为了正常的体验网站,请在浏览器设置里面开启Javascript功能!
首页 > 儿童急救大全!粑粑麻麻必备的基本常识!

儿童急救大全!粑粑麻麻必备的基本常识!

2018-03-05 14页 doc 155KB 20阅读

用户头像

is_601191

暂无简介

举报
儿童急救大全!粑粑麻麻必备的基本常识!儿童急救大全!粑粑麻麻必备的基本常识! 儿童急救大全~粑粑麻麻必备的基本常识~ 当孩子出现意外事故,家长马上想到的是送医院!其实如果爸爸妈妈们具有救护、自救的知识,能冷静、沉着、迅速地采取急救措施,就能为宝贝的生命争取时间,减少事故对宝贝的伤害,那么今天巍阁名媛月府 月子中心为大家介绍有关儿童急救的一些办法: 吞食异物 大人坐在椅子上,宝宝俯卧在双腿上,上胸部和头部低垂着,家长用一手固定孩子,另一手有节奏地拍击其两肩胛间的背部,使气道内的阻塞物脱离原位而咳出。必要的时候要进行人工呼吸或心外按摩。 海姆立克急救法 th...
儿童急救大全!粑粑麻麻必备的基本常识!
儿童急救大全!粑粑麻麻必备的基本常识! 儿童急救大全~粑粑麻麻必备的基本常识~ 当孩子出现意外事故,家长马上想到的是送医院!其实如果爸爸妈妈们具有救护、自救的知识,能冷静、沉着、迅速地采取急救措施,就能为宝贝的生命争取时间,减少事故对宝贝的伤害,那么今天巍阁名媛月府 月子中心为大家介绍有关儿童急救的一些办法: 吞食异物 大人坐在椅子上,宝宝俯卧在双腿上,上胸部和头部低垂着,家长用一手固定孩子,另一手有节奏地拍击其两肩胛间的背部,使气道内的阻塞物脱离原位而咳出。必要的时候要进行人工呼吸或心外按摩。 海姆立克急救法 that construction site clean, consciously maintain sanitation. (4) ensure the safety of materials and semi-finished products. 8. quality assessment, data compilation: buried, belongs to the concealed works construction, therefore its quality inspection must be carried out according to acceptance of concealed work-related. Mainly in the following aspects: (1) acceptance of positioning is accurate. (2) is fixed securely. (3) tightening compliance requirements. (4) have an impact on other projects. (5) the material used is eligible. (6) complete information has been collected. Documentation: should follow construction progress at any time finishing self acceptance, signature acceptance after the representatives of the party were invited. Requirements: (1) covert acceptance is thetypeset by the owners ' consent before they can purchase and order under the program, each stone must use the same background, the same pattern, size error in 0.5mm stone. Air infiltration properties, stone curtain wall wind pressure rainwater leakage in distortion performance, performance and energy-saving performance in front of the construction should be in accordance with the construction plan of the specification and the file size in the appropriate authority inspection departments qualified testing. Stone used steel keel, installation job main including following steps: 2.1 construction Qian prepared 2.2 pre buried pieces processing 2.3 measurement and the measurement results figure draws 2.4 vertical box positioning put line 2.5 turned received pieces installation 2.6 vertical box installation 2.7 vertical box correction and acceptance 2.8 layer high and the cross box measurement positioning and put line 2.9 cross box installation 2.10 installation 2.11 stone plate installation 2.12 sealed rubber injection 2.13 clean ending 2.14 construction Qian prepared 1. Description Project Manager required for the duration of the project schedule, technical information, tools, machinery, apparatus, materials, personnel, temporary facilities ready. 2. the scope of previous construction (1) project outline: to understand the site profiles, familiar with the construction and supervision of party that construction site clean, consciously maintain sanitation. (4) ensure the safety of materials and semi-finished products. 8. quality assessment, data compilation: buried, belongs to the concealed works construction, therefore its quality inspection must be carried out according to acceptance of concealed work-related. Mainly in the following aspects: (1) acceptance of positioning is accurate. (2) is fixed securely. (3) tightening compliance requirements. (4) have an impact on other projects. (5) the material used is eligible. (6) complete information has been collected. Documentation: should follow construction progress at any time finishing self acceptance, signature acceptance after the representatives of the party were invited. Requirements: (1) covert acceptance is thetypeset by the owners ' consent before they can purchase and order under the program, each stone must use the same background, the same pattern, size error in 0.5mm stone. Air infiltration properties, stone curtain wall wind pressure rainwater leakage in distortion performance, performance and energy-saving performance in front of the construction should be in accordance with the construction plan of the specification and the file size in the appropriate authority inspection departments qualified testing. Stone used steel keel, installation job main including following steps: 2.1 construction Qian prepared 2.2 pre buried pieces processing 2.3 measurement and the measurement results figure draws 2.4 vertical box positioning put line 2.5 turned received pieces installation 2.6 vertical box installation 2.7 vertical box correction and acceptance 2.8 layer high and the cross box measurement positioning and put line 2.9 cross box installation 2.10 installation 2.11 stone plate installation 2.12 sealed rubber injection 2.13 clean ending 2.14 construction Qian prepared 1. Description Project Manager required for the duration of the project schedule, technical information, tools, machinery, apparatus, materials, personnel, temporary facilities ready. 2. the scope of previous construction (1) project outline: to understand the site profiles, familiar with the construction and supervision of party that construction site clean, consciously maintain sanitation. (4) ensure the safety of materials and semi-finished products. 8. quality assessment, data compilation: buried, belongs to the concealed works construction, therefore its quality inspection must be carried out according to acceptance of concealed work-related. Mainly in the following aspects: (1) acceptance of positioning is accurate. (2) is fixed securely. (3) tightening compliance requirements. (4) have an impact on other projects. (5) the material used is eligible. (6) complete information has been collected. Documentation: should follow construction progress at any time finishing self acceptance, signature acceptance after the representatives of the party were invited. Requirements: (1) covert acceptance is thetypeset by the owners ' consent before they can purchase and order under the program, each stone must use the same background, the same pattern, size error in 0.5mm stone. Air infiltration properties, stone curtain wall wind pressure rainwater leakage in distortion performance, performance and energy-saving performance in front of the construction should be in accordance with the construction plan of the specification and the file size in the appropriate authority inspection departments qualified testing. Stone used steel keel, installation job main including following steps: 2.1 construction Qian prepared 2.2 pre buried pieces processing 2.3 measurement and the measurement results figure draws 2.4 vertical box positioning put line 2.5 turned received pieces installation 2.6 vertical box installation 2.7 vertical box correction and acceptance 2.8 layer high and the cross box measurement positioning and put line 2.9 cross box installation 2.10 installation 2.11 stone plate installation 2.12 sealed rubber injection 2.13 clean ending 2.14 construction Qian prepared 1. Description Project Manager required for the duration of the project schedule, technical information, tools, machinery, apparatus, materials, personnel, temporary facilities ready. 2. the scope of previous construction (1) project outline: to understand the site profiles, familiar with the construction and supervision of party that construction site clean, consciously maintain sanitation. (4) ensure the safety of materials and semi-finished products. 8. quality assessment, data compilation: buried, belongs to the concealed works construction, therefore its quality inspection must be carried out according to acceptance of concealed work-related. Mainly in the following aspects: (1) acceptance of positioning is accurate. (2) is fixed securely. (3) tightening compliance requirements. (4) have an impact on other projects. (5) the material used is eligible. (6) complete information has been collected. Documentation: should follow construction progress at any time finishing self acceptance, signature acceptance after the representatives of the party were invited. Requirements: (1) covert acceptance is thetypeset by the owners ' consent before they can purchase and order under the program, each stone must use the same background, the same pattern, size error in 0.5mm stone. Air infiltration properties, stone curtain wall wind pressure rainwater leakage in distortion performance, performance and energy-saving performance in front of the construction should be in accordance with the construction plan of the specification and the file size in the appropriate authority inspection departments qualified testing. Stone used steel keel, installation job main including following steps: 2.1 construction Qian prepared 2.2 pre buried pieces processing 2.3 measurement and the measurement results figure draws 2.4 vertical box positioning put line 2.5 turned received pieces installation 2.6 vertical box installation 2.7 vertical box correction and acceptance 2.8 layer high and the cross box measurement positioning and put line 2.9 cross box installation 2.10 installation 2.11 stone plate installation 2.12 sealed rubber injection 2.13 clean ending 2.14 construction Qian prepared 1. Description Project Manager required for the duration of the project schedule, technical information, tools, machinery, apparatus, materials, personnel, temporary facilities ready. 2. the scope of previous construction (1) project outline: to understand the site profiles, familiar with the construction and supervision of party 划伤 先用清水或稀释的消毒药水把伤口洗干净,然后止血。如果伤口较深长的话,就要用消毒纱布将伤口及周围包扎住,可以包扎得稍紧一些以止血;对于四肢上出血较多的伤口可以抬高患肢。做完初步的包扎止血措施之后应立即带宝宝去找医生救治。 宠物咬伤 首先确保宠物已被控制住。用流动水冲洗伤口5分钟,确保从伤口完全冲洗掉动物唾液,用干净的纱布包扎伤口,立即送往医院。只要皮肤被咬破,哪怕是很小的伤口,也需看医生,注射狂犬疫苗。 一氧化碳中毒 首先关闭气源,将患儿转移到空气新鲜的场所,注意保暖勿着凉。吸氧是最重要的治疗措施,所以需尽快将孩子送往医院,接受专业治疗。如果呼吸心跳已停止,必须立即行心肺复苏。 烧伤烫伤 用凉水冲洗患处10-15分钟(婴儿用温水),以降低温度。 未粘着的衣物小心地脱下(不要撕扯), 以减少皮肤损害。 然后用干净的布单或纱布包裹伤口处并立即送医院,不要自行涂抹任何药膏,也不要挑破水疱,以免影响进一步治疗。 溺水 注意清除口腔内的泥沙污物,保证气道畅通。若还有呼吸,则让患儿侧躺,使嘴在脸部下端而方便水流出。如果出现呼吸心跳停止,即刻施行人工呼吸以及that construction site clean, consciously maintain sanitation. (4) ensure the safety of materials and semi-finished products. 8. quality assessment, data compilation: buried, belongs to the concealed works construction, therefore its quality inspection must be carried out according to acceptance of concealed work-related. Mainly in the following aspects: (1) acceptance of positioning is accurate. (2) is fixed securely. (3) tightening compliance requirements. (4) have an impact on other projects. (5) the material used is eligible. (6) complete information has been collected. Documentation: should follow construction progress at any time finishing self acceptance, signature acceptance after the representatives of the party were invited. Requirements: (1) covert acceptance is thetypeset by the owners ' consent before they can purchase and order under the program, each stone must use the same background, the same pattern, size error in 0.5mm stone. Air infiltration properties, stone curtain wall wind pressure rainwater leakage in distortion performance, performance and energy-saving performance in front of the construction should be in accordance with the construction plan of the specification and the file size in the appropriate authority inspection departments qualified testing. Stone used steel keel, installation job main including following steps: 2.1 construction Qian prepared 2.2 pre buried pieces processing 2.3 measurement and the measurement results figure draws 2.4 vertical box positioning put line 2.5 turned received pieces installation 2.6 vertical box installation 2.7 vertical box correction and acceptance 2.8 layer high and the cross box measurement positioning and put line 2.9 cross box installation 2.10 installation 2.11 stone plate installation 2.12 sealed rubber injection 2.13 clean ending 2.14 construction Qian prepared 1. Description Project Manager required for the duration of the project schedule, technical information, tools, machinery, apparatus, materials, personnel, temporary facilities ready. 2. the scope of previous construction (1) project outline: to understand the site profiles, familiar with the construction and supervision of party 心外按摩。抢救同时联系急救车(拨打120),尽快送往医院实施进一步治疗。切记自己不要想办法把水拍出来,以免肺中的水扩散到其他部位。 触电 尽快关闭电源,用不导电物(如干燥木棍、竹竿、塑料椅子等)挑开电线或将触电人离开电源。检查呼吸及心跳,心跳呼吸停止的一定要及时做人工呼吸及心外按摩。若手指插入插座而触电,之后手指如果有一红点的话,哪怕宝宝看起来没事了,也要马上去医院做检查,因为体内存余的电力可能会在24小时内影响心脏正常工作。 中毒 带上中毒物品,尽快将孩子送往医院,以便医生尽快查出毒源。不知道怎么办也可以电话到中毒急救中心,打电话时要镇静,先说明孩子多大,体重多少,吃错什么东西,多少量。 误吃腐蚀物 不要想办法让孩子呕吐,正确的方法是让孩子大量喝水,起稀释的作用。注意!!如果孩子喝的是洗洁剂的话千万不可喝水,否则洗洁剂在体内起泡膨胀,易进入肺部。 蜂螫 尽量冷敷,必要的时候要用药,以防过敏症状的出现。区分蜜蜂和马蜂?马蜂刺人后还可以继续飞,而蜜蜂刺人后就死翘翘啦。。。 以上则是巍阁名媛月府月子会所简单介绍的几点,妈妈们赶紧收藏起来吧~ that construction site clean, consciously maintain sanitation. (4) ensure the safety of materials and semi-finished products. 8. quality assessment, data compilation: buried, belongs to the concealed works construction, therefore its quality inspection must be carried out according to acceptance of concealed work-related. Mainly in the following aspects: (1) acceptance of positioning is accurate. (2) is fixed securely. (3) tightening compliance requirements. (4) have an impact on other projects. (5) the material used is eligible. (6) complete information has been collected. Documentation: should follow construction progress at any time finishing self acceptance, signature acceptance after the representatives of the party were invited. Requirements: (1) covert acceptance is thetypeset by the owners ' consent before they can purchase and order under the program, each stone must use the same background, the same pattern, size error in 0.5mm stone. Air infiltration properties, stone curtain wall wind pressure rainwater leakage in distortion performance, performance and energy-saving performance in front of the construction should be in accordance with the construction plan of the specification and the file size in the appropriate authority inspection departments qualified testing. Stone used steel keel, installation job main including following steps: 2.1 construction Qian prepared 2.2 pre buried pieces processing 2.3 measurement and the measurement results figure draws 2.4 vertical box positioning put line 2.5 turned received pieces installation 2.6 vertical box installation 2.7 vertical box correction and acceptance 2.8 layer high and the cross box measurement positioning and put line 2.9 cross box installation 2.10 installation 2.11 stone plate installation 2.12 sealed rubber injection 2.13 clean ending 2.14 construction Qian prepared 1. Description Project Manager required for the duration of the project schedule, technical information, tools, machinery, apparatus, materials, personnel, temporary facilities ready. 2. the scope of previous construction (1) project outline: to understand the site profiles, familiar with the construction and supervision of party
/
本文档为【儿童急救大全!粑粑麻麻必备的基本常识!】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索