluation, quality first, fully embodies the design style. 1.1.2.2 earnestly familiarity with drawing paper and understand the design philosophy, manifests the design intent, play to the company's overall advantage to achieve high quality, high speed, safety, and environmental protection construction, advanced technology, reducing the cost of. 1.1.2.3 around the quality objectives of the project, carried out in the quality control "test evaluation of separation, strengthen inspection, perfect means, process control," the 16-character guideline to ensure that eligibility criteria, on the basis of striving for excellence. 1.1.2.4 ensuring construction safety accident-free, environmentally friendly production and civilized construction, to achieve municipal "model safe and civilized construction site". 1.1.2.5 promotion, application construction of 10 new technologies and new materials, new techniques, new equipment and improve the level of project and construction management of modern scientific and technological content, declare a provincial construction technologies application and demonstration project. 1.1.3 preparation of 襄垣县浊漳河东北阳段河道综合治理工程 施工形象进度月报表 (时间:2012年9月29日) 监理机构:长治市信誉民工程监理有限公司 项目负责人:吴西云 项目总监:张恵萍 主 送:襄垣县文华苑教育园区河道治理项目部:张囯强主任、宋海南副主任 施建刚业主施工现场代表。 scope other than unit package contents directly within the construction drawings of all civil works, installation. 1.1.4 used in this project the main norms and standard Atlas serial number name number 1 the architectural engineering construction quality approval standard GB 50300-2001 2 building ground foundation engineering construction quality approval standard GB masonry project construction quality approval standard GB 50202-2002 3 50203-2002 4 50204-2010 concrete structure project construction quality approval standard GB 5 project quality approval ... Steel parts of its steel to meet the relevant national standards on the basis of, also to meet the specification and design on mechanical properties of earthquake-resistant structures. For easy rebar supply reasonable, subcontractor selection 1-2. 2 steel raw materials testing steel comes into play, must verify that the certificate of quality of materials, which include: strength and reinforcement level, grade, grades, specifications, quantities, mechanical properties, chemical composition, process performance, order date, inspection seal, certificate number. Projects identified in the certificate is complete and accurate, listed mechanical properties, process performance and chemical composition in accordance with the corresponding technical standards, steel, model consistent with the procurement plan. Best steel quality certificate for the original, if when you copy, stamped seal of the original storage units. Steel comes into play, inspection and acceptance by batch, each issue of the same grade, the furnace tank, reinforced with the specifications, delivery status, and weight of not more than 60 tons for a second interview. Witness sampling by a supervising engineer, after passing the second interview and acceptance of supervision engineers to be used. 3 steel making 3.1 steel processing making Qian, Xia material table to by technician and foreman audit, and will steel processing Xia material table and design figure review, check Xia material table whether has errors missed, on each species steel to by Xia material table check whether reached design and specification requirements, after this two road check Hou, again by Xia material table made sample, trial qualified rear can batch making, processing good of steel semi-finished products to tone identifies, stacked neatly ordered. 3.2 when you need reinforcement replacement in construction, agreed with the consent of the design, and there is a written notification before substitution, shall not be an area of high-strength steel bars reinforcement replacement of low intensity. 3.3 bar surface cleaner, glue, grease, dirt, rust must be cleaned before use. 3.4 After straightening, the bars must not have local bending, small dead bent, wavy, its scars on the surface section of the reinforcement must not be greater than 5%. 3.5 steel according to the rebar sizes, diameters, lengths and quantities length match,
/
本文档为【综合治理工程形象进度表9月29】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索