青岛装饰有限公司家庭居室装饰装修.doc.1
青岛嘉力装饰公司家庭居室装饰装修
工 程 施 工 合 同
发包方(甲方):
承包方(乙方):
合 同 编 号 :
requirements each only valve installation a only support hanging frame, if two valve clearance is less than 5D (d for pipeline OD), is in Middle loaded a only support hanging frame can; pipeline has multiple valve adjacent, requirements in valve group of sides the loaded a only support hanging frame, if middle has different diameter valve, is requirements in the valve Shang installation bracket or in the valve sides size head at the loaded a only support hanging frame. Designs should fully take into account expansion
1、 此
用于青岛嘉力装饰公司家庭居室装修工
程;
2、 甲、 乙双方当事人直接签定此合同的、应一式
两份,双方当事人各执一份。
requirements each only valve installation a only support hanging frame, if two valve clearance is less than 5D (d for pipeline OD), is in Middle loaded a only support hanging frame can; pipeline has multiple valve adjacent, requirements in valve group of sides the loaded a only support hanging frame, if middle has different diameter valve, is requirements in the valve Shang installation bracket or in the valve sides size head at the loaded a only support hanging frame. Designs should fully take into account expansion
第 3 页 共 11 页
青岛嘉力装饰公司装修工程
条款
发包方姓名(以下简称甲方):———————————————————————————
住所地址:———————————————————————————————————
联系电话:———————————————————————————————————
承包方(以下简称乙方):————————————————————————————
本工程
人: 联系电话:
施工队负责人: 联系电话:
依照(〈中华人民共和国合同法〉)及其它有关法律、法规的规定,结合本市家庭装饰装修的特点,甲、乙双方在平等、自愿、协商一致的基础上,就乙方承包甲方的家庭居家装饰装修工程(以下简称工程)的有关事宜,达成如下协议:
第一条 工程概况
1(1 工程地点
1(2 工程内容及做法(见附表一:装饰装修工程施工项目确认表、附表二:家庭装饰装
修工程内容和做法一览表)
1(3 工程承包方式,双方商定采取下列第—————种承包方式:
(1) 乙方包工、包全部材料;
(2) 乙方包工、部分材料,甲方提供部分材料,乙方包工、甲方包全部材料
(4 工程期限—————天; 1
开工日期 年 月 日
竣工日期 年 月 日
1(5 合同价款: 本合同工程总造价为(人民币)————————元
金额大写:
requirements each only valve installation a only support hanging frame, if two valve clearance is less than 5D (d for pipeline 第 3 页 共 11 页 OD), is in Middle loaded a only support hanging frame can; pipeline has multiple valve adjacent, requirements in valve group of sides the loaded a only support hanging frame, if middle has different diameter valve, is requirements in the valve Shang installation bracket or in the valve sides size head at the loaded a only support hanging frame. Designs should fully take into account expansion
第二条 施工图纸
双方商定施工图纸采取下列第 种方式提供:
(1甲方自行设计并提供施工图纸,图纸一式三份,甲方、乙方、施工队各执一份(见附2
表六:家庭居室装饰装修工程设计图纸)
2(2 甲方委托乙方设计施工图纸,图纸一式三份,甲方、乙方、施工队各执一份(见附表六:家庭居室装饰装修工程设计图纸),设计费 元由甲方支付(次设计费用不在工程价款内)。
第三条 甲方工作
3(1 开工前 天为乙方入场施工创造条件,包括:搬清室内家具、陈设或将室内不易搬动的家具、陈设归队、遮盖 ,以不影响施工为原则;
3(2 提供施工期间的水源、电源:
3(3 负责协调施工队与邻里之间的关系:
3(4 不拆动室内承重结构,如需拆改原建筑的非承重结构或设备管线,负责到有关部门办理相应的批准手续:
3(5 施工期间甲方仍需要部分使用该居室的,负责做好施工现场的保卫消防等项工作: 3(6 参与工程质量和施工进度的监督,负责材料进场、工程竣工验收。
第四条 乙方工作
4(1 施工中严格执行安全施工操作
、防火规定、施工规范及质量标准,按期保质完
成工程。
4(2 严格执行本市有关施工现场管理规定,不得扰民及污染环境。
4(3 保护好原居室室内的家具和陈设,保证居室室内上、下管道的畅通。 4(4 保证施工现场的整洁,工程完成后负责清扫施工现场。
第五条 工程变更
工程项目或施工方式如需要变更,双方应协商一致,签定书面变更协议,同时调整相关工程费用工期(见附表:装饰装修工程变更单)。
第六条 工期延误
6.1 对以下原因造成竣工日期延误,经甲方确认,工期相应顺延:
(1) 工程量变化或设计变更;
(2) 不可抗力;
(3) 甲方同意工期顺延的其他情况。
6.2 因甲方未按合同约定其应负责的工作而影响工期的,工期顺延;因甲方提供材料,设备不合格影响质量的,返工费用由甲方承担,工期顺延。 6.3 甲方未按期支付工程款,合同工期相应顺延。
6.4 因乙方责任不能按期完成,工期不顺延;因乙方原因造成工程质量存在问题requirements each only valve installation a only support hanging frame, if two valve clearance is less than 5D (d for pipeline OD), is in Middle loaded a only support hanging frame can; pipeline has multiple valve adjacent, requirements in valve group of sides the loaded a only support hanging frame, if middle has different diameter valve, is requirements in the valve Shang installation bracket or in the valve sides size head at the loaded a only support hanging frame. Designs should fully take into account expansion
第 5 页 共 11 页
的,返工费用由乙方承担,工期不顺延。
第七条 工程验收和保修
7.1 双方约定在施工过程中分下列几个段对工程质量进行验收:
? 材料进场;
? 隐蔽工程验收(水路、电路);
? 木工活框架结束,油工进场;
? 竣工验收。
乙方应提前两天通知甲方验收,阶段验收合格后应填写工程验收单(见附表:
工程验收单);
7.2 工程竣工后,乙方应通知甲方验收,甲方应自接到验收通知后两天内组
织验收,填写工程验收单(见附表:工程验收单)。在工程款结算清后,办
理移交手续(见附表:工程结算单)。
7.3 本工程自验收合格双方签字之日起保修期为一年,验收合格签字后,填
写工程保修单(见附表:工程保修单)。
第八条 工程款支付方式
8.1 双方约定按下列第 种方式支付工程款:
家庭装饰装修市场,工程款分两 ? 此合同签定地为:本市
次支付:第一次于开工前三日,甲方向乙方支付合同总金额的60%,即
元;第二次于工程进度过半,将剩余工程款的40%,即 元,由市场的有关管理部门负责带收。
? 合同生效后,甲方按下列表中的约定直接向乙方支付工程款: 支付次数 支付时间 支付金额(元) 第一次 开工前三日 60%
第二次 工程进度过半 35%(工程
增减项费用)
第三次 双方验收合格 5%(余款结
清)
3、其他支付方式:
8.2 工程进度过半指:木工活框架结束,油工进场。
8.3 工程验收合格后,乙方应向甲方提出工程结算,并将有关资料送交甲方。甲方接到资料后 日内如未有异议,即视为同意,双方应填写工程结算单(见附表:工程结算单)并签字,甲方应在签字时向乙方结清工程尾款。
第九条 违约责任
9.1 合同双方当事人中任何一方因未履行合同约定或违反国家法律、法规即有关政策,受到requirements each only valve installation a only support hanging frame, if two valve clearance is less than 5D (d for pipeline 第 5 页 共 11 页 OD), is in Middle loaded a only support hanging frame can; pipeline has multiple valve adjacent, requirements in valve group of sides the loaded a only support hanging frame, if middle has different diameter valve, is requirements in the valve Shang installation bracket or in the valve sides size head at the loaded a only support hanging frame. Designs should fully take into account expansion
罚款或给乙方造成经济损失均由责任方承担责任,并赔偿给对方造成的经济损失; 9.2 未办理验收手续,甲方提出使用或擅自动用工程成品而造成损失的,由甲方负责;
9.3 因一方原因,造成合同无法继续履行时,该房应及时通知另一方,办理合同终止手续,并由负责方赔偿相应的经济损失;
9.4 甲方未按期支付第二、第三次工程款的,每延误一天向对方支付违约金工程造价的1%元。
9.5 由于乙方原因工程质量达不到双方约定的质量标准,乙方负责修理,工期不予顺延;
第十条 几项具体规定
10.1 因工程施工而产生的垃圾,由乙方负责运出施工现场,并负责将垃圾运到指定的地点,甲方负责垃圾清运费用(人民币) 元(此费用在工程价款内); 10.2 施工期间,甲方将屋门钥匙 把,交给乙方施工负责人 负责保管。工程竣工后,甲方提供新锁 把,由乙方当场负责安装交付使用。
第十一条 附 则
11.1 本合同经甲、乙双方签字(盖章)后生效。
11.2 本合同签定后工程不得转包。
11.3 甲、乙双方直接签定合同的,合同一式两份,甲、乙双方各执一份。 11.4 合同履行完后自动终止。
第十二条 合同附件
附件一:装饰装修工程施工项目确认表
附件二:家庭居室装饰装修工程内容和做法一览表
附件三:家庭居室装饰装修工程报价表
附件四:家庭居室装饰装修工程设计图纸
附件五:装饰装修工程变更单
附件六:工程保修单
第十三条 其他约定条款
装饰装修工程施工项目确认表(一) requirements each only valve installation a only support hanging frame, if two valve clearance is less than 5D (d for pipeline OD), is in Middle loaded a only support hanging frame can; pipeline has multiple valve adjacent, requirements in valve group of sides the loaded a only support hanging frame, if middle has different diameter valve, is requirements in the valve Shang installation bracket or in the valve sides size head at the loaded a only support hanging frame. Designs should fully take into account expansion
第 7 页 共 11 页
(附表一)
序项目居室居室居室门厅卫生卫生阳台厨房
号 施工 ? 2? 3? ? 间? 间2? ?
?
1.涂料
2.乳 一
、胶漆 顶 3.吊顶
4.顶纸
5.灯池
6.塑
料板 棚
9.颜色
1.通
体砖 二、
地面 2.釉
面砖
3.木
地板
4.花
岗岩
5.地毯
9.颜色
1.涂料 三
、2.乳胶 墙 漆
3.壁纸 体 4.软包
5.壁板
6.大理
石
7.瓷砖
9..颜色
requirements each only valve installation a only support hanging frame, if two valve clearance is less than 5D (d for pipeline 第 7 页 共 11 页 OD), is in Middle loaded a only support hanging frame can; pipeline has multiple valve adjacent, requirements in valve group of sides the loaded a only support hanging frame, if middle has different diameter valve, is requirements in the valve Shang installation bracket or in the valve sides size head at the loaded a only support hanging frame. Designs should fully take into account expansion
甲方(签章): 乙方(盖章):
法定代表人:
委托代理人:
年 月 日 年 月 日
requirements each only valve installation a only support hanging frame, if two valve clearance is less than 5D (d for pipeline OD), is in Middle loaded a only support hanging frame can; pipeline has multiple valve adjacent, requirements in valve group of sides the loaded a only support hanging frame, if middle has different diameter valve, is requirements in the valve Shang installation bracket or in the valve sides size head at the loaded a only support hanging frame. Designs should fully take into account expansion
第 9 页 共 11 页
施工现场安全规章制度
1、 施工人员进入现场必须戴好安全帽、系好帽带,不得赤脚、穿拖鞋,不得吸烟、饮酒。
2、 施工人员必须严格遵守现场安全纪律及本工程操作规程不得违章指挥操作。 3、 操作工人作业时必须做好自身安全防护及周边防护工作,以保证自己和他人的安全和健康。
4、 使用气焊须由合格电气焊工操作,乙炔和氧气瓶使用必须符合规定,作业前须到长话局保卫部开具动火证。
5、 使用电焊须由合格焊工作业,焊机一次线长度不得大于5米,二次线不得大于30米,零线和把线不得破皮、老化,接头不得超过3处。 6、 对于现场安全防护设施不得随意破坏和拆除,若因工作需要,须报长话局甲方,同意后方可拆除。
7、 对于现场出现立体交叉作业时,须报负责人待有措施并落实后再进行施工。 8、 施工人员在现场行走,应该注意安全,注意电气线路,机械设备等,以免造成事故。
9、 施工现场三级移动电箱(手提箱),接线时必须按规定接线,接线时必须认真负责,接好线路认定无疑时方可合闸送电使用,工作完毕必须由维护电工拆线。
10、施工现场供电箱,一级到二级电箱的电源线路由总包单位负责提供,并维修检查清扫,自备三级电箱及移动电箱(手提箱)三级箱电源线接在二级电箱上,严禁移动电箱直接从二级电箱上接线;如工作需要要在一级电箱上接线必须通过总包有关领导同意后方可接线。
11、进入施工现场的电箱、电缆线路必须符合国家规定,箱体内部漏电器灵敏可靠,电器设备完整固定。
12、施工现场在使用中的三级电箱和移动电箱的电缆线路,必须把线路悬挂好,不得乱拉乱扯,在无法悬挂的地方,必须放在安全可靠地区。 13、施工现场维护电器设备人员必须按规定每月定期检查,本单位的电器设备,保证施工人员安全,放心用电。
14、停用的开关箱与电器设备或工作完毕,必须拉闸断电并锁好箱体。 15、使用中的移动电箱,如上下动,禁止用电缆线代替绳子起吊电箱,必须断电,方可移动。
requirements each only valve installation a only support hanging frame, if two valve clearance is less than 5D (d for pipeline 第 9 页 共 11 页 OD), is in Middle loaded a only support hanging frame can; pipeline has multiple valve adjacent, requirements in valve group of sides the loaded a only support hanging frame, if middle has different diameter valve, is requirements in the valve Shang installation bracket or in the valve sides size head at the loaded a only support hanging frame. Designs should fully take into account expansion
附件6:
工程保修单
发包人:
承包人: 公司名称 联系电话 用户姓名 登记编号 装修房地址 联系电话 施工单位负责人 施工负责人 进场施工日期 竣工验收日期 保修日期 年 月 日 至 年 月 日
发包人代表(签章): 承包人代表(签章):
年 月 日
备注:
(1)保修期内由于承包人施工不当造成质量问题,承包人无条件地进行维
修。
(2)保修期内如属发包人使用不当造成损坏,直至不能正常使用,承包人
酌情收费。
(3)本保修协议需发包人、承包人双主签字。
requirements each only valve installation a only support hanging frame, if two valve clearance is less than 5D (d for pipeline OD), is in Middle loaded a only support hanging frame can; pipeline has multiple valve adjacent, requirements in valve group of sides the loaded a only support hanging frame, if middle has different diameter valve, is requirements in the valve Shang installation bracket or in the valve sides size head at the loaded a only support hanging frame. Designs should fully take into account expansion
第 11 页 共 11 页
工 程 变 更 单
工程名称: 合 同 号:
单 位: 支付编号: 年 月 日
合同名称: 合同编号:
序号 项目名称 单位 工程数量 单价 合价 备注
1
2
3
4
5
6
7
8
9
合 计
人民币大写
备注:
项目经理: 项目总监:
现场负责人: 合 约 部:
甲 方: 乙 方:
requirements each only valve installation a only support hanging frame, if two valve clearance is less than 5D (d for pipeline 第 11 页 共 11 页 OD), is in Middle loaded a only support hanging frame can; pipeline has multiple valve adjacent, requirements in valve group of sides the loaded a only support hanging frame, if middle has different diameter valve, is requirements in the valve Shang installation bracket or in the valve sides size head at the loaded a only support hanging frame. Designs should fully take into account expansion