为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

医生护士英语会话

2017-12-19 20页 doc 60KB 15阅读

用户头像

is_477730

暂无简介

举报
医生护士英语会话医生护士英语会话 医生护士英语会话:内科 护士:早上好~ Nurse: Good morning. 病人:你好~ Patient: Good morning. 护士:请问哪里不舒服, Nurse: What seems to be the problem, 病人:高烧,感觉糟透了。 Patient: Im running a high fever and feeling terribly bad. 护士:这种情况出现有多久了, Nurse: How long have you had the proble...
医生护士英语会话
医生护士英语会话 医生护士英语会话:内科 护士:早上好~ Nurse: Good morning. 病人:你好~ Patient: Good morning. 护士:请问哪里不舒服, Nurse: What seems to be the problem, 病人:高烧,感觉糟透了。 Patient: Im running a high fever and feeling terribly bad. 护士:这种情况出现有多久了, Nurse: How long have you had the problem, 病人:从昨晚开始的。 Patient: Since last night. 护士:您以前来过咱们医院吗, Nurse: Well, have you ever been here before, to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head 病人:事实上,我也是刚刚到这个城市。 Patient: As a matter of fact, I have just moved to this city. 护士:好的,那么您得先填写这张挂号。比如您的年龄,挂号, 住址等等。 Nurse: O. K. In that case, you have to fill in this registration card. Your age, gender, address and things like that. 病人:每问题。请问我应该挂哪科, Patient: No problem. Which department should I register with, madam, 护士:您最好挂内科。 Nurse: You'd better go to the medical department. 病人:表填好,给你。 to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head Patient: Here is my registration card. 护士:谢谢。挂号费是一美圆。 Nurse: Thank you. The registration fee is one dollar., 病人:好的。请问我该怎么走, Patient: Fine. But can you tell me how to get to the medical department, please, 护士:坐电梯到三楼,左拐。沿着走道走。您会看到一块牌子在 您的右手边。 Nurse: Take the lift to the third floor and then make a left turn. Go along the corridor until you see the sign on your right. 病人:多谢了。 Patient: Thanks a lot. to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head 护士:不客气。 Nurse: You're welcome. 单词 Words registration n. 挂号 gender n.性别 address n. 住址 department n. 科,系,部门 register vi挂号 fee n. 费 lift n. 电梯 corridor n. 走道 to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head 短语 Phrases run a high fever 发高烧 as a matter of fact 事实上 in that case 如果那样 fill in 填写 and things like that 等等 register with 挂(某科)的号 had better 最好 take a lift坐电梯 make a left turn 向左拐 句子 Sentence Patterns to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head What seems to be the problem, 请问哪里不舒服, How long have you had the problem, 这种情况出现有多久了, In that case, you have to fill in this registration card. Your age, gender, address and things like that.那么您得先 填写这张挂号表。比如您的年龄,性别,住址等等。 Which department should I register with, madam, 请问我应该挂哪科, You'd better go to the medical department.您最好挂内科。 Take the lift to the third floor and then make a left turn. Go along the corridor until you see the sign on your right.坐电梯到三楼,左拐。沿着走道走。您会看到一块牌子在您的右手边。 to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head 相关单词 (人体部位)Related Words blood vessel 血管 vein 静脉 artery 动脉 capillary 毛细血管 nerve 神经 spinal marrow 脊髓 lung 肺 heart 心 diaphragm 隔膜 internal organs 内脏 to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head stomach 胃 liver 肝脏 gallbladder 胆囊 pancreas 胰 spleen 脾 duodenum 十二指肠 small intestine 小肠 large intestine 大肠 caecum 盲肠 vermiform appendix 阑尾 rectum 直肠 to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head anus 肛门 kidney 肾脏 bladder 膀胱 penis * testicle 睾丸 scrotum 阴囊 urethra 尿道 ovary 卵巢 womb 子宫 vagina * 相关短语Related Phrase to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head take someicine 服药 feel sick 感到恶心 feel short of breath 觉得气急 have noppetite 没有胃口 have difficulty in breathing 呼吸困难 chronic disease 慢性病 suffer from an allergy 过敏 hear of 听说 相关表达方式(询问病情)Related Expressions (asking the patient about his/her illness ) What seems to be the trouble, 你怎么啦, to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head What seems to be the problem, 你怎么啦, What's troubling you, 你哪里不舒服, Wher does it hurt, 你哪里不舒服, In what way are you feeing sick, 你哪里不舒服, What seems to be bothering you, 你哪里不舒服, Tell me what your problem is, to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head 你哪里不舒服, When did the pain start, 你什么时候开始痛的, Which tooth is troubling you, 你哪颗牙不好, What hurts you, 你哪里不舒服, What's wrong with your ear, 你的耳朵怎么了, Since when have you been feeling like that, 什么时候开始有这种感觉的, to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head How long have you had this trouble, 你得这病有多久了, How long has it been this way, 这样多久了, What did you eat yesterday, 你昨天吃了什么东西, Have you take any medicine for it, 你吃过什么药吗, Do you feel tired, 你感觉疲倦吗, Are you feeling sick, to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head 你感到恶心吗, Any vomitting, 有没有呕吐, Are you feeling all right, 你感觉好吗, Are your bowels regular, 你的大便正常吗, Do you cough, 你咳嗽吗, Do you feel short of breath sometimes, 你有时觉得气急吗, to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head Do you have any appetite, 你吃东西有胃口吗, Do you have any difficulty breathing, 你呼吸有困难吗, Does it hurt, 你通不痛, Did you have any pains here before, 你以前这儿痛过吗, Have you ever had this experience before, 你以前有过这种情况吗, Have you had any chronic diseases in the past, to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head 你过去有没有得过慢性病, Have you ever heard of any chronic diseases whin your family, 你以前听没听说过你家里人有谁得过慢性病, How is your sleep, 你睡眠怎样, Is this cut still painful, 伤口还疼吗, Did you suffer from an allergy, 你有过敏史吗, to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
/
本文档为【医生护士英语会话】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索