为了正常的体验网站,请在浏览器设置里面开启Javascript功能!
首页 > 美国习惯用语03:说什么都左耳进右耳出 -(韦博分享)

美国习惯用语03:说什么都左耳进右耳出 -(韦博分享)

2018-10-03 24页 doc 94KB 3阅读

用户头像

is_421808

暂无简介

举报
美国习惯用语03:说什么都左耳进右耳出 -(韦博分享)美国习惯用语03:说什么都左耳进右耳出 -(韦博分享) breaking length, short break, minimize lap splices in order to save steel. 3.6 blanking length of steel bar according to the component size, thickness, bending length and hook to increase the adjustment value requirements into considerat...
美国习惯用语03:说什么都左耳进右耳出 -(韦博分享)
美国习惯用语03:说什么都左耳进右耳出 -(韦博分享) breaking length, short break, minimize lap splices in order to save steel. 3.6 blanking length of steel bar according to the component size, thickness, bending length and hook to increase the adjustment value requirements into consideration. 3.7 bending rebar bending machines. Process: preparatory work--dash-bending. Dash under different bending angle bending adjustments of deductions; at the end part with semicircular bend hook, the secant length 0.5d (d is diameter), crossed from the steel line to the sides. 4 bars before you binding reinforcement tie earnestly familiarity with drawing paper, check the feed table and design is consistent, carefully check the number of blank size, shape, and material table match, check the rear fastening can be carried out. Φ above 12 bar 20# galvanized iron wire, φ 12 following reinforcement 22# galvanized iron wire banding banding. 4.1 the Foundation beams and reinforcement of waterproof plate: ? binding order: cable ? ink pop-up panels, beams, walls, marked with paint, model, pitch ? wear steel and ...A5 steel engineering quality standard steel processing Shi its size allows deviation must meet Xia table requirements: steel processing Shi allows deviation and test method project allows deviation (mm) test method by force steel Shun length direction full length of net size ? 10 ruler check bent up steel of bent folding location ? 20 ruler check hoop reinforced of within net size +5 ruler check steel installation Shi, by force steel of varieties, and level, and specifications and number must meet design requirements. Steel installation location of allows deviation and test method project allows deviation (mm) test method lashing steel network long, and wide ? 10 ruler check mesh size ? 20 ruler volume continuous three document, take maximum value lashing steel skeleton long ? 10 ruler check wide, and high ? 5 ruler volume ends, middle the is, take maximum value by force steel spacing ? 10 ruler check row from ? 5 ruler check cover thickness based ? 10 ruler check column, and beam ? 5 ruler check Board , And wall, and Shell ? 3 ruler check lashing hoop reinforced, and horizontal steel spacing ? 20 ruler volume continuous three document, take maximum value steel bent beginning location 20 ruler check pre buried pieces center line location 5 ruler check level high poor +3,0 ruler and feeler check note: ? check pre buried pieces center line location Shi, along longitudinal, and cross two a direction volume measuring, and take which of larger value. II table of beam, Board Member the upper longitudinal reinforcement protection layer thickness of rate of 90% per cent and shall not exceed 1.5 times the size of deviations of the table. 1.4 template engineering the engineering for framework cut force wall structure, column, and cut force wall template used multilayer Board (see special construction programme), now poured roof, and stairs end of die and the Liang Mo are used high strength bamboo rubber Board, the template has 美国习惯用语03:说什么都左耳进右耳出 -,韦博分享, 美国习惯用语03:说什么都左耳进右耳出 -,韦博分享, 春天来了,Larry和李华到外面转转,享受春天的美景。他们会用到两个常用语:to catch something和open minded。 Larry: What wonderful spring weather! We should get out and enjoy it, Lihua. LH: 没错,咱们踏春去! Larry: There are a lot of music festivals around town these days. Would you be interested in catching an outdoor show somewhere? LH: Catch a show? "Catch"不是捕捉的意思吗? 怎么可能捕捉一个show呢? Larry: Not that kind of catch, Lihua. Here, the word "catch" means to go to attend something, like a show. LH: 哦,catch在这里不是“捕捉”,而是“参加某项活动”的意思。 To catch a show就 是去看一场演。 breaking length, short break, minimize lap splices in order to save steel. 3.6 blanking length of steel bar according to the component size, thickness, bending length and hook to increase the adjustment value requirements into consideration. 3.7 bending rebar bending machines. Process: preparatory work--dash-bending. Dash under different bending angle bending adjustments of deductions; at the end part with semicircular bend hook, the secant length 0.5d (d is diameter), crossed from the steel line to the sides. 4 bars before you binding reinforcement tie earnestly familiarity with drawing paper, check the feed table and design is consistent, carefully check the number of blank size, shape, and material table match, check the rear fastening can be carried out. Φ above 12 bar 20# galvanized iron wire, φ 12 following reinforcement 22# galvanized iron wire banding banding. 4.1 the Foundation beams and reinforcement of waterproof plate: ? binding order: cable ? ink pop-up panels, beams, walls, marked with paint, model, pitch ? wear steel and ...A5 steel engineering quality standard steel processing Shi its size allows deviation must meet Xia table requirements: steel processing Shi allows deviation and test method project allows deviation (mm) test method by force steel Shun length direction full length of net size ? 10 ruler check bent up steel of bent folding location ? 20 ruler check hoop reinforced of within net size +5 ruler check steel installation Shi, by force steel of varieties, and level, and specifications and number must meet design requirements. Steel installation location of allows deviation and test method project allows deviation (mm) test method lashing steel network long, and wide ? 10 ruler check mesh size ? 20 ruler volume continuous three document, take maximum value lashing steel skeleton long ? 10 ruler check wide, and high ? 5 ruler volume ends, middle the is, take maximum value by force steel spacing ? 10 ruler check row from ? 5 ruler check cover thickness based ? 10 ruler check column, and beam ? 5 ruler check Board , And wall, and Shell ? 3 ruler check lashing hoop reinforced, and horizontal steel spacing ? 20 ruler volume continuous three document, take maximum value steel bent beginning location 20 ruler check pre buried pieces center line location 5 ruler check level high poor +3,0 ruler and feeler check note: ? check pre buried pieces center line location Shi, along longitudinal, and cross two a direction volume measuring, and take which of larger value. II table of beam, Board Member the upper longitudinal reinforcement protection layer thickness of rate of 90% per cent and shall not exceed 1.5 times the size of deviations of the table. 1.4 template engineering the engineering for framework cut force wall structure, column, and cut force wall template used multilayer Board (see special construction programme), now poured roof, and stairs end of die and the Liang Mo are used high strength bamboo rubber Board, the template has breaking length, short break, minimize lap splices in order to save steel. 3.6 blanking length of steel bar according to the component size, thickness, bending length and hook to increase the adjustment value requirements into consideration. 3.7 bending rebar bending machines. Process: preparatory work--dash-bending. Dash under different bending angle bending adjustments of deductions; at the end part with semicircular bend hook, the secant length 0.5d (d is diameter), crossed from the steel line to the sides. 4 bars before you binding reinforcement tie earnestly familiarity with drawing paper, check the feed table and design is consistent, carefully check the number of blank size, shape, and material table match, check the rear fastening can be carried out. Φ above 12 bar 20# galvanized iron wire, φ 12 following reinforcement 22# galvanized iron wire banding banding. 4.1 the Foundation beams and reinforcement of waterproof plate: ? binding order: cable ? ink pop-up panels, beams, walls, marked with paint, model, pitch ? wear steel and ...A5 steel engineering quality standard steel processing Shi its size allows deviation must meet Xia table requirements: steel processing Shi allows deviation and test method project allows deviation (mm) test method by force steel Shun length direction full length of net size ? 10 ruler check bent up steel of bent folding location ? 20 ruler check hoop reinforced of within net size +5 ruler check steel installation Shi, by force steel of varieties, and level, and specifications and number must meet design requirements. Steel installation location of allows deviation and test method project allows deviation (mm) test method lashing steel network long, and wide ? 10 ruler check mesh size ? 20 ruler volume continuous three document, take maximum value lashing steel skeleton long ? 10 ruler check wide, and high ? 5 ruler volume ends, middle the is, take maximum value by force steel spacing ? 10 ruler check row from ? 5 ruler check cover thickness based ? 10 ruler check column, and beam ? 5 ruler check Board , And wall, and Shell ? 3 ruler check lashing hoop reinforced, and horizontal steel spacing ? 20 ruler volume continuous three document, take maximum value steel bent beginning location 20 ruler check pre buried pieces center line location 5 ruler check level high poor +3,0 ruler and feeler check note: ? check pre buried pieces center line location Shi, along longitudinal, and cross two a direction volume measuring, and take which of larger value. II table of beam, Board Member the upper longitudinal reinforcement protection layer thickness of rate of 90% per cent and shall not exceed 1.5 times the size of deviations of the table. 1.4 template engineering the engineering for framework cut force wall structure, column, and cut force wall template used multilayer Board (see special construction programme), now poured roof, and stairs end of die and the Liang Mo are used high strength bamboo rubber Board, the template has Larry: That's right! We could catch a rock concert. LH: 啊?摇滚演唱会?太吵了! Let's catch a classical music performance instead. 我们 去欣赏一场古典音乐。 Larry: Classical music? With music that boring and weather this nice, I'd surely fall asleep! LH: 听古典乐你会睡觉?真是没有艺术细胞! 好了,你还有什么主意? Larry: Well, we could always go catch a movie. There's a new action film that just came out. LH: Catch a movie? 看电影?可那是在室内啊,可惜了这么好的天气! Larry: That's OK. We can just enjoy the lovely weather - as we walk to the movie theater. LH: 可我不是很想看电影....Wait! I know! 我们去运动运动吧,I feel like catching a game of tennis. 去打网球吧! weight light, and Board site big, seams less, construction progress fast, support split easy and concrete forming behind layer beautiful, flat degrees good, can reached water concrete effect, reduce workers intensity, features. 1 material requiring more than 1.1 multi-layer plate thickness 12mm thickness, flexural design strength of not less than 12.5N/mm2, modulus of elasticity is not less than 3.2x103 N/mm2, resistance to flooding, soaked in water at room temperature 72h, no glue, surface wear and corrosion resistance, smooth deviation is less than 1.5mm. 1.2 reinforcement pipe selection φ 48 standard pipe, tube wall thickness uniform, and no crack, and Alice song not round not whole, defects; template top support with prefabricated 50x50 concrete support block, spacing for 600mm, long with wall wide; cut force wall template reinforcement ? 0.000 following with with φ 12 of on pulled screw rod with check water tablets, ? 0.000 above with on pulled screw Rod coat PVC tube, tube out wall surface 50mm/surface, on pulled screw Rod spacing @500*500. 1.3 steel pipe connection fittings, meet quality standards, no cracks, threads oil, without accusations, torsional flexibility, use annex "u"-shaped pins are in line with quality standards. 2 floor template support 2.1 floor template by laying bamboo plywood in double keel, keel for PHI 48 steel pipe, the keel to 50*100 wood, used in steel-tube scaffold system spans greater than 2 metres from the floor, using quick-dismantling system formwork, when span is greater than or equal to 4.0 meters, template by 0.25%L arch. 2.2 pavement layer template, began laying around, shut in the Middle, corner site template Latrun line alignment, and joist nailed down. 2.3 surface layer of wood glue banpu finished, carefully check that the bracket is a solid, smooth surface, in accordance with the quality requirements, and paste the seam tape on the template. 2.4 pad 50mm planks between the body and the floor, and the same floor connected whole, to enhance the overall stability of frame. 2.5 floor model and model top pressure beam side, seam clamps 5mm sponge and paper adhesive tape, to ensure construction quality of concrete corner site. Templates support 3.1 Liang Mo 3 beam cladding wood plastic is used as templates, stared blankly for long layout 50x100 beam along the beam direction, and erection of steel pipe supports. 3.2 beam formwork, when beam span greater than or equal to 6m, the girder arches at the end of 0.4%L. 3.3 side reinforcement beams, Latrun line alignment. 3.4 header height is less than 500mm, beam width is less than 250mm, and @ 900mm beam steel frame spacing, vertical spacing 900mm horizontal tube, beam is not added on the pull bolt, when beam >600, Leung added pull bolt @600mm. On the podium and some scaffolding, vertical and horizontal pole spacing is less than 900, step less than 1500, and scissors and sweep the pipe, beams and slabs bearing fasteners must be installed under ... 4.3 in the bench on the side panel breaking length, short break, minimize lap splices in order to save steel. 3.6 blanking length of steel bar according to the component size, thickness, bending length and hook to increase the adjustment value requirements into consideration. 3.7 bending rebar bending machines. Process: preparatory work--dash-bending. Dash under different bending angle bending adjustments of deductions; at the end part with semicircular bend hook, the secant length 0.5d (d is diameter), crossed from the steel line to the sides. 4 bars before you binding reinforcement tie earnestly familiarity with drawing paper, check the feed table and design is consistent, carefully check the number of blank size, shape, and material table match, check the rear fastening can be carried out. Φ above 12 bar 20# galvanized iron wire, φ 12 following reinforcement 22# galvanized iron wire banding banding. 4.1 the Foundation beams and reinforcement of waterproof plate: ? binding order: cable ? ink pop-up panels, beams, walls, marked with paint, model, pitch ? wear steel and ...A5 steel engineering quality standard steel processing Shi its size allows deviation must meet Xia table requirements: steel processing Shi allows deviation and test method project allows deviation (mm) test method by force steel Shun length direction full length of net size ? 10 ruler check bent up steel of bent folding location ? 20 ruler check hoop reinforced of within net size +5 ruler check steel installation Shi, by force steel of varieties, and level, and specifications and number must meet design requirements. Steel installation location of allows deviation and test method project allows deviation (mm) test method lashing steel network long, and wide ? 10 ruler check mesh size ? 20 ruler volume continuous three document, take maximum value lashing steel skeleton long ? 10 ruler check wide, and high ? 5 ruler volume ends, middle the is, take maximum value by force steel spacing ? 10 ruler check row from ? 5 ruler check cover thickness based ? 10 ruler check column, and beam ? 5 ruler check Board , And wall, and Shell ? 3 ruler check lashing hoop reinforced, and horizontal steel spacing ? 20 ruler volume continuous three document, take maximum value steel bent beginning location 20 ruler check pre buried pieces center line location 5 ruler check level high poor +3,0 ruler and feeler check note: ? check pre buried pieces center line location Shi, along longitudinal, and cross two a direction volume measuring, and take which of larger value. II table of beam, Board Member the upper longitudinal reinforcement protection layer thickness of rate of 90% per cent and shall not exceed 1.5 times the size of deviations of the table. 1.4 template engineering the engineering for framework cut force wall structure, column, and cut force wall template used multilayer Board (see special construction programme), now poured roof, and stairs end of die and the Liang Mo are used high strength bamboo rubber Board, the template has Larry: Well, you can't "catch" a game of tennis if you are playing it. If you are watching other people play, however, then you can say you are "catching" the game. LH: 哦,to catch something是强调被动地,不需要费力就可以享受的那种参与。如果自 己挥汗如雨地去打网球,就不能用catch, 可如果自己不用动,轻松地坐在一边看网球赛, 就可以说catch a game of tennis 了! 这样吧 Larry, 咱们去博物馆看艺术展,怎么样? Larry: Ah, I guess we could go to the museum... LH: 你好像不太情愿啊! Larry: Well, it's just that I had my mind set on going to that rock concert for awhile now. ****** LH: 真不明白,那么吵闹的摇滚乐,有什么好听的。 Larry: Come on, Lihua. I think you should be more open-minded when it comes to music. breaking length, short break, minimize lap splices in order to save steel. 3.6 blanking length of steel bar according to the component size, thickness, bending length and hook to increase the adjustment value requirements into consideration. 3.7 bending rebar bending machines. Process: preparatory work--dash-bending. Dash under different bending angle bending adjustments of deductions; at the end part with semicircular bend hook, the secant length 0.5d (d is diameter), crossed from the steel line to the sides. 4 bars before you binding reinforcement tie earnestly familiarity with drawing paper, check the feed table and design is consistent, carefully check the number of blank size, shape, and material table match, check the rear fastening can be carried out. Φ above 12 bar 20# galvanized iron wire, φ 12 following reinforcement 22# galvanized iron wire banding banding. 4.1 the Foundation beams and reinforcement of waterproof plate: ? binding order: cable ? ink pop-up panels, beams, walls, marked with paint, model, pitch ? wear steel and ...A5 steel engineering quality standard steel processing Shi its size allows deviation must meet Xia table requirements: steel processing Shi allows deviation and test method project allows deviation (mm) test method by force steel Shun length direction full length of net size ? 10 ruler check bent up steel of bent folding location ? 20 ruler check hoop reinforced of within net size +5 ruler check steel installation Shi, by force steel of varieties, and level, and specifications and number must meet design requirements. Steel installation location of allows deviation and test method project allows deviation (mm) test method lashing steel network long, and wide ? 10 ruler check mesh size ? 20 ruler volume continuous three document, take maximum value lashing steel skeleton long ? 10 ruler check wide, and high ? 5 ruler volume ends, middle the is, take maximum value by force steel spacing ? 10 ruler check row from ? 5 ruler check cover thickness based ? 10 ruler check column, and beam ? 5 ruler check Board , And wall, and Shell ? 3 ruler check lashing hoop reinforced, and horizontal steel spacing ? 20 ruler volume continuous three document, take maximum value steel bent beginning location 20 ruler check pre buried pieces center line location 5 ruler check level high poor +3,0 ruler and feeler check note: ? check pre buried pieces center line location Shi, along longitudinal, and cross two a direction volume measuring, and take which of larger value. II table of beam, Board Member the upper longitudinal reinforcement protection layer thickness of rate of 90% per cent and shall not exceed 1.5 times the size of deviations of the table. 1.4 template engineering the engineering for framework cut force wall structure, column, and cut force wall template used multilayer Board (see special construction programme), now poured roof, and stairs end of die and the Liang Mo are used high strength bamboo rubber Board, the template has breaking length, short break, minimize lap splices in order to save steel. 3.6 blanking length of steel bar according to the component size, thickness, bending length and hook to increase the adjustment value requirements into consideration. 3.7 bending rebar bending machines. Process: preparatory work--dash-bending. Dash under different bending angle bending adjustments of deductions; at the end part with semicircular bend hook, the secant length 0.5d (d is diameter), crossed from the steel line to the sides. 4 bars before you binding reinforcement tie earnestly familiarity with drawing paper, check the feed table and design is consistent, carefully check the number of blank size, shape, and material table match, check the rear fastening can be carried out. Φ above 12 bar 20# galvanized iron wire, φ 12 following reinforcement 22# galvanized iron wire banding banding. 4.1 the Foundation beams and reinforcement of waterproof plate: ? binding order: cable ? ink pop-up panels, beams, walls, marked with paint, model, pitch ? wear steel and ...A5 steel engineering quality standard steel processing Shi its size allows deviation must meet Xia table requirements: steel processing Shi allows deviation and test method project allows deviation (mm) test method by force steel Shun length direction full length of net size ? 10 ruler check bent up steel of bent folding location ? 20 ruler check hoop reinforced of within net size +5 ruler check steel installation Shi, by force steel of varieties, and level, and specifications and number must meet design requirements. Steel installation location of allows deviation and test method project allows deviation (mm) test method lashing steel network long, and wide ? 10 ruler check mesh size ? 20 ruler volume continuous three document, take maximum value lashing steel skeleton long ? 10 ruler check wide, and high ? 5 ruler volume ends, middle the is, take maximum value by force steel spacing ? 10 ruler check row from ? 5 ruler check cover thickness based ? 10 ruler check column, and beam ? 5 ruler check Board , And wall, and Shell ? 3 ruler check lashing hoop reinforced, and horizontal steel spacing ? 20 ruler volume continuous three document, take maximum value steel bent beginning location 20 ruler check pre buried pieces center line location 5 ruler check level high poor +3,0 ruler and feeler check note: ? check pre buried pieces center line location Shi, along longitudinal, and cross two a direction volume measuring, and take which of larger value. II table of beam, Board Member the upper longitudinal reinforcement protection layer thickness of rate of 90% per cent and shall not exceed 1.5 times the size of deviations of the table. 1.4 template engineering the engineering for framework cut force wall structure, column, and cut force wall template used multilayer Board (see special construction programme), now poured roof, and stairs end of die and the Liang Mo are used high strength bamboo rubber Board, the template has LH: Open-minded? 什么意思? Larry: To be open-minded means to be open to new ideas or experiences. LH: I get it. To be open minded就是宽容,思想开放的意思。这么说起来,Larry, 你就 不是个open-minded,思想开放,勇于尝试的人。 Larry: No way! I am very open-minded, Lihua. I've done all sorts of crazy things with you that I wouldn't normally do. LH:比如呢? Larry: Well, like playing Mahjong with your friends. Even though I had to learn from scratch, I still kept an open mind and tried to have fun. LH: 哈哈,你打麻将那次还真是出丑呢! Larry: And I went camping last year with your friends. And even though it was cold and raining the entire time, I was open-minded and tried to enjoy myself. LH: 好啦,我承认你是个优秀的男朋友! weight light, and Board site big, seams less, construction progress fast, support split easy and concrete forming behind layer beautiful, flat degrees good, can reached water concrete effect, reduce workers intensity, features. 1 material requiring more than 1.1 multi-layer plate thickness 12mm thickness, flexural design strength of not less than 12.5N/mm2, modulus of elasticity is not less than 3.2x103 N/mm2, resistance to flooding, soaked in water at room temperature 72h, no glue, surface wear and corrosion resistance, smooth deviation is less than 1.5mm. 1.2 reinforcement pipe selection φ 48 standard pipe, tube wall thickness uniform, and no crack, and Alice song not round not whole, defects; template top support with prefabricated 50x50 concrete support block, spacing for 600mm, long with wall wide; cut force wall template reinforcement ? 0.000 following with with φ 12 of on pulled screw rod with check water tablets, ? 0.000 above with on pulled screw Rod coat PVC tube, tube out wall surface 50mm/surface, on pulled screw Rod spacing @500*500. 1.3 steel pipe connection fittings, meet quality standards, no cracks, threads oil, without accusations, torsional flexibility, use annex "u"-shaped pins are in line with quality standards. 2 floor template support 2.1 floor template by laying bamboo plywood in double keel, keel for PHI 48 steel pipe, the keel to 50*100 wood, used in steel-tube scaffold system spans greater than 2 metres from the floor, using quick-dismantling system formwork, when span is greater than or equal to 4.0 meters, template by 0.25%L arch. 2.2 pavement layer template, began laying around, shut in the Middle, corner site template Latrun line alignment, and joist nailed down. 2.3 surface layer of wood glue banpu finished, carefully check that the bracket is a solid, smooth surface, in accordance with the quality requirements, and paste the seam tape on the template. 2.4 pad 50mm planks between the body and the floor, and the same floor connected whole, to enhance the overall stability of frame. 2.5 floor model and model top pressure beam side, seam clamps 5mm sponge and paper adhesive tape, to ensure construction quality of concrete corner site. Templates support 3.1 Liang Mo 3 beam cladding wood plastic is used as templates, stared blankly for long layout 50x100 beam along the beam direction, and erection of steel pipe supports. 3.2 beam formwork, when beam span greater than or equal to 6m, the girder arches at the end of 0.4%L. 3.3 side reinforcement beams, Latrun line alignment. 3.4 header height is less than 500mm, beam width is less than 250mm, and @ 900mm beam steel frame spacing, vertical spacing 900mm horizontal tube, beam is not added on the pull bolt, when beam >600, Leung added pull bolt @600mm. On the podium and some scaffolding, vertical and horizontal pole spacing is less than 900, step less than 1500, and scissors and sweep the pipe, beams and slabs bearing fasteners must be installed under ... 4.3 in the bench on the side panel breaking length, short break, minimize lap splices in order to save steel. 3.6 blanking length of steel bar according to the component size, thickness, bending length and hook to increase the adjustment value requirements into consideration. 3.7 bending rebar bending machines. Process: preparatory work--dash-bending. Dash under different bending angle bending adjustments of deductions; at the end part with semicircular bend hook, the secant length 0.5d (d is diameter), crossed from the steel line to the sides. 4 bars before you binding reinforcement tie earnestly familiarity with drawing paper, check the feed table and design is consistent, carefully check the number of blank size, shape, and material table match, check the rear fastening can be carried out. Φ above 12 bar 20# galvanized iron wire, φ 12 following reinforcement 22# galvanized iron wire banding banding. 4.1 the Foundation beams and reinforcement of waterproof plate: ? binding order: cable ? ink pop-up panels, beams, walls, marked with paint, model, pitch ? wear steel and ...A5 steel engineering quality standard steel processing Shi its size allows deviation must meet Xia table requirements: steel processing Shi allows deviation and test method project allows deviation (mm) test method by force steel Shun length direction full length of net size ? 10 ruler check bent up steel of bent folding location ? 20 ruler check hoop reinforced of within net size +5 ruler check steel installation Shi, by force steel of varieties, and level, and specifications and number must meet design requirements. Steel installation location of allows deviation and test method project allows deviation (mm) test method lashing steel network long, and wide ? 10 ruler check mesh size ? 20 ruler volume continuous three document, take maximum value lashing steel skeleton long ? 10 ruler check wide, and high ? 5 ruler volume ends, middle the is, take maximum value by force steel spacing ? 10 ruler check row from ? 5 ruler check cover thickness based ? 10 ruler check column, and beam ? 5 ruler check Board , And wall, and Shell ? 3 ruler check lashing hoop reinforced, and horizontal steel spacing ? 20 ruler volume continuous three document, take maximum value steel bent beginning location 20 ruler check pre buried pieces center line location 5 ruler check level high poor +3,0 ruler and feeler check note: ? check pre buried pieces center line location Shi, along longitudinal, and cross two a direction volume measuring, and take which of larger value. II table of beam, Board Member the upper longitudinal reinforcement protection layer thickness of rate of 90% per cent and shall not exceed 1.5 times the size of deviations of the table. 1.4 template engineering the engineering for framework cut force wall structure, column, and cut force wall template used multilayer Board (see special construction programme), now poured roof, and stairs end of die and the Liang Mo are used high strength bamboo rubber Board, the template has Larry: Of course I am! And I'm not close-minded. LH: Close-minded? 我知道了,一定是open-minded的反义词,就是思想保守的。对 不对? Larry: That's right. You shouldn't be so close-minded to this rock concert thing. LH: 那好,我们来个妥协。咱们先去看博物馆看艺术展,然后再去听摇滚乐,怎么样?我够 open-minded了吧? Larry: Great! Let's go! 今天李华学了两个常用语,一个是to catch something,意思是“观看观赏”。另一个是 open-minded,意思是“思想开放的,肯接受新鲜事物的”。 美国习惯用语03:说什么都左耳进右耳出 -,韦博分享, breaking length, short break, minimize lap splices in order to save steel. 3.6 blanking length of steel bar according to the component size, thickness, bending length and hook to increase the adjustment value requirements into consideration. 3.7 bending rebar bending machines. Process: preparatory work--dash-bending. Dash under different bending angle bending adjustments of deductions; at the end part with semicircular bend hook, the secant length 0.5d (d is diameter), crossed from the steel line to the sides. 4 bars before you binding reinforcement tie earnestly familiarity with drawing paper, check the feed table and design is consistent, carefully check the number of blank size, shape, and material table match, check the rear fastening can be carried out. Φ above 12 bar 20# galvanized iron wire, φ 12 following reinforcement 22# galvanized iron wire banding banding. 4.1 the Foundation beams and reinforcement of waterproof plate: ? binding order: cable ? ink pop-up panels, beams, walls, marked with paint, model, pitch ? wear steel and ...A5 steel engineering quality standard steel processing Shi its size allows deviation must meet Xia table requirements: steel processing Shi allows deviation and test method project allows deviation (mm) test method by force steel Shun length direction full length of net size ? 10 ruler check bent up steel of bent folding location ? 20 ruler check hoop reinforced of within net size +5 ruler check steel installation Shi, by force steel of varieties, and level, and specifications and number must meet design requirements. Steel installation location of allows deviation and test method project allows deviation (mm) test method lashing steel network long, and wide ? 10 ruler check mesh size ? 20 ruler volume continuous three document, take maximum value lashing steel skeleton long ? 10 ruler check wide, and high ? 5 ruler volume ends, middle the is, take maximum value by force steel spacing ? 10 ruler check row from ? 5 ruler check cover thickness based ? 10 ruler check column, and beam ? 5 ruler check Board , And wall, and Shell ? 3 ruler check lashing hoop reinforced, and horizontal steel spacing ? 20 ruler volume continuous three document, take maximum value steel bent beginning location 20 ruler check pre buried pieces center line location 5 ruler check level high poor +3,0 ruler and feeler check note: ? check pre buried pieces center line location Shi, along longitudinal, and cross two a direction volume measuring, and take which of larger value. II table of beam, Board Member the upper longitudinal reinforcement protection layer thickness of rate of 90% per cent and shall not exceed 1.5 times the size of deviations of the table. 1.4 template engineering the engineering for framework cut force wall structure, column, and cut force wall template used multilayer Board (see special construction programme), now poured roof, and stairs end of die and the Liang Mo are used high strength bamboo rubber Board, the template has
/
本文档为【美国习惯用语03:说什么都左耳进右耳出 -(韦博分享)】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索