为了正常的体验网站,请在浏览器设置里面开启Javascript功能!
首页 > 英语文章书写格式

英语文章书写格式

2018-07-10 22页 doc 71KB 101阅读

用户头像

is_842972

暂无简介

举报
英语文章书写格式英语文章书写格式 英文文章书写格式 一、字母大写 正确地使用大写字母是写作中一个不能疏忽的问题。大写字母除了用于句首、称呼、专有名词等外,下面几种情况也应予以注意: 1(句子中直接引语的第一个字母要大写无论“某某说”一类的说明语是在句首还是在句尾。如:She said, "It is unreasonable to such a thing." 但当直接引语是一个句子的继续时,则不用大写字母。 如:"It is unreasonable," she said,"to expect such a thing(" 2...
英语文章书写格式
英语文章书写格式 英文文章书写格式 一、字母大写 正确地使用大写字母是写作中一个不能疏忽的问题。大写字母除了用于句首、称呼、专有名词等外,下面几种情况也应予以注意: 1(句子中直接引语的第一个字母要大写无论“某某说”一类的语是在句首还是在句尾。如:She said, "It is unreasonable to such a thing." 但当直接引语是一个句子的继续时,则不用大写字母。 如:"It is unreasonable," she said,"to expect such a thing(" 2(示学校里学科的名词的第一个字母一般用小写,但语言学科,如Chinese,English等、第一个字母则要大写。如果学科名词被看作是课程中的一项,或考试的一个项目,则第一个字母要大写。如下面两句中的history的第一个字母分别用了大写和小写。 He is very interested in history( He passed in History but failed in Geometry. 3(表示亲属关系的普通名词有时专指某一个人,其作用相当于专有名词,这时第一个字母可用大写。如: We went to the hospital to Grandfather( What does it mean,Mother? 这类名词第一个字毋大写时,前面都无my或your等限定词。 4(普通名词的第一个字母一般应小写,但当它们作为专有名词的一部分时应该大写。如下面两句中的Professor的第一个字母分别用了大写和小写: She knew Professor Smith( She knew the Professor. 二、英文书写和移行 英文书写应符合书写,英文字母要写清楚、写整齐、写美观,字母的大小和字母之间的距离要匀称。书写应做到字形秀丽漂亮,通篇匀称和谐。 写英文字母要掌握正确笔顺。如字母i,应该先写下面的部分,然后再打点。有的学生却按写汉字的习惯从上到下写,写快了,就会把点和下面的十笔连在量起,显得十分别扭。字形t应为两笔。不少人却将两笔合成一笔,看上去不像t,倒像l或是e,难以辨认。另外,把r写成v,把q写成把g,把k写成h等等,都是中学生书写中常见的毛病。 不少人在四线三格的练习纸上书写尚有规矩,能按字母的占格、高低和大小要求书写,但在白纸或横线纸上书写,却显得十分幼稚拙劣。字母或跳上跳下,或一律写成同一高度,占上中两格的字母与占中下两格的字母完全没有高低之别。这些现象都要防止。 另外,书写时还要注意词与词之间要保持一定的距离,不能紧靠在一起。字母之间的连写也应该按照习惯,不能随意乱来。 在一篇字数有限的作文里,我们还要注意尽量不把一个单词拆开移行。万一要移行,则必须以音节为单位进行,如revolution这个词,依照音节移行的原则可以按re-,revo-, revolu-这几种方法移行。在移行时,我们还应特别注意以下几点: 1. 单音节词不能移行,即使是字母较多的单音节词,如through等也不能例外。 2(缩略词如Mr.,Dr.等不能和后面的名字拆开移行。 缩略的专用名词如U(K.,U(S(A等也不能拆开移行。 3(时间、量度及货币单位应视为一个整体;不能分开移行。如; 11:00P.M.应写在一行内,不能将11:00和P(M(分开移行;写38?时,不能将36和C分开移行。 ”分开。4(由“年、月、日”表示的日期,如果必须分开移行只能将“月、日”与“年如January 6,1980不能将January和6分开移行,但可以把January 6,和1980分成两行。 5(含双写辅音字母的单词,在移行时要将辅音字母拆开。如better可拆成better,necessary可拆成necessary。 但如果双写辅音字母属于词根,后面又加了后缀,就不能将两个辅音字母拆开。如drill加上-ing后构成了drilling,就不可以将它拆成成dril-ling,而只能拆为drilling。 三、行款格式 一篇好的作文,不仅要求内容吸引人,文章层次清楚,而且卷面也要求整洁美观。卷面是文章给人的第一印象,字写得是否正确好看,标点符号用得是否恰当,,行款是否合乎格式,这些都直接影响文章内容的表达,影响读者对文章的评价。在高校入学考试中,有些学生就是因卷面不好而影响了分数。因此,书写格式对写作来说,是相当重要的。 英文作文的行款格式有以下三点: and Planer, hand drills, grinders, cutters,tric h1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, elecets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.ety n(2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all saf e line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame.color" line as the ground wire. 5, high voltag-e electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuangres using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliabll) wim and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutragrounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 4, instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. m the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin linem fro gns, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5tion of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up sistallaen, through optical zoom 10 times"illumination", "welding". 3, electricity lines: (1) electric line, required for overhead ineral adjustable into 1mg/grid, and 0.1mg/grid, and 0.01mg/grid, will signs made transparent film, loaded in pointer Shang, thoptic balance of sense volume Gen-vity = grid/mg but in actually often with "sense volume" to said: sense volume = mg/grid electrothe size of the moment change the zero point. Balance of sensitivity General to signs of grid number to measure, that sensiti point adjustment screw is the distance from the fulcrum nut quality adjustment nut to adjust-lf d the length of the horizontal zeroal materials to relieve beam measures sensitivity adjustment screw is to use the height to adjust the quality of the nut itseshaped, "Alice beams" in order to reduce the impact deformation, knock out heavy and light met-titanium alloys light metal alloy. VFulcrum Onyx blade slightly below contains key Onyx blade's "Alice beams" type, and balance beam made of aluminium alloys or tion, the sensitivity adjustment screw located on the top of a vertical, set two zero point adjusting screw in the horizontal direc-ovate, hollowed out in the Middle, triangular-agate and knife blades sharp and smooth). So, balance beam made of triangular at is,e carrying heavy loads and balance beam deformation, agate cutters of the fulcrum and the load point of the contact point (thenter of gravity, high sensitivity. But the sensitivity of the balance are not only associated with these three factors, whil2) the beam of the scale is heavier, lower sensitivity, (3) pivot and the shorter the distance between the cthat balances the sensitivity associated with the following factors: (1) the long arm of the scale, higher sensitivity, and ( 2 1(四边的距离 使用横线纸书写时,要在纸的左右两边留约3(6厘米的空白。使用空白纸书写时,纸的上下两边留约6厘米的空白; 2. 题目的写法 题目应写在第一行的中间,题目左右两边的空白距离大致相等。 题目的第一个单词的第一个字母必须大写。从第二个单词起,其中每个实义词的第一个字母大写,而冠词、介词和连词的第一个字母则一般小写。如: A Day to Remembcr Let's Go in for Sports 题目的另一种写法是所有单词的第一个字母全部用大写。如: My Life As Factory Worker A Walk Under The Rain 写题目不要用括号或引号。题目后除了问号和感叹号之外,不加其它标点符号。 3(文章本体 文章第一段的第一行应与题目隔一行或两行。每段的开头一般应该缩格;即向右缩进约四个字母的间隔;单词与单。词之间须留一个字字母的间隔,句与句之间须留两个字母的间隔。假若每行的最后一个单词写不下,最好不要轻易拆字移行,可将该单词移到后一行去书写。书写时,不要因为一行末尾还有一点空间就把一个词的前半截硬塞在那里,造成非移行不可的局面。实际上,移行过多是书写、打字或排印质量不高的表现。不必过份地去追求右边的整齐,宁可多空一些,每行长短错落,要比移行过多看上去舒服。 四、标点符号 英语的标点符号与汉语的标点符号在形式上与使用上大同小异。中学生容易疏忽的地方,大致有以下几处: 1(英语句号是实心点,而不是小圆圈,如果英语的何号也和汉语一样,则容易和字母“o”相混淆。 2(英语的省略号“…”是3点,不是像汉语那样用6点“……” 3. 字符号不要写得太长,写长了容易跟破折号混淆。其长度应该与一个字母的宽度相当。破折号的长度约占两个字母的位置。书写破折号时,与前后的单词应有一定的距离。 3 4(英语中没有顿号“、”。要表示句中较短的并列词语之间的停顿,汉语习惯用顿号,而英语只能用逗号;汉语中连词“和”、“及”等之前不可用顿号,而英语中连接一系列并列项目的“and”或“or”之前往往可以用逗号。 5(使用所有格符号时,要注意放在正确的位置上,以免引起意义上的混淆。如my fatller's book不能写成my fathers’book。 6. 汉语中直接引语前的“某某说”等词语之后一律用冒号。而英语中既可用逗号,也可用冒号。当“某某说”等词语在直接引语后时,汉语的引语末尾用句号,而英语一般用逗号。如句子 "It's none of your business," the young men said rudely(的汉语译文是:“这不管你的事。”年轻人粗暴地说。 7. 问号用在直接疑问句之后。间接疑问句是作为一个从句来处理的,不能用问号。如 I didn't know what he meant by that( 8. 英语中没有书名号《 》,书名一般用引号。如:Yesterday she saw an English film "Gone with the Wind" 9. 文章每行的起首除了引号和括号外,不应书写其它标点,引号和括号最好标 在同一行中。句子较长时,可以分行标号,但千万不能顾头不顾尾。 and Planer, hand drills, grinders, cutters,tric h1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, elecets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.ety n(2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all saf e line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame.color" line as the ground wire. 5, high voltag-e electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuangres using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliabll) wim and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutragrounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 4, instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. m the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin linem fro gns, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5tion of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up sistallaen, through optical zoom 10 times"illumination", "welding". 3, electricity lines: (1) electric line, required for overhead ineral adjustable into 1mg/grid, and 0.1mg/grid, and 0.01mg/grid, will signs made transparent film, loaded in pointer Shang, thoptic balance of sense volume Gen-vity = grid/mg but in actually often with "sense volume" to said: sense volume = mg/grid electrothe size of the moment change the zero point. Balance of sensitivity General to signs of grid number to measure, that sensiti point adjustment screw is the distance from the fulcrum nut quality adjustment nut to adjust-lf d the length of the horizontal zeroal materials to relieve beam measures sensitivity adjustment screw is to use the height to adjust the quality of the nut itseshaped, "Alice beams" in order to reduce the impact deformation, knock out heavy and light met-titanium alloys light metal alloy. VFulcrum Onyx blade slightly below contains key Onyx blade's "Alice beams" type, and balance beam made of aluminium alloys or tion, the sensitivity adjustment screw located on the top of a vertical, set two zero point adjusting screw in the horizontal direc-ovate, hollowed out in the Middle, triangular-agate and knife blades sharp and smooth). So, balance beam made of triangular at is,e carrying heavy loads and balance beam deformation, agate cutters of the fulcrum and the load point of the contact point (thenter of gravity, high sensitivity. But the sensitivity of the balance are not only associated with these three factors, whil2) the beam of the scale is heavier, lower sensitivity, (3) pivot and the shorter the distance between the cthat balances the sensitivity associated with the following factors: (1) the long arm of the scale, higher sensitivity, and ( 4 5 and Planer, hand drills, grinders, cutters,tric h1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, elecets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.ety n(2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all saf e line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame.color" line as the ground wire. 5, high voltag-e electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuangres using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliabll) wim and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutragrounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 4, instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. m the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin linem fro gns, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5tion of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up sistallaen, through optical zoom 10 times"illumination", "welding". 3, electricity lines: (1) electric line, required for overhead ineral adjustable into 1mg/grid, and 0.1mg/grid, and 0.01mg/grid, will signs made transparent film, loaded in pointer Shang, thoptic balance of sense volume Gen-vity = grid/mg but in actually often with "sense volume" to said: sense volume = mg/grid electrothe size of the moment change the zero point. Balance of sensitivity General to signs of grid number to measure, that sensiti point adjustment screw is the distance from the fulcrum nut quality adjustment nut to adjust-lf d the length of the horizontal zeroal materials to relieve beam measures sensitivity adjustment screw is to use the height to adjust the quality of the nut itseshaped, "Alice beams" in order to reduce the impact deformation, knock out heavy and light met-titanium alloys light metal alloy. VFulcrum Onyx blade slightly below contains key Onyx blade's "Alice beams" type, and balance beam made of aluminium alloys or tion, the sensitivity adjustment screw located on the top of a vertical, set two zero point adjusting screw in the horizontal direc-ovate, hollowed out in the Middle, triangular-agate and knife blades sharp and smooth). So, balance beam made of triangular at is,e carrying heavy loads and balance beam deformation, agate cutters of the fulcrum and the load point of the contact point (thenter of gravity, high sensitivity. But the sensitivity of the balance are not only associated with these three factors, whil2) the beam of the scale is heavier, lower sensitivity, (3) pivot and the shorter the distance between the cthat balances the sensitivity associated with the following factors: (1) the long arm of the scale, higher sensitivity, and ( 6 7 and Planer, hand drills, grinders, cutters,tric h1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, elecets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.ety n(2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all saf e line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame.color" line as the ground wire. 5, high voltag-e electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuangres using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliabll) wim and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutragrounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 4, instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. m the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin linem fro gns, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5tion of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up sistallaen, through optical zoom 10 times"illumination", "welding". 3, electricity lines: (1) electric line, required for overhead ineral adjustable into 1mg/grid, and 0.1mg/grid, and 0.01mg/grid, will signs made transparent film, loaded in pointer Shang, thoptic balance of sense volume Gen-vity = grid/mg but in actually often with "sense volume" to said: sense volume = mg/grid electrothe size of the moment change the zero point. Balance of sensitivity General to signs of grid number to measure, that sensiti point adjustment screw is the distance from the fulcrum nut quality adjustment nut to adjust-lf d the length of the horizontal zeroal materials to relieve beam measures sensitivity adjustment screw is to use the height to adjust the quality of the nut itseshaped, "Alice beams" in order to reduce the impact deformation, knock out heavy and light met-titanium alloys light metal alloy. VFulcrum Onyx blade slightly below contains key Onyx blade's "Alice beams" type, and balance beam made of aluminium alloys or tion, the sensitivity adjustment screw located on the top of a vertical, set two zero point adjusting screw in the horizontal direc-ovate, hollowed out in the Middle, triangular-agate and knife blades sharp and smooth). So, balance beam made of triangular at is,e carrying heavy loads and balance beam deformation, agate cutters of the fulcrum and the load point of the contact point (thenter of gravity, high sensitivity. But the sensitivity of the balance are not only associated with these three factors, whil2) the beam of the scale is heavier, lower sensitivity, (3) pivot and the shorter the distance between the cthat balances the sensitivity associated with the following factors: (1) the long arm of the scale, higher sensitivity, and ( 8 9 and Planer, hand drills, grinders, cutters,tric h1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, elecets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.ety n(2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all saf e line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame.color" line as the ground wire. 5, high voltag-e electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuangres using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliabll) wim and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutragrounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 4, instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. m the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin linem fro gns, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5tion of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up sistallaen, through optical zoom 10 times"illumination", "welding". 3, electricity lines: (1) electric line, required for overhead ineral adjustable into 1mg/grid, and 0.1mg/grid, and 0.01mg/grid, will signs made transparent film, loaded in pointer Shang, thoptic balance of sense volume Gen-vity = grid/mg but in actually often with "sense volume" to said: sense volume = mg/grid electrothe size of the moment change the zero point. Balance of sensitivity General to signs of grid number to measure, that sensiti point adjustment screw is the distance from the fulcrum nut quality adjustment nut to adjust-lf d the length of the horizontal zeroal materials to relieve beam measures sensitivity adjustment screw is to use the height to adjust the quality of the nut itseshaped, "Alice beams" in order to reduce the impact deformation, knock out heavy and light met-titanium alloys light metal alloy. VFulcrum Onyx blade slightly below contains key Onyx blade's "Alice beams" type, and balance beam made of aluminium alloys or tion, the sensitivity adjustment screw located on the top of a vertical, set two zero point adjusting screw in the horizontal direc-ovate, hollowed out in the Middle, triangular-agate and knife blades sharp and smooth). So, balance beam made of triangular at is,e carrying heavy loads and balance beam deformation, agate cutters of the fulcrum and the load point of the contact point (thenter of gravity, high sensitivity. But the sensitivity of the balance are not only associated with these three factors, whil2) the beam of the scale is heavier, lower sensitivity, (3) pivot and the shorter the distance between the cthat balances the sensitivity associated with the following factors: (1) the long arm of the scale, higher sensitivity, and ( 10 11 and Planer, hand drills, grinders, cutters,tric h1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, elecets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.ety n(2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all saf e line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame.color" line as the ground wire. 5, high voltag-e electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuangres using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliabll) wim and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutragrounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 4, instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. m the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin linem fro gns, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5tion of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up sistallaen, through optical zoom 10 times"illumination", "welding". 3, electricity lines: (1) electric line, required for overhead ineral adjustable into 1mg/grid, and 0.1mg/grid, and 0.01mg/grid, will signs made transparent film, loaded in pointer Shang, thoptic balance of sense volume Gen-vity = grid/mg but in actually often with "sense volume" to said: sense volume = mg/grid electrothe size of the moment change the zero point. Balance of sensitivity General to signs of grid number to measure, that sensiti point adjustment screw is the distance from the fulcrum nut quality adjustment nut to adjust-lf d the length of the horizontal zeroal materials to relieve beam measures sensitivity adjustment screw is to use the height to adjust the quality of the nut itseshaped, "Alice beams" in order to reduce the impact deformation, knock out heavy and light met-titanium alloys light metal alloy. VFulcrum Onyx blade slightly below contains key Onyx blade's "Alice beams" type, and balance beam made of aluminium alloys or tion, the sensitivity adjustment screw located on the top of a vertical, set two zero point adjusting screw in the horizontal direc-ovate, hollowed out in the Middle, triangular-agate and knife blades sharp and smooth). So, balance beam made of triangular at is,e carrying heavy loads and balance beam deformation, agate cutters of the fulcrum and the load point of the contact point (thenter of gravity, high sensitivity. But the sensitivity of the balance are not only associated with these three factors, whil2) the beam of the scale is heavier, lower sensitivity, (3) pivot and the shorter the distance between the cthat balances the sensitivity associated with the following factors: (1) the long arm of the scale, higher sensitivity, and ( 12 13 and Planer, hand drills, grinders, cutters,tric h1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, elecets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.ety n(2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all saf e line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame.color" line as the ground wire. 5, high voltag-e electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuangres using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliabll) wim and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutragrounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 4, instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. m the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin linem fro gns, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5tion of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up sistallaen, through optical zoom 10 times"illumination", "welding". 3, electricity lines: (1) electric line, required for overhead ineral adjustable into 1mg/grid, and 0.1mg/grid, and 0.01mg/grid, will signs made transparent film, loaded in pointer Shang, thoptic balance of sense volume Gen-vity = grid/mg but in actually often with "sense volume" to said: sense volume = mg/grid electrothe size of the moment change the zero point. Balance of sensitivity General to signs of grid number to measure, that sensiti point adjustment screw is the distance from the fulcrum nut quality adjustment nut to adjust-lf d the length of the horizontal zeroal materials to relieve beam measures sensitivity adjustment screw is to use the height to adjust the quality of the nut itseshaped, "Alice beams" in order to reduce the impact deformation, knock out heavy and light met-titanium alloys light metal alloy. VFulcrum Onyx blade slightly below contains key Onyx blade's "Alice beams" type, and balance beam made of aluminium alloys or tion, the sensitivity adjustment screw located on the top of a vertical, set two zero point adjusting screw in the horizontal direc-ovate, hollowed out in the Middle, triangular-agate and knife blades sharp and smooth). So, balance beam made of triangular at is,e carrying heavy loads and balance beam deformation, agate cutters of the fulcrum and the load point of the contact point (thenter of gravity, high sensitivity. But the sensitivity of the balance are not only associated with these three factors, whil2) the beam of the scale is heavier, lower sensitivity, (3) pivot and the shorter the distance between the cthat balances the sensitivity associated with the following factors: (1) the long arm of the scale, higher sensitivity, and ( 14 15 金苹果,金苹果娱乐,金苹果平台 N518jb0M03CR and Planer, hand drills, grinders, cutters,tric h1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, elecets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.ety n(2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all saf e line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame.color" line as the ground wire. 5, high voltag-e electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuangres using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliabll) wim and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutragrounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 4, instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. m the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin linem fro gns, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5tion of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up sistallaen, through optical zoom 10 times"illumination", "welding". 3, electricity lines: (1) electric line, required for overhead ineral adjustable into 1mg/grid, and 0.1mg/grid, and 0.01mg/grid, will signs made transparent film, loaded in pointer Shang, thoptic balance of sense volume Gen-vity = grid/mg but in actually often with "sense volume" to said: sense volume = mg/grid electrothe size of the moment change the zero point. Balance of sensitivity General to signs of grid number to measure, that sensiti point adjustment screw is the distance from the fulcrum nut quality adjustment nut to adjust-lf d the length of the horizontal zeroal materials to relieve beam measures sensitivity adjustment screw is to use the height to adjust the quality of the nut itseshaped, "Alice beams" in order to reduce the impact deformation, knock out heavy and light met-titanium alloys light metal alloy. VFulcrum Onyx blade slightly below contains key Onyx blade's "Alice beams" type, and balance beam made of aluminium alloys or tion, the sensitivity adjustment screw located on the top of a vertical, set two zero point adjusting screw in the horizontal direc-ovate, hollowed out in the Middle, triangular-agate and knife blades sharp and smooth). So, balance beam made of triangular at is,e carrying heavy loads and balance beam deformation, agate cutters of the fulcrum and the load point of the contact point (thenter of gravity, high sensitivity. But the sensitivity of the balance are not only associated with these three factors, whil2) the beam of the scale is heavier, lower sensitivity, (3) pivot and the shorter the distance between the cthat balances the sensitivity associated with the following factors: (1) the long arm of the scale, higher sensitivity, and ( 16
/
本文档为【英语文章书写格式】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索