Page 1 of 33
Curriculum Vitae of Charlie Chong updated on 2012February
1.0 Personal statistic.
Name : Chong Chin Chan
Date of birth : October 1958
Nationality : Malaysian
Marital status : Married
Language Spoken : English, Malay, Indonesian, Chinese Mandarin, Cantonese,
Language written : English, Malay, Chinese and Indonesian.
Contact phone no. : 607-6622619(Home) 86-13641941529 (Mobile phone)
Availability : Please Call (86) 13641941529
Email : charliechong@qq.com
Summary of Experiences:
Undersign has been working in the oil and gas industries both onshore and offshore fabrication
works with responsibility for approximately 23 years. Currently, work as a surveyor at DNV Energy
Shanghai, PR China, providing inspection and certification services to derrick fabrications, offshore
structures, pressure vessels and equipments works.
Currently and for the past 7/8 years major involvements are inspection and fabrication surveillances
of Ultra Deepsea Derrick for National Oilwell Varco Shanghai and Derrick tools for Aker Solutions.
Other experiences encompassing onshore pipeline; initially at PGUP II for Petronas (750KM) later
for jetty loading facilities, Shell Refinery Port Dickson and MPP-DT pipeline for Petronas-Shell
joint venture (140KM). Offshore pipeline experiences were also extensive mostly in Chinese water.
Undersign is actively involve in offshore platform fabrication and Bolted Drilling plants works
previously as QC inspectors, Senior inspector, Quality Supervisor and currently as DNV Surveyor.
Expertise acquired may be roughly summarized as:
1. Pipeline transmission laying, construction and CP installation.
2. Offshore platform and jacket fabrication and installation.
3. Process piping fabrication and installation.
Page 2 of 33
Curriculum Vitae of Charlie Chong updated on 2012February
4. Welding inspection and technology.
5. Painting inspection and corrosion monitoring.
6. Bolted Drill Rig fabrication.
Undersign is familiar with following standards and codes requirements, among others:
Shell/Petronas DEP/PTS L2-2/3, General Pipeline and Material & Corrosion, API RP2A WSD, API2B,
API2H, API Spec 6A Specification for Wellhead and Christmas Tree Equipment, API Spec. 4F, Specification
for Drilling and Well Servicing Structures, AWS D1.1-96, NACE RP001, NACE MR01-75, API RP14E, API
1104, ANSI B31.2/31.4/31.8, ASME section II/V/VII/IX, SSPC specs, NFPA 70, API RP 500B, DNV RP
B401 , BS 7361 and DNV-OS-F101 (2000), AISC codes. DNV Offshore Class rules. China National GB
Specifications and CNPC SY Specifications
2.0 Professional attainment.
a. CQE-Certified Quality Engineer by American Society for Quality Control, Milwaukee, WI,
USA.
b. MICorr-Professional member of Institute of Corrosion, Leighton Buzzard, Beds, UK.
c. SenAWeldI-Senior associate of The Welding Institute, Arbington, UK.
d. MInstNDT-Member of the British Institute of Non-Destructive Testing, Northampton, UK.
3.0 Technical certification.
a. ASNT certified NDT level III (MT, DP, RT, and LT) by American Society for Non Destructive
Testing, Columbus, OH, USA. Certificate #72917.
http://www.asnt.org/certification/cert/certdetail.cfm?id=72917
b. ACCP certified NDT level III (MT, DP, RT) by American Society for Non Destructive Testing,
Columbus, OH, USA. Certificate #72917.
http://www.asnt.org/certification/cert/certdetail.cfm?id=72917
c. DNV qualified SNT-TC-1A Level II (UT)
d. NACE certified Senior Corrosion Technologist by National Association of Corrosion Engineer,
Houston, TX, USA. Certificate # 4325.
Click Link
http://web.nace.org/ContactResources/Default.aspx?id=dc29493c-60b2-db11-a8c7-0017a44669
4e
e. EWF certified European Welding Inspector level III by European Welding Federation.
Certificate # EWI3/GB/00752.
f. TWI registered Senior Welding Inspector by the Welding Institute, Arbington, UK. Registration
# 618.
g. CSWIP/PCN Senior Welding Inspector grade 3.1 & 3.2. Radiographic Interpreter 3.4 (reference
no. W05210, SW02528 and A09003621763).
4.0 Membership of technical societies.
a. Member of NACE.
b. Member of ASQC.
Page 3 of 33
Curriculum Vitae of Charlie Chong updated on 2012February
c. Member of BInstNDT.
d. Member of AWS.
e. Member of ASNT.
f. Professional Member of Icorr.
g. Member of WJS.
5.0 Academic qualification.
a. Diploma in Ferrous Metallurgy awarded by Material Engineering Institute, ASM, OH, USA.
b. Certificate in Civil & Municipal Engineering awarded by British Institute of Engineering
Technology.
c. Certificate in Mechanical Engineering awarded by City & Guild, London, UK.
d. GCE ‘A’ level awarded by Cambridge University LES, UK.
6.0 Safety courses.
a. Occupational safety and health management course organized by NIOSH, National Institute of
Occupational Safety & Health.
b. Safety Workshop organized by Saipem SA-Exxon/Mobil
c. First Aid Course Organized by Malaysian Red Crescent Society.
Note: The contact persons quoted as references under each work experiences were correct at time of
job involvements. The telephone or email may not be able to reach them by now.
Page 4 of 33
Curriculum Vitae of Charlie Chong updated on 2012February
7.0 Work experiences.
Following are brief description of undersign employment history and related work experiences and
responsibility.
7.1
Employment period : 2006 September - To date
Employer : Det Norske Veritas AS Shanghai Station, China.
Position : Surveyor.
Client : NOV Shanghai / Nabors / Perstorp Formox AB
Project : Ultra-deepwater drillship derrick construction and fabrication.
: Land base drilling rigs.
: DNV 2.7-1/2/3 Offshore Containers.
: Sour service assessment of offshore facilities.
Location : China.
Brief description:
Work as a surveyor at DNV Energy Shanghai, PR China, providing inspection and certification
services to ultra-deep water offshore drillship derrick fabrication works. The applicable codes and
standards were;
- API Spec 4F “Spec. for Drilling and Well Servicing Structures” 2nd Edition.
- API 6A “API Spec 6A Specification for Wellhead and Christmas Tree Equipment”.
- AWS D1.1 Welding of Steel Structure 2008.
- AISC Manual of steel construction, 13th editions.
- DNV Offshore Standard DNV-0S-El0 1 "Drilling Plant", October 2008.
- DNV Offshore Standard DNV-0S-C101 "Design of Offshore Steel Structures, General (LRFD
method)", April 2008.
- NACE MR01-75
- SSPC codes.
- Sour oil field operational assessment (Bohai Oil Field for Major Operator – Platform operation
compliance assessment to API RP49 & API RP55.)
Completed Derrick projects;
- Blackford Dolphin.
- DSME I to DSME V (5 derricks)
- Gazflot I and Gazflot II (2 derricks)
- HHI-I, HHI H2228 and HHI H2229 (3 derricks)
- ODFJELL-I and ODFJELL-II (2 derricks)
- Sea Dragon I and Sea Dragon II ( 2 derricks)
- DSME ODEbrecht 4.
- HHI Noble I & II (2 derricks).
Page 5 of 33
Curriculum Vitae of Charlie Chong updated on 2012February
Onshore Drill Rig
- Nabors Drilling for NDUSA Project.
- NDC Dubai drilll rig at Baoji Yard.
On Going Project as on February 2012.
Ongoing Derrick project; ( as on February 2012)
- HHI Drillship Noble 2505
- HHI Drillship Noble 2506
- HHI Drillship Noble 2507
- HHI DWDS1 for Fred Oslen Energy
- PDC5 & PDC6 for Pacific Drilling.
- Atwood
- Ocean Rig 5/6
- Seadrill 6
On Going Chemical plant pressure vessel projects;
- Perstop Project 148
H2S Oilfield Assessment Project;
- Sour oil field operational assessment (Bohai Oil Field for Major Operator – Platform operation
compliance assessment to API RP49 & API RP55 to COOSO requirements.)
Responsibility & Job involved:
Involved in derrick fabrication surveillance.
Interpretation of radiographic films.
HP piping fabrication inspections.
Reviewed and approval of quality control and assurance procedures.
Reviewed and approval of Pre-commissioning and Commissioning procedures.
Conducting material receiving/verification inspection.
Welding inspection for dimension, fit-up, visual for structures and piping.
Perform process and system audits.
Establishing NDE requirements and interpretation of codes and project specifications.
Reviewed of NDE reports and NDE cross checking.
Perform facility safety surveys.
Perform coating inspection, adhesion testing and holiday testing.
Conducting fabrication safety survey.
Coating and painting qualifications and approvals.
Material selections and approval for project implementations.
AISI A4130 high pressure piping with NACE MR01-75 compliances.
Page 6 of 33
Curriculum Vitae of Charlie Chong updated on 2012February
Material qualification Norsok Standard M-630 Ed5 on MDS D43 Duplex.
Applicable codes & standards.
Undersign is familiar with following standards and codes requirements, among others:
AWS D1.1-96, NACE MR01-75, ANSI B31.3, ASME section IX, API Spec 4F “Spec. for
Drilling and Well Servicing Structures” 2nd Edition. AWS D1.1 Welding of Steel Structure 2006.
AISC Manual of steel construction, 13th editions. DNV Offshore Standard DNV-0s-El0 1
"Drilling Plant", October 2006. DNV Offshore Standard DNV-0s-C101 "Design of Offshore
Steel Structures, General (LRFD method)", April 2004, API RP2A WSD, API2B, API2H, AWS
D1.1-96, NACE RP001, NACE MR01-75, API RP14E, API 1104, ANSI B31.2/31.4/31.8,
ASME section II/V/VII/IX, SSPC specs, NFPA 70, API RP 500B, DNV RP B401 , BS 7361 and
DNV-OS-F101 (2000), NACE TPC,DNV RP B401 and BS 7361, DNV B101, DNV C401, DNV
E101, DNV RP-F103, DNV RP-B403, Norsok standard in general.
References:
Mr. YP Tee. DNV Energy Country Manager 86-(0)21-62788086 yak.peik.tee@dnv.com, Mr. Bide
Alford NOV Shanghai Quality Director bide.alford@nov.com. Perstorp Formox AB Mr. Erik
Timander Erik.Timander@perstorp.com, Pan Chien CHIEN.Pan@conocophillips.com
Blackford Dolphin.
Page 7 of 33
Curriculum Vitae of Charlie Chong updated on 2012February
DSME Discoverer Clear Leader.
DSME Discoverer Americas.
Page 8 of 33
Curriculum Vitae of Charlie Chong updated on 2012February
ODFJell Deepsea Atlantic.
Page 9 of 33
Curriculum Vitae of Charlie Chong updated on 2012February
ODFJell Deepsea Stavanger
Gazflot-I
Page 10 of 33
Curriculum Vitae of Charlie Chong updated on 2012February
Gazflot-II
HHI Deepwater Champion.
Page 11 of 33
Curriculum Vitae of Charlie Chong updated on 2012February
Petrobras HHI Deepsea Metro-I
Petrobras HHI Deepsea Metro-II
Page 12 of 33
Curriculum Vitae of Charlie Chong updated on 2012February
7.2
Employment period : 2005 Sept – 2006 September.
Employer : Det Norske Veritas AS Shanghai Station, China.
Position : PQMS / Surveyor.
Project : Changbei Gas Development Project
Clients : CNPC/ SCEPCO, Shell China
Location : China.
Brief description:
Work as a Inspector / Surveyor in DNV Shanghai, PR China, providing PQMS inspection for CPC /
Shell JV at Changbei Gas Development Project. The project was a joint venture between China
National Petroleum Corporation (CNPC) and Shell China Exploration & Production Company Ltd.
(SCEPCO) to explore and develop gas resources at Changbei Block which will supply 3.0 bcm/yr of
natural gas during the plateau period.
Responsibility & Job involved:
Involved in PQMS Project Quality Management Services for main pipeline and networks
collecting pipelines and gas stations.
Establishing of coordination / communications with CNPC/SCEPCO and Main Contractors on
QA matters and field inspections.
Supervisory involvements on field inspection performed of Clients’ Inspector of Local
Inspection Agency.
Applicable codes & standards.
Undersign is familiar with following standards and codes requirements, among others:
Shell DEP, AWS D1.1-96, NACE RP001, NACE MR01-75, API 1104, ANSI B31.2/31.4/31.8,
ASME section II/V/VII/IX, SSPC specs, China National GB specification and CNPC SY
specifications, API RP2A WSD, API2B, API2H, AWS D1.1-96, NACE RP001, NACE
MR01-75, API RP14E, API 1104, ANSI B31.2/31.4/31.8, ASME section II/V/VII/IX, SSPC
specs, NFPA 70, API RP 500B, DNV RP B401 , BS 7361 and DNV-OS-F101 (2000), NACE
TPC,DNV RP B401 and BS 7361, DNV B101, DNV C401, DNV E101, DNV RP-F103, DNV
RP-B403.
References:
Mr. YP Tee. DNV Offshore Services Manager 86-(0)21-62788086 yak.peik.tee@dnv.com. Mr. Tan
Heng Lee, Lead QA Engineer Heng-Lee.Tan@shell.com
Page 13 of 33
Curriculum Vitae of Charlie Chong updated on 2012February
Shell SCEPCO/CNPC Changbei Gas Development Project: The project used a combination of 2km
long single and dual-lateral barefoot horizontal well drilled from surface location cluster.
7.3
Employment period : 2003 January – 2005 September.
Employer : Det Norske Veritas AS Shanghai Station, China.
Position : Surveyor / Corrosion Specialist.
Project : CNOOC Chunxiao Gas Field Development Project
Location : China.
Brief description:
Work as a surveyor in DNV Shanghai, PR China, providing inspection and 3rd party certification
services to Chunxiao Gas Field Development Project. The field is located in Donghai, 300KM off
Zhou Shan. It consisted of a Central Processing Platform and 2 Well Head Platforms and an Onshore
Collecting Terminal DFTS. The gas produced was collected by the CHX CEP collecting platform
and transferred to the Chunxiao via 300KM API 5LX56 sub-sea gas line.
Page 14 of 33
Curriculum Vitae of Charlie Chong updated on 2012February
Responsibility & Job involved:
Involved in topside fabrication surveillance.
Involved in 300KM of offshore Sub-sea pipeline surveillance.
Pipe manufacturing inspection and pipe coating inspection.
Interpretation of radiographic films
Reviewed and approval of quality control and assurance procedures.
Reviewed and approval of Pre-commissioning and Commissioning procedures.
Conducting material receiving/verification inspection.
Welding inspection for dimension, fit-up, visual for structures and piping.
Witnessing WQT & WPQT for CS/SS/Duplex material.
Perform process and system audits.
Establishing NDE requirements and interpretation of codes and project specifications.
Establishing and approval of project painting and CP project specifications.
Reviewed of NDE reports and NDE cross checking.
Perform facility safety surveys.
Perform coating inspection, adhesion testing and holiday testing.
Conducting fabrication safety survey.
Painting and lining qualification testing and inspection.
3rd party inspection and verification of sacrificial anode to DNV RP B401 & BS 7361.
Applicable codes & standards.
Undersign is familiar with following standards and codes requirements, among others:
API RP2A WSD, API2B, API2H, AWS D1.1-96, NACE RP001, NACE MR01-75, API RP14E,
API 1104, ANSI B31.2/31.4/31.8, ASME section II/V/VII/IX, SSPC specs, NFPA 70, API RP
500B, DNV RP B401 , BS 7361 and DNV-OS-F101 (2000), NACE TPC,DNV RP B401 and BS
7361, DNV B101, DNV C401, DNV E101, DNV RP-F103, DNV RP-B403.
References:
Mr. YP Tee. DNV Offshore Services Manager 86-(0)21-62788086 yak.peik.tee@dnv.com.
Page 15 of 33
Curriculum Vitae of Charlie Chong updated on 2012February
CNOOC CHX CEP /TWT WHPA
CNOOC CHX WHPA
Page 16 of 33
Curriculum Vitae of Charlie Chong updated on 2012February
7.4
Employment period : December 2001 to November 2002
Employer : Det Norske Veritas AS Shanghai Station, China.
Position : Surveyor.
Project : CNOOC DF1-1 Oil & Gas Field Development Project
Location : China.
Brief description:
Work as a surveyor in DNV Shanghai, PR China, providing inspection and 3rd party certification
services to DF1-1 Gas Field Development Project. The field is located in Beibu Bay, 110KM off
Hainan Island. It consisted of a Central Processing Platform and 3 Well Head Platforms and an
Onshore Collecting Terminal DFTS. The gas produced was collected by the DF1-1 CEP collecting
platform and transferred to the Hainan Island via 110KM 22” API 5LX56 sub-sea gas line. There
was also a parallel sub-sea cable from the mainland to provide power to offshore consumers.
Responsibility & Job involved:
Involved in topside fabrication surveillance.
Involved in 103KM of offshore Sub-sea pipeline surveillance.
Pipe manufacturing inspection and pipe coating inspection.
Interpretation of radiographic films
Interpretation & evaluating of RD-Tech automated UT systems on Serimer Dasa Saturnax-5
pipeline welding.
Reviewed and approval of quality control and assurance procedures.
Reviewed and approval of Pre-commissioning and Commissioning procedures.
Conducting material receiving/verification inspection.
Welding inspection for dimension, fit-up, visual for structures and piping.
Witnessing WQT & WPQT for CS/SS/Duplex material.
Perform process and system audits.
Establishing NDE requirements and interpretation of codes and project specifications.
Reviewed of NDE reports and NDE cross checking.
Perform facility safety surveys.
Perform coating inspection, adhesion testing and holiday testing.
Conducting fabrication safety survey.
3rd party inspection and verification of sacrificial anode to DNV RP B401 & BS 7361.
Applicable codes & standards.
Undersign is familiar with following standards and codes requirements, among others:
API RP2A WSD, API2B, API2H, AWS D1.1-96, NACE RP001, NACE MR01-75, API RP14E,
API 1104, ANSI B31.2/31.4/31.8, ASME section II/V/VII/IX, SSPC specs, NFPA 70, API RP
500B, DNV RP B401 , BS 7361 and DNV-OS-F101 (2000), NACE TPC,DNV RP B401 and BS
7361, DNV B101, DNV C401, DNV E101, DNV RP-F103, DNV RP-B403.
References:
Page 17 of 33
Curriculum Vitae of Charlie Chong updated on 2012February
Mr. YP Tee. DNV Offshore Services Manager 86-(0)21-62788086 yak.peik.tee@dnv.com.
CNOOC Dongfang 1-1
Page 18 of 33
Curriculum Vitae of Charlie Chong updated on 2012February
Offshore pipeline installation for DF1-1
7.5
Employment period : May 1999 to December 2001
Employer : Det Norske Veritas AS Shanghai Station, China.
Position : Surveyor / NDT Specialist.
Project : CNOOC QHD 32-6 Field Development Project
Location : China.
Brief description:
Work as a surveyor in DNV Shanghai, PR China, providing inspection and 3rd party certification
services to QHD 32-6 Field Development Project. The field is located in Bohai Bay off Tangshan
City. It consisted of 6 production platforms and a FPSO. The project was a joint venture between
Arco, Texaco and CNOOC.
Responsibility & Job involved:
Involved in topside and jacket fabrication surveillance.
Involve in the reviewed and approval of raiser tie-in procedures.
Involved in the offshore installation.
Cathodic protection testing and installations.
Coating and internal lining inspections.
Material qualification testing for H2S services in conformance with NACE MR01-75.
Page 19 of 33
Curriculum Vitae of Charlie Chong updated on 2012February
Reviewed and approval of quality control and assurance procedures.
Reviewed and approval of Pre-commissioning and Commissioning procedures.
Conducting material receiving/verification inspection.
Conducting equipment’s receiving, MCC, NLT, pre-commissioning and commissioning works.
Pre-commissioning & commissioning of process, electrical and instrument systems.
Participated in systems’ commissioning.
Welding inspection for dimension, fit-up, vi