交强险费率_保险_买车一条龙
机动车交通事故责任强制保险基础费率
金额单位:人民币元
车辆大类
序号
车辆明细分类
保费
一、家庭自用车
1
家庭自用汽车6座以下
1,050
2
家庭自用汽车6座及以上
1,100
edges should be cleaned, after making sure that no defect shall be marked with a marker pen to write down welding near the weld, including the slogan of welding, welders, etc. (16) welding Qian Preheat and the welding Hou heat treatment pipe welding Qian Preheat and the welding Hou heat treatment process conditions welding Qian Preheat and the welding Hou heat treatment temperature table project material welding Qian preheat temperature (?) welding Hou heat treatment and the insulation time (?/H) wall thick (mm) temperature (?) wall thick (mm) temperature (?) 20 ? 26 100~200 >36 600~650/1-1.5 15CrMo ? 10 150~200 >10 670~700/1.2-2 Preheat and the heat treatment process in the, Inner and outer wall temperature shall be kept uniform, in order to avoid internal stresses. Preheating before welding and post weld heat treatment, shall measure and record the temperature, temperature measurement locations and number of points are reasonable. Prone to weld delayed crack of steel, post weld heat treatment after welding should be carried out promptly, when not conducting timely post weld heat treatment, should be uniformly heated to 200~300? immediately after welding and insulation and slow cooling, ... 26mm more than 20 steel pipe welding preheating before welding should be carried out, 36mm the above heat treatment after welding should be done. Before welding and heat treatment used oxyacetylene flame heating, heat treatment after welding using special heat treatment after welding equipment. Hardness after heat treatment of welds needed testing. 6.5.4 sides of the dissimilar steel welding when were non-austenitic steel or austenitic steel, alloy content according to lower one side of the base metal or selecting welding material in between. When one of the sides of material when austenitic steels, should select the
二、非营业客车
3
企业非营业汽车6座以下 1,000
4
企业非营业汽车6-10座 1,190
5
企业非营业汽车10-20座 1,300
6
企业非营业汽车20座以上 1,580
7
机关非营业汽车6座以下 950
edges should be cleaned, after making sure that no defect shall be marked with a marker pen to write down welding near the weld, including the slogan of welding, welders, etc. (16) welding Qian Preheat and the welding Hou heat treatment pipe welding Qian Preheat and the welding Hou heat treatment process conditions welding Qian Preheat and the welding Hou heat treatment temperature table project material welding Qian preheat temperature (?) welding Hou heat treatment and the insulation time (?/H) wall thick (mm) temperature (?) wall thick (mm) temperature (?) 20 ? 26 100~200 >36 600~650/1-1.5 15CrMo ? 10 150~200 >10 670~700/1.2-2 Preheat and the heat treatment process in the, Inner and outer wall temperature shall be kept uniform, in order to avoid internal stresses. Preheating before welding and post weld heat treatment, shall measure and record the temperature, temperature measurement locations and number of points are reasonable. Prone to weld delayed crack of steel, post weld heat treatment after welding should be carried out promptly, when not conducting timely post weld heat treatment, should be uniformly heated to 200~300? immediately after welding and insulation and slow cooling, ... 26mm more than 20 steel pipe welding preheating before welding should be carried out, 36mm the above heat treatment after welding should be done. Before welding and heat treatment used oxyacetylene flame heating, heat treatment after welding using special heat treatment after welding equipment. Hardness after heat treatment of welds needed testing. 6.5.4 sides of the dissimilar steel welding when were non-austenitic steel or austenitic steel, alloy content according to lower one side of the base metal or selecting welding material in between. When one of the sides of material when austenitic steels, should select the
8
机关非营业汽车6-10座 1,070
9
机关非营业汽车10-20座 1,140
10
机关非营业汽车20座以上 1,320
三、营业客车
11
营业出租租赁6座以下 1,800
12
营业出租租赁6-10座
edges should be cleaned, after making sure that no defect shall be marked with a marker pen to write down welding near the weld3 , including the slogan of welding, welders, etc. (16) welding Qian Preheat and the welding Hou heat treatment pipe welding Qian Preheat and the welding Hou heat treatment process conditions welding Qian Preheat and the welding Hou heat treatment temperature table project material welding Qian preheat temperature (?) welding Hou heat treatment and the insulation time (?/H) wall thick (mm) temperature (?) wall thick (mm) temperature (?) 20 ? 26 100~200 >36 600~650/1-1.5 15CrMo ? 10 150~200 >10 670~700/1.2-2 Preheat and the heat treatment process in the, Inner and outer wall temperature shall be kept uniform, in order to avoid internal stresses. Preheating before welding and post weld heat treatment, shall measure and record the temperature, temperature measurement locations and number of points are reasonable. Prone to weld delayed crack of steel, post weld heat treatment after welding should be carried out promptly, when not conducting timely post weld heat treatment, should be uniformly heated to 200~300? immediately after welding and insulation and slow cooling, ... 26mm more than 20 steel pipe welding preheating before welding should be carried out, 36mm the above heat treatment after welding should be done. Before welding and heat treatment used oxyacetylene flame heating, heat treatment after welding using special heat treatment after welding equipment. Hardness after heat treatment of welds needed testing. 6.5.4 sides of the dissimilar steel welding when were non-austenitic steel or austenitic steel, alloy content according to lower one side of the base metal or selecting welding material in between. When one of the sides of material when austenitic steels, should select the
2,360
13
营业出租租赁10-20座 2,580
14
营业出租租赁20-36座 3,730
15
营业出租租赁36座以上 3,880
16
营业城市公交6-10座 2,250
17
营业城市公交10-20座 edges should be cleaned, after making sure that no defect shall be marked with a marker pen to write down welding near the weld, including the slogan of welding, welders, etc. (16) welding Qian Preheat and the welding Hou heat treatment pipe welding Qian Preheat and the welding Hou heat treatment process conditions welding Qian Preheat and the welding Hou heat treatment temperature table project material welding Qian preheat temperature (?) welding Hou heat treatment and the insulation time (?/H) wall thick (mm) temperature (?) wall thick (mm) temperature (?) 20 ? 26 100~200 >36 600~650/1-1.5 15CrMo ? 10 150~200 >10 670~700/1.2-2 Preheat and the heat treatment process in the, Inner and outer wall temperature shall be kept uniform, in order to avoid internal stresses. Preheating before welding and post weld heat treatment, shall measure and record the temperature, temperature measurement locations and number of points are reasonable. Prone to weld delayed crack of steel, post weld heat treatment after welding should be carried out promptly, when not conducting timely post weld heat treatment, should be uniformly heated to 200~300? immediately after welding and insulation and slow cooling, ... 26mm more than 20 steel pipe welding preheating before welding should be carried out, 36mm the above heat treatment after welding should be done. Before welding and heat treatment used oxyacetylene flame heating, heat treatment after welding using special heat treatment after welding equipment. Hardness after heat treatment of welds needed testing. 6.5.4 sides of the dissimilar steel welding when were non-austenitic steel or austenitic steel, alloy content according to lower one side of the base metal or selecting welding material in between. When one of the sides of material when austenitic steels, should select the
2,520
18
营业城市公交20-36座 3,270
19
营业城市公交36座以上 4,250
20
营业公路客运6-10座 2,350
21
营业公路客运10-20座 2,620
22
营业公路客运20-36座
edges should be cleaned, after making sure that no defect shall be marked with a marker pen to write down welding near the weld5 , including the slogan of welding, welders, etc. (16) welding Qian Preheat and the welding Hou heat treatment pipe welding Qian Preheat and the welding Hou heat treatment process conditions welding Qian Preheat and the welding Hou heat treatment temperature table project material welding Qian preheat temperature (?) welding Hou heat treatment and the insulation time (?/H) wall thick (mm) temperature (?) wall thick (mm) temperature (?) 20 ? 26 100~200 >36 600~650/1-1.5 15CrMo ? 10 150~200 >10 670~700/1.2-2 Preheat and the heat treatment process in the, Inner and outer wall temperature shall be kept uniform, in order to avoid internal stresses. Preheating before welding and post weld heat treatment, shall measure and record the temperature, temperature measurement locations and number of points are reasonable. Prone to weld delayed crack of steel, post weld heat treatment after welding should be carried out promptly, when not conducting timely post weld heat treatment, should be uniformly heated to 200~300? immediately after welding and insulation and slow cooling, ... 26mm more than 20 steel pipe welding preheating before welding should be carried out, 36mm the above heat treatment after welding should be done. Before welding and heat treatment used oxyacetylene flame heating, heat treatment after welding using special heat treatment after welding equipment. Hardness after heat treatment of welds needed testing. 6.5.4 sides of the dissimilar steel welding when were non-austenitic steel or austenitic steel, alloy content according to lower one side of the base metal or selecting welding material in between. When one of the sides of material when austenitic steels, should select the
3,420
23
营业公路客运36座以上 4,690
四、非营业货车
24
非营业货车2吨以下 1,200
25
非营业货车2-5吨 1,630
26
非营业货车5-10吨 1,750
27
edges should be cleaned, after making sure that no defect shall be marked with a marker pen to write down welding near the weld, including the slogan of welding, welders, etc. (16) welding Qian Preheat and the welding Hou heat treatment pipe welding Qian Preheat and the welding Hou heat treatment process conditions welding Qian Preheat and the welding Hou heat treatment temperature table project material welding Qian preheat temperature (?) welding Hou heat treatment and the insulation time (?/H) wall thick (mm) temperature (?) wall thick (mm) temperature (?) 20 ? 26 100~200 >36 600~650/1-1.5 15CrMo ? 10 150~200 >10 670~700/1.2-2 Preheat and the heat treatment process in the, Inner and outer wall temperature shall be kept uniform, in order to avoid internal stresses. Preheating before welding and post weld heat treatment, shall measure and record the temperature, temperature measurement locations and number of points are reasonable. Prone to weld delayed crack of steel, post weld heat treatment after welding should be carried out promptly, when not conducting timely post weld heat treatment, should be uniformly heated to 200~300? immediately after welding and insulation and slow cooling, ... 26mm more than 20 steel pipe welding preheating before welding should be carried out, 36mm the above heat treatment after welding should be done. Before welding and heat treatment used oxyacetylene flame heating, heat treatment after welding using special heat treatment after welding equipment. Hardness after heat treatment of welds needed testing. 6.5.4 sides of the dissimilar steel welding when were non-austenitic steel or austenitic steel, alloy content according to lower one side of the base metal or selecting welding material in between. When one of the sides of material when austenitic steels, should select the
非营业货车10吨以上 2,220
五、营业货车
28
营业货车2吨以下 1,850
29
营业货车2-5吨 3,070
30
营业货车5-10吨 3,450
31
营业货车10吨以上 4,480
edges should be cleaned, after making sure that no defect shall be marked with a marker pen to write down welding near the weld7 , including the slogan of welding, welders, etc. (16) welding Qian Preheat and the welding Hou heat treatment pipe welding Qian Preheat and the welding Hou heat treatment process conditions welding Qian Preheat and the welding Hou heat treatment temperature table project material welding Qian preheat temperature (?) welding Hou heat treatment and the insulation time (?/H) wall thick (mm) temperature (?) wall thick (mm) temperature (?) 20 ? 26 100~200 >36 600~650/1-1.5 15CrMo ? 10 150~200 >10 670~700/1.2-2 Preheat and the heat treatment process in the, Inner and outer wall temperature shall be kept uniform, in order to avoid internal stresses. Preheating before welding and post weld heat treatment, shall measure and record the temperature, temperature measurement locations and number of points are reasonable. Prone to weld delayed crack of steel, post weld heat treatment after welding should be carried out promptly, when not conducting timely post weld heat treatment, should be uniformly heated to 200~300? immediately after welding and insulation and slow cooling, ... 26mm more than 20 steel pipe welding preheating before welding should be carried out, 36mm the above heat treatment after welding should be done. Before welding and heat treatment used oxyacetylene flame heating, heat treatment after welding using special heat treatment after welding equipment. Hardness after heat treatment of welds needed testing. 6.5.4 sides of the dissimilar steel welding when were non-austenitic steel or austenitic steel, alloy content according to lower one side of the base metal or selecting welding material in between. When one of the sides of material when austenitic steels, should select the
六、特种车 32
特种车一 6,040
33
特种车二 2,430
34
特种车三 1,320
35
特种车四 5,660
七、摩托车 36
摩托车50CC及以下
edges should be cleaned, after making sure that no defect shall be marked with a marker pen to write down welding near the weld, including the slogan of welding, welders, etc. (16) welding Qian Preheat and the welding Hou heat treatment pipe welding Qian Preheat and the welding Hou heat treatment process conditions welding Qian Preheat and the welding Hou heat treatment temperature table project material welding Qian preheat temperature (?) welding Hou heat treatment and the insulation time (?/H) wall thick (mm) temperature (?) wall thick (mm) temperature (?) 20 ? 26 100~200 >36 600~650/1-1.5 15CrMo ? 10 150~200 >10 670~700/1.2-2 Preheat and the heat treatment process in the, Inner and outer wall temperature shall be kept uniform, in order to avoid internal stresses. Preheating before welding and post weld heat treatment, shall measure and record the temperature, temperature measurement locations and number of points are reasonable. Prone to weld delayed crack of steel, post weld heat treatment after welding should be carried out promptly, when not conducting timely post weld heat treatment, should be uniformly heated to 200~300? immediately after welding and insulation and slow cooling, ... 26mm more than 20 steel pipe welding preheating before welding should be carried out, 36mm the above heat treatment after welding should be done. Before welding and heat treatment used oxyacetylene flame heating, heat treatment after welding using special heat treatment after welding equipment. Hardness after heat treatment of welds needed testing. 6.5.4 sides of the dissimilar steel welding when were non-austenitic steel or austenitic steel, alloy content according to lower one side of the base metal or selecting welding material in between. When one of the sides of material when austenitic steels, should select the
120
37
摩托车50CC-250CC(含) 180
38
摩托车250CC以上及侧三轮 400
八、拖拉机
39
农用型拖拉机14.7KW及以下 待定
40
农用型拖拉机14.7KW以上 待定
41
edges should be cleaned, after making sure that no defect shall be marked with a marker pen to write down welding near the weld9 , including the slogan of welding, welders, etc. (16) welding Qian Preheat and the welding Hou heat treatment pipe welding Qian Preheat and the welding Hou heat treatment process conditions welding Qian Preheat and the welding Hou heat treatment temperature table project material welding Qian preheat temperature (?) welding Hou heat treatment and the insulation time (?/H) wall thick (mm) temperature (?) wall thick (mm) temperature (?) 20 ? 26 100~200 >36 600~650/1-1.5 15CrMo ? 10 150~200 >10 670~700/1.2-2 Preheat and the heat treatment process in the, Inner and outer wall temperature shall be kept uniform, in order to avoid internal stresses. Preheating before welding and post weld heat treatment, shall measure and record the temperature, temperature measurement locations and number of points are reasonable. Prone to weld delayed crack of steel, post weld heat treatment after welding should be carried out promptly, when not conducting timely post weld heat treatment, should be uniformly heated to 200~300? immediately after welding and insulation and slow cooling, ... 26mm more than 20 steel pipe welding preheating before welding should be carried out, 36mm the above heat treatment after welding should be done. Before welding and heat treatment used oxyacetylene flame heating, heat treatment after welding using special heat treatment after welding equipment. Hardness after heat treatment of welds needed testing. 6.5.4 sides of the dissimilar steel welding when were non-austenitic steel or austenitic steel, alloy content according to lower one side of the base metal or selecting welding material in between. When one of the sides of material when austenitic steels, should select the
运输型拖拉机14.7KW及以下
待定
42
运输型拖拉机14.7KW以上
待定
1、座位和吨位的分类都按照“含起点不含终点”的原则来解释;
2、特种车一:油罐车、汽罐车、液罐车、冷藏车;
特种车二:用于牵引、清障、清扫、清洁、起重、装卸、升降、搅拌、挖掘、推土等的各种专用机动车;
特种车三:装有固定专用仪器设备从事专业工作的监测、消防、医疗、电视转播等的各种专用机动车;
特种车四:集装箱拖头。
3、挂车根据实际的使用性质并按照对应吨位货车的50%计算。 edges should be cleaned, after making sure that no defect shall be marked with a marker pen to write down welding near the weld, including the slogan of welding, welders, etc. (16) welding Qian Preheat and the welding Hou heat treatment pipe welding Qian Preheat and the welding Hou heat treatment process conditions welding Qian Preheat and the welding Hou heat treatment temperature table project material welding Qian preheat temperature (?) welding Hou heat treatment and the insulation time (?/H) wall thick (mm) temperature (?) wall thick (mm) temperature (?) 20 ? 26 100~200 >36 600~650/1-1.5 15CrMo ? 10 150~200 >10 670~700/1.2-2 Preheat and the heat treatment process in the, Inner and outer wall temperature shall be kept uniform, in order to avoid internal stresses. Preheating before welding and post weld heat treatment, shall measure and record the temperature, temperature measurement locations and number of points are reasonable. Prone to weld delayed crack of steel, post weld heat treatment after welding should be carried out promptly, when not conducting timely post weld heat treatment, should be uniformly heated to 200~300? immediately after welding and insulation and slow cooling, ... 26mm more than 20 steel pipe welding preheating before welding should be carried out, 36mm the above heat treatment after welding should be done. Before welding and heat treatment used oxyacetylene flame heating, heat treatment after welding using special heat treatment after welding equipment. Hardness after heat treatment of welds needed testing. 6.5.4 sides of the dissimilar steel welding when were non-austenitic steel or austenitic steel, alloy content according to lower one side of the base metal or selecting welding material in between. When one of the sides of material when austenitic steels, should select the
edges should be cleaned, after making sure that no defect shall be marked with a marker pen to write down welding near the weld11 , including the slogan of welding, welders, etc. (16) welding Qian Preheat and the welding Hou heat treatment pipe welding Qian Preheat and the welding Hou heat treatment process conditions welding Qian Preheat and the welding Hou heat treatment temperature table project material welding Qian preheat temperature (?) welding Hou heat treatment and the insulation time (?/H) wall thick (mm) temperature (?) wall thick (mm) temperature (?) 20 ? 26 100~200 >36 600~650/1-1.5 15CrMo ? 10 150~200 >10 670~700/1.2-2 Preheat and the heat treatment process in the, Inner and outer wall temperature shall be kept uniform, in order to avoid internal stresses. Preheating before welding and post weld heat treatment, shall measure and record the temperature, temperature measurement locations and number of points are reasonable. Prone to weld delayed crack of steel, post weld heat treatment after welding should be carried out promptly, when not conducting timely post weld heat treatment, should be uniformly heated to 200~300? immediately after welding and insulation and slow cooling, ... 26mm more than 20 steel pipe welding preheating before welding should be carried out, 36mm the above heat treatment after welding should be done. Before welding and heat treatment used oxyacetylene flame heating, heat treatment after welding using special heat treatment after welding equipment. Hardness after heat treatment of welds needed testing. 6.5.4 sides of the dissimilar steel welding when were non-austenitic steel or austenitic steel, alloy content according to lower one side of the base metal or selecting welding material in between. When one of the sides of material when austenitic steels, should select the