为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

补充医疗保险报销模板2

2017-09-27 10页 doc 156KB 28阅读

用户头像

is_083599

暂无简介

举报
补充医疗保险报销模板2补充医疗保险报销模板2 姓名:XXX 身份证号:XXXXXXXXXXXXXXX 银行账号: ×××××× 7.2 7.2.1 material construction technical measures of inspection and management built tank selection of materials and accessories, should have the quality certificate or certificate of quality re-inspection. ...
补充医疗保险报销模板2
补充医疗保险报销2 姓名:XXX 身份证号:XXXXXXXXXXXXXXX 银行账号: ×××××× 7.2 7.2.1 material construction technical measures of inspection and management built tank selection of materials and accessories, should have the quality certificate or certificate of quality re-inspection. Construction selection of tank steel plate, must be carried out by Visual inspection, no serious damage and distortion. Surface corrosion of steel plate thickness reduction amount, actual negative deviation of steel plate and scratching depth and should comply with plate thickness tolerance requirements. Without stratification, porosity, surface scarring, RIP, crease, inclusion and press in the oxide. Electrode must have a quality certificate, which include chemical composition and mechanical properties of deposited metal tolerance. Electrode storage and stacking to expert management, establishment of the electrode, electrode diameter electrode and models should be neatly stacked separately. Establish a strict electrode system, record fill electrode, electrode should be used strictly for baking and issued as required. All plates should be classified by material quality and specifications of piling up. To prevent the string material should be established according to the purpose and use of books. All parts should be strictly according to the drawing check acceptance, and product certificates. 7.2.2 basis of acceptance before the construction of storage tank should be designed in accordance with the corresponding basic documentation requirements and API620 the relevant requirements for acceptance, and check the basic construction unit to provide checks of records. Foundation Center height tolerance is ? 20mm. Base surface should be flat and dense, and through cracks in the prominent bulge, SAG-free. Tank tank bolt, the inner tank of anchor bolt, belt should be in water based embedded fixed. 7.2.3 operations can in prefabricated Assembly and testing process used in the product are as follows: the arcs 发票总张数:××张 申请金额:××元 联系方式:×××××× 7.2 7.2.1 material construction technical measures of inspection and management built tank selection of materials and accessories, should have the quality certificate or certificate of quality re-inspection. Construction selection of tank steel plate, must be carried out by Visual inspection, no serious damage and distortion. Surface corrosion of steel plate thickness reduction amount, actual negative deviation of steel plate and scratching depth and should comply with plate thickness tolerance requirements. Without stratification, porosity, surface scarring, RIP, crease, inclusion and press in the oxide. Electrode must have a quality certificate, which include chemical composition and mechanical properties of deposited metal tolerance. Electrode storage and stacking to expert management, establishment of the electrode, electrode diameter electrode and models should be neatly stacked separately. Establish a strict electrode system, record fill electrode, electrode should be used strictly for baking and issued as required. All plates should be classified by material quality and specifications of piling up. To prevent the string material should be established according to the purpose and use of books. All parts should be strictly according to the drawing check acceptance, and product certificates. 7.2.2 basis of acceptance before the construction of storage tank should be designed in accordance with the corresponding basic documentation requirements and API620 the relevant requirements for acceptance, and check the basic construction unit to provide checks of records. Foundation Center height tolerance is ? 20mm. Base surface should be flat and dense, and through cracks in the prominent bulge, SAG-free. Tank tank bolt, the inner tank of anchor bolt, belt should be in water based embedded fixed. 7.2.3 operations can in prefabricated Assembly and testing process used in the product are as follows: the arcs 1.票据按时间先后顺序正向粘贴,不能遮盖姓名和发票号码。 2.票据名称必须与被保人姓名一致,且有财政部监章和医院鲜章。 3.票据粘贴在A4纸上 请在每张票据上手写本人姓名 本页共有票据大写, ,张 本页票据金额共计, , 7.2 7.2.1 material construction technical measures of inspection and management built tank selection of materials and accessories, should have the quality certificate or certificate of quality re-inspection. Construction selection of tank steel plate, must be carried out by Visual inspection, no serious damage and distortion. Surface corrosion of steel plate thickness reduction amount, actual negative deviation of steel plate and scratching depth and should comply with plate thickness tolerance requirements. Without stratification, porosity, surface scarring, RIP, crease, inclusion and press in the oxide. Electrode must have a quality certificate, which include chemical composition and mechanical properties of deposited metal tolerance. Electrode storage and stacking to expert management, establishment of the electrode, electrode diameter electrode and models should be neatly stacked separately. Establish a strict electrode system, record fill electrode, electrode should be used strictly for baking and issued as required. All plates should be classified by material quality and specifications of piling up. To prevent the string material should be established according to the purpose and use of books. All parts should be strictly according to the drawing check acceptance, and product certificates. 7.2.2 basis of acceptance before the construction of storage tank should be designed in accordance with the corresponding basic documentation requirements and API620 the relevant requirements for acceptance, and check the basic construction unit to provide checks of records. Foundation Center height tolerance is ? 20mm. Base surface should be flat and dense, and through cracks in the prominent bulge, SAG-free. Tank tank bolt, the inner tank of anchor bolt, belt should be in water based embedded fixed. 7.2.3 operations can in prefabricated Assembly and testing process used in the product are as follows: the arcs 1.票据正向粘贴,不能遮盖姓名和发票号码 2.票据必须有财政部监章和药店发票专用章 请在每张票据上手写本人姓名 7.2 7.2.1 material construction technical measures of inspection and management built tank selection of materials and accessories, should have the quality certificate or certificate of quality re-inspection. Construction selection of tank steel plate, must be carried out by Visual inspection, no serious damage and distortion. Surface corrosion of steel plate thickness reduction amount, actual negative deviation of steel plate and scratching depth and should comply with plate thickness tolerance requirements. Without stratification, porosity, surface scarring, RIP, crease, inclusion and press in the oxide. Electrode must have a quality certificate, which include chemical composition and mechanical properties of deposited metal tolerance. Electrode storage and stacking to expert management, establishment of the electrode, electrode diameter electrode and models should be neatly stacked separately. Establish a strict electrode system, record fill electrode, electrode should be used strictly for baking and issued as required. All plates should be classified by material quality and specifications of piling up. To prevent the string material should be established according to the purpose and use of books. All parts should be strictly according to the drawing check acceptance, and product certificates. 7.2.2 basis of acceptance before the construction of storage tank should be designed in accordance with the corresponding basic documentation requirements and API620 the relevant requirements for acceptance, and check the basic construction unit to provide checks of records. Foundation Center height tolerance is ? 20mm. Base surface should be flat and dense, and through cracks in the prominent bulge, SAG-free. Tank tank bolt, the inner tank of anchor bolt, belt should be in water based embedded fixed. 7.2.3 operations can in prefabricated Assembly and testing process used in the product are as follows: the arcs 本页共有票据大写, ,张 本页票据金额共 7.2 7.2.1 material construction technical measures of inspection and management built tank selection of materials and accessories, should have the quality certificate or certificate of quality re-inspection. Construction selection of tank steel plate, must be carried out by Visual inspection, no serious damage and distortion. Surface corrosion of steel plate thickness reduction amount, actual negative deviation of steel plate and scratching depth and should comply with plate thickness tolerance requirements. Without stratification, porosity, surface scarring, RIP, crease, inclusion and press in the oxide. Electrode must have a quality certificate, which include chemical composition and mechanical properties of deposited metal tolerance. Electrode storage and stacking to expert management, establishment of the electrode, electrode diameter electrode and models should be neatly stacked separately. Establish a strict electrode system, record fill electrode, electrode should be used strictly for baking and issued as required. All plates should be classified by material quality and specifications of piling up. To prevent the string material should be established according to the purpose and use of books. All parts should be strictly according to the drawing check acceptance, and product certificates. 7.2.2 basis of acceptance before the construction of storage tank should be designed in accordance with the corresponding basic documentation requirements and API620 the relevant requirements for acceptance, and check the basic construction unit to provide checks of records. Foundation Center height tolerance is ? 20mm. Base surface should be flat and dense, and through cracks in the prominent bulge, SAG-free. Tank tank bolt, the inner tank of anchor bolt, belt should be in water based embedded fixed. 7.2.3 operations can in prefabricated Assembly and testing process used in the product are as follows: the arcs
/
本文档为【补充医疗保险报销模板2】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索