为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

铁路基础设施(英文简介)

2019-04-06 12页 doc 60KB 23阅读

用户头像

is_624976

暂无简介

举报
铁路基础设施(英文简介)Introduction Track is the base upon which the railway runs.  To give a train a good ride, the track alignment must be set to within a millimeter of the design.  Track design and construction is part of a complex and multi-disciplinary engineering science involving ...
铁路基础设施(英文简介)
Introduction Track is the base upon which the railway runs.  To give a train a good ride, the track alignment must be set to within a millimeter of the design.  Track design and construction is part of a complex and multi-disciplinary engineering science involving earthworks, steelwork, timber and suspension systems - the infrastructure of the railway.  Many different systems exist throughout the world and there are many variations in their performance and maintenance.  This page looks at the basics of infrastructure and track design and construction with drawings, photos and examples from around the world.  Some information was contributed by Dan McNaughton, Simon Lowe and Mike Brotzman. Contents Background - Basic Construction - The Sub-Structure - Ballast - Track - Sleepers (Ties) - Rails - Rail Welding - Gauge - Modern Track Forms - Ballasted vs Non-Ballasted Track - Structures - Gauging - Monuments and Datum Plates - Curves - Cant - Turnouts - Crossings - Types of Turnouts - Examples of Turnouts. Background The track is a fundamental part of the railway infrastructure and represents the primary distinction between this form of land transportation and all others in that it provides a fixed guidance system.  The track is the steering base for the train and has evolved from an ancient design of vehicle guidance with origins dating, some historians have suggested, from the Sumerian culture of 2000 BC.  The modern railway version is based on the steel wheel running on a steel rail.  Other forms of guided vehicle technology exist; rubber-tyred trains, magnetic levitation and guided busways, for example, but these are not dealt with here.  There is a good description of the French-based rubber tyred train technology available at The Rubber Tyred Metro. Basic Construction(this fucking pic!) Track is the most obvious part of a railway route but there is a sub-structure supporting the track which is equally as important in ensuring a safe and comfortable ride for the train and its passengers or freight.  The infrastructure diagram here shows the principal parts of an electrified, double-track line. The total width across the two-track alignment will be about 15 m (50 ft) for a modern formation.  The "cess" shown each side of the alignment is the area available for a walkway or refuge for staff working on the track. The Sub-Structure This part of the road consists of three main elements; the formation, the sub-ballast and the ballast.  The formation is the ground upon which the track will be laid.  It can be the natural ground level or "grade" or it can be an embankment or cutting.  It is important that the formation is made of the right materials and is properly compacted to carry the loads of passing trains.  The formation under the track has a "camber" rather like that seen on a roadway.  This is to ensure ease of water run-off to the drains provided on each side of the line.  The track itself is supported on "ballast", made up of stones - usually granite or, in the US, basalt - below which is a layer of sand, which separates it from the formation.  For new or renewed formations, the sand is normally laid over some sort of geotechnical screen or mesh to separate it from the foundation material below.  In the past, asphalt or plastic sheeting has been used to prevent water seepage. Catenary masts (if the line is electrified on the overhead system) are located outside the drains and, beyond them, there is a walkway area.  This may just be a cleared path for staff to walk safely, avoiding passing trains or, on modernised routes, a properly constructed path.  Next to this path will be a cable trough.  These were originally concrete but are nowadays often made of plastic.  Cables crossing the track are protected by a plastic tube, usually bright orange in the UK.  Proper cable protection is essential to prevent damage by animals, track maintenance tools, weather and fire. Usually, the edge of the railway property is outside the pathway or cable runs.  If the line is built through an area requiring an embankment or cutting, the slopes will be carefully designed to ensure that the angle of slope will not take an excessive width of land and allow proper drainage but without risking an earth slip.  The slope angle depends on the type of soil available, the exposure, the climate and the vegetation in the area.  Drainage ditches are often added along the edges of cuttings and embankments.  In the UK, fences are always provided along the boundary line of the railway to protect the public from wandering onto the track.  Even so, there are a few accidents every year when trespassers are killed or injured by trains or electric conductor rails.  Many countries around the world don't fence their railways, assuming people will treat them like roads and look both ways before crossing.  They don't. Ballast Ballast is provided to give support, load transfer and drainage to the track and thereby keep water away from the rails and sleepers.  Ballast mustsupport the weight of the track and the considerable cyclic loading of passing trains.  Individual loads on rails can be as high as 50 tonnes (55 US or short tons) and around 80 short tons on a heavy haul freight line.  Ballast is made up of stones of granite or a similar material and should be rough in shape to improve the locking of stones.  In this way they will better resist movement.  Ballast stones with smooth edges do not work so well.  Ballast will be laid to a depth of 9 to 12 inches (up to 300 mm on a high speed track).  Ballast weighs about 1,600 to 1,800 kg/cu/m.  See also Ballasted vs Non-Ballasted Track below. Track The usual track form consists of the two steel rails, secured on sleepers (or crossties, shortened to ties, in the US) so as to keep the rails at the correct distance apart (the gauge) and capable of supporting the weight of trains.  There are various types of sleepers and methods of securing the rails to them.  Sleepers are normally spaced at 650 mm (25 ins) to 760 mm (30 ins) intervals, depending on the particular railway's standard requirements. Sleepers (Ties) Traditionally, sleepers (known as ties in the US) are wooden.  They can be softwood or hardwood. Most in the UK are softwood, although London Underground uses a hardwood called Jarrah wood.  Sleepers are normally impregnated with preservative(注入防腐剂) and, under good conditions, will last up to 25 years.  They are easy to cut and drill and used to be cheap and plentiful.  Nowadays, they are becoming more expensive and other types of materials have appeared, notably concrete and steel.  Concrete is the most popular of the new types (left).  Concrete sleepers are much heavier than wooden ones, so they resist movement better.  They work well under most conditions but there are some railways which have found that they do not perform well under the loads of heavy haul freight trains.  They offer less flexibility and are alleged to crack more easily under heavy loads with stiff ballast.  They also have the disadvantage that they cannot be cut to size for turnouts and special trackwork.  A concrete sleeper can weighs up to 320 kg (700 lbs) compared with a wooden sleeper which weighs about 100 kg or 225 lbs.  The spacing of concrete sleepers is about 25% greater than wooden sleepers.  Typical concrete sleepers are shown in the photo below: Another type of concrete sleeper is shown in this drawing.  This is the twin-block sleeper. The design consists of two concrete blocks joined by a steel bar.  It is 30% lighter than a regular concrete sleeper, allowing it to be moved manually.  It is popular in France (where it is called Stedef) and for some lighter track forms like those used for tramway systems.  Here is an example in Sheffield.  It shows twin block and wooden sleepers in the same track. The sleepers shown in the above photo are supplemented with wooden sleepers at the crossover, because it is easier to cut the timber to the correct size.  Sleepers at crossovers and turnouts vary in size according to their position in the layout. Steel sleepers are also now used on more lightly used roads, but they are regarded as suitable only where speeds are 100 mi/h (160 km/h) or less. In the US most ties are made of oak soaked in creosote, cost on average between $22-$29 each.  Iit used to be up to $35-$40 per tie in the late 80's.  They can last up to 20 years.  Most Class 1 RR's will replace them after 5-10 years and then sell them as used.  Concrete ties are $42 dollars.  They are popular in the western US and on passenger lines in the east.  Recently, composite ties have come on the market.  They are made of something like old tires and recycled plastic.  They can be used and spiked like regualar ties, cost about 50% less and save on trees. Rail The standard form of rail used around the world is the "flat bottom" rail.  It has a wide base or "foot" and narrower top or "head".  The UK introduced a type of rail which was not used elsewhere - apart from a few UK designed railways.  This was known as "Bullhead" rail and is shown in comparison with the standard type in the diagram left. Bullhead rail was originally designed with reuse in mind.  It was intended that it would be turned over when the top had worn but this proved impossible because the underside also wore where it had been secured to the sleeper.  Bullhead rail has to be mounted in a special "chair" made of cast iron and secured by a "key" wedged between the rail web and the chair.  The chairs are secured to the sleepers by "coach screws".  The arrangement can be seen in the first photo below: Bullhead Rails Flat bottom rail     The second photo above shows a flat bottom rail clipped to a baseplate under the rail.  Flat bottom rails can also be "spiked" directly to the sleepers.  A wide headed nail is driven into the sleeper on each side of the rail so that the foot of the rail is held by the heads of the spikes.  Long stretches of track were laid in record times across the US in the pioneering days of railroad development using this method of securing rails to "ties".  Nowadays, heavier loads and faster trains require more sophisticated systems. Normally, the rail rests on a cast steel plate which is screwed or bolted to the sleeper.  The rail is attached to the plate by a system of clips or clamps, depending on the design.  The older UK standard design was an elastic spike with a sprung, curved top which secures the rail.  There are a number of variations seen around the world.  One of the most popular is the "Pandrol" clip seen above.  A resilient pad will be provided between the rail and the base plate and around the securing clip, where required to provide insulation for the track circuits, if installed. The infrastructure owning company in the UK (currently known as Network Rail), has adopted UIC60 rail (which weighs 60 kg/m or 125 lb/yd) as its standard for high speed lines.  The present standard is equivalent to the UIC 54 rail, which weighs about 113 lbs/yd or 54 kg/m.  Did you know, there are 2,400 sleepers (ties) in a mile of track?  In the US, rail weight varries from 80-90 lb/yd (pounds/yard) in small yards to 100-110 lb/yd on light duty track and between 130 and 141 lbs on heavy duty track.  Rail of 141 lbs is the new main line standard.  The Pennsylvania RR used a special 155 lb/yd rail, which was the heaviest ever rolled for mainline operations.  Some of it is still in place with 8-bolt joints instead of the more usual 6-bolt joints.  It is over an inch taller than comparable 141 pound rail.  Highest price steel rail costs $700 a ton (2000lbs).  A 133 pound rail costs $46.55 per yard (0.92 m.). Older track is jointed.  In the UK, about 35% of track is still jointed, although this is continuously falling as new rail is installed.  Rails were normally laid in standard lengths bolted together by what are called fishplates in the UK or splices in the US.  The joints allowed sufficient space for expansion as they were provided at 60 foot intervals in the UK and 39 foot in the US, allowing them to be carried in a standard 40 ft flat wagon.  The joints were always staggered in the US whereas the UK placed them side by side.  The result of the US staggered joints can be seen in the curious rolling motion of freight cars running on poorly maintained track.  The reason for the staggering is that, in the US it was determined thatafter jointed rail has been in place for a time it starts to drop and creates a depression.  When a wheel falls into the depression and begins to climb out again it exerts a force. If the two joints were in parallel this force would be much larger and the joints might snap.  This is not considered a problem in the UK and Europe, probably because of the lighter axle loads. Nowadays, rail is welded into long lengths,which can be up to several hundred metres long.  Expansion is minimised by installing and securing the rails in tension.  Provided the tension is adjusted to the correct level, equivalent to a suitable rail temperature level, expansion joints are not normally needed.  Special joints to allow rail adjustment are provided at suitable locations as shown in the photo below: Adjustment switches are also provided to protect turnouts and at locations where a change in the rail design or size occurs. Rail tends to creep in the main direction of travel so "rail anchors" ("anti-creepers" in the US) are installed at intervals along the track.  They are fitted under the rail against a base plate to act as a stop against movement. Rail Welding Modern trackwork uses long welded rail lengths to provide a better ride, reduce wear, reduce damage to trains and eliminate the noise associated with rail joints.  Rail welding is a complex art (or science) depending on how you feel about it.  There are two main types of welding used for rails: Thermit welding and Flash Butt welding.  Gauge The standard track gauge - the distance between the two rails - is 4 ft. 8? in or 1435 mm. but many other gauges, wider and narrower than this, are in use around the world.  Gauge is often intentionally widened slightly on curved track.  There is some additional information on Track Gauges at the Pacific Southwest Railroad Museum site.  Modern Track Forms There are now a range of modern track forms using a concrete base.  They are generally used in special locations such as tunnels or bridges where a rigid base is required to ensure track stability in relation to the surrounding structures.  This type of track, usually called "slab track" or "non-ballasted" track, often appears as shown in the diagram below: The earth mat is a steel mesh screen provided on electrified railways to try to keep stray return currents from connecting to utilities pipes and nearby steel structures.  Earthing must be strictly controlled otherwise serious and expensive problems will occur, made more serious and expensive because they involve other people's property. Some slab track systems have the sleepers resting on rubber or similar pads so that they become "floating slab track".  Floating track is used as a way of reducing vibration.  Hong Kong Mass Transit Railway is fond of it, since its lines run through very densely populated areas. Ballasted vs Non-Ballasted Track The basic argument for different track designs will be based on the bottom line - cost; cost of installation and cost of maintenance.  There are however, other issues such as environment - noise, dust and vibration - or engineering issues such as space, location, climate and the type of service intended for the track. There are a wide variety of track forms and systems incorporating some form of concrete base or support which doesn't need ballast.  Almost all of these require less depth of construction than ballasted track.  However, the accuracy of installation must be higher than that needed for ballasted track.  Slab track will not be adjusted after installation but ballast can be packed to align track as required. The ability of ballast to allow track realignment is one of its most serious weaknesses.  The lateral movement caused by passing trains on curved track is one of the major causes of maintenance costs added to which is the crushing caused by axle weight and damage due to weather and water.  Ballast damage leads to tracks "pumping" as a train passes and, eventually, rail or sleeper damage will occur, to say nothing of the reduced comfort inside the train and the additional wear on rolling stock.  Apart from regular repacking or "tamping", ballast will have to be cleaned or replaced every few years. Another aspect to the ballasted track design, is the dust which is caused during installation and as it wears or gets crushed.  It does however, offer a useful sound deadening quality. Fixed track formations using slab track or a concrete base of some sort do not suffer from such problems.  However, the installation of slab track is reported to cost about 20% more than ballasted track.  To balance this cost, the maintenance costs have been quoted as reduced by 3 to 5 times that of ballasted track on a high speed line in Japan. If low levels of use are foreseen, or if low capital cost is a more important requirement, ballasted track would be the choice.  For a heavily used railway, particularly one in a structurally restricted area like a tunnel or viaduct, non-ballasted track must be the best option on grounds of low maintenance cost and reduced space requirements.  However, care must be taken during design and installation to ensure the best out of the system. 
/
本文档为【铁路基础设施(英文简介)】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索