胃痛胃胀的穴位治疗
1胃痛胃胀常按三个神奇穴位止痛 照海穴——告别咽痛和失眠的强肾降火妙穴 申脉穴——体贴身寒多病者的纯阳大药 内关穴——打开心结,养颜养心的美丽穴 外关穴——瞬间恢复听力的“聪耳神穴” 列缺穴——专治落枕、偏头痛的随身医师 后溪穴——统治一切颈肩腰椎病的奇效大穴 公孙穴——摆平痛经和脾胃疾患的第一温阳大穴 临泣穴——一生守护身体少阳之气的“小柴胡汤
补肺益肾的列缺穴 散热去痛的尺泽穴
temperature piping and equipment, avoid oil pipeline, avoiding vibration equipment, principles of construction of beautiful and neat easy to install. 5.1.5.2 from field instrumentation and valves field junction boxes to the single line slot cable using pipe, 220VAC power cord shall be full pipe laying, indoor coaxial cables concealed and outdoor wear buried. 5.1.5.3 bending cold bending method should be used to protect pipe, bending angle should not be less than 900, when wearing non-armoured cable and laid, bend radius should not be less than 6 times the pipe diameter, when while wearing armored cable and concealed, bend radius should not be less than 10 times the pipe diameter. Bend protection tube there should be no dents, cracks, single right-angled bend protection tube should not be more than two. 5.1.5.4 between protective tube and between protective tube and connector, threaded connections should be used, it tube end screw thread length should not be less than 1/2 of the fitting, and ensures the electrical connection. 5.1.5.5 protection tube should line up, ... 5.1.7 5.1.7.1 check tubing for pressure piping laying pipe, components, materials and specifications meet the design requirements, and have quality certificates, before laying should be cleared by welding and bending the welding slag, rust, chip or a foreign body, and preservative treatments. 5.1.7.2 in pressure piping welding welder must have a valid welder certificate. 5.1.7.3 tubing under the conditions to meet measurement requirements should be as short as possible, General length should not be more than 15m, pipe bending cold bending, cutting machine, minimizing bending and cross, and there shall be no sharp and complex bending, bending radius of not less than 3 times the pipe diameter. 5.1.7.4 pipe and process equipment, piping, or building surface distance is greater than 50mm, not be laid parallel to the oil, combustible, explosive
temperature piping and equipment, avoid oil pipeline, avoiding vibration equipment, principles of construction of beautiful and neat easy to install. 5.1.5.2 from field instrumentation and valves field junction boxes to the single line slot cable using pipe, 220VAC power cord shall be full pipe laying, indoor coaxial cables concealed and outdoor wear buried. 5.1.5.3 bending cold bending method should be used to protect pipe, bending angle should not be less than 900, when wearing non-armoured cable and laid, bend radius should not be less than 6 times the pipe diameter, when while wearing armored cable and concealed, bend radius should not be less than 10 times the pipe diameter. Bend protection tube there should be no dents, cracks, single right-angled bend protection tube should not be more than two. 5.1.5.4 between protective tube and between protective tube and connector, threaded connections should be used, it tube end screw thread length should not be less than 1/2 of the fitting, and ensures the electrical connection. 5.1.5.5 protection tube should line up, ... 5.1.7 5.1.7.1 check tubing for pressure piping laying pipe, components, materials and specifications meet the design requirements, and have quality certificates, before laying should be cleared by welding and bending the welding slag, rust, chip or a foreign body, and preservative treatments. 5.1.7.2 in pressure piping welding welder must have a valid welder certificate. 5.1.7.3 tubing under the conditions to meet measurement requirements should be as short as possible, General length should not be more than 15m, pipe bending cold bending, cutting machine, minimizing bending and cross, and there shall be no sharp and complex bending, bending radius of not less than 3 times the pipe diameter. 5.1.7.4 pipe and process equipment, piping, or building surface distance is greater than 50mm, not be laid parallel to the oil, combustible, explosive
temperature piping and equipment, avoid oil pipeline, avoiding vibration equipment, principles of construction of beautiful and3/7 neat easy to install. 5.1.5.2 from field instrumentation and valves field junction boxes to the single line slot cable using pipe, 220VAC power cord shall be full pipe laying, indoor coaxial cables concealed and outdoor wear buried. 5.1.5.3 bending cold bending method should be used to protect pipe, bending angle should not be less than 900, when wearing non-armoured cable and laid, bend radius should not be less than 6 times the pipe diameter, when while wearing armored cable and concealed, bend radius should not be less than 10 times the pipe diameter. Bend protection tube there should be no dents, cracks, single right-angled bend protection tube should not be more than two. 5.1.5.4 between protective tube and between protective tube and connector, threaded connections should be used, it tube end screw thread length should not be less than 1/2 of the fitting, and ensures the electrical connection. 5.1.5.5 protection tube should line up, ... 5.1.7 5.1.7.1 check tubing for pressure piping laying pipe, components, materials and specifications meet the design requirements, and have quality certificates, before laying should be cleared by welding and bending the welding slag, rust, chip or a foreign body, and preservative treatments. 5.1.7.2 in pressure piping welding welder must have a valid welder certificate. 5.1.7.3 tubing under the conditions to meet measurement requirements should be as short as possible, General length should not be more than 15m, pipe bending cold bending, cutting machine, minimizing bending and cross, and there shall be no sharp and complex bending, bending radius of not less than 3 times the pipe diameter. 5.1.7.4 pipe and process equipment, piping, or building surface distance is greater than 50mm, not be laid parallel to the oil, combustible, explosive
胃痛胃胀常按三个神奇穴位止痛
(2014-01-22 01:07:20)
temperature piping and equipment, avoid oil pipeline, avoiding vibration equipment, principles of construction of beautiful and neat easy to install. 5.1.5.2 from field instrumentation and valves field junction boxes to the single line slot cable using pipe, 220VAC power cord shall be full pipe laying, indoor coaxial cables concealed and outdoor wear buried. 5.1.5.3 bending cold bending method should be used to protect pipe, bending angle should not be less than 900, when wearing non-armoured cable and laid, bend radius should not be less than 6 times the pipe diameter, when while wearing armored cable and concealed, bend radius should not be less than 10 times the pipe diameter. Bend protection tube there should be no dents, cracks, single right-angled bend protection tube should not be more than two. 5.1.5.4 between protective tube and between protective tube and connector, threaded connections should be used, it tube end screw thread length should not be less than 1/2 of the fitting, and ensures the electrical connection. 5.1.5.5 protection tube should line up, ... 5.1.7 5.1.7.1 check tubing for pressure piping laying pipe, components, materials and specifications meet the design requirements, and have quality certificates, before laying should be cleared by welding and bending the welding slag, rust, chip or a foreign body, and preservative treatments. 5.1.7.2 in pressure piping welding welder must have a valid welder certificate. 5.1.7.3 tubing under the conditions to meet measurement requirements should be as short as possible, General length should not be more than 15m, pipe bending cold bending, cutting machine, minimizing bending and cross, and there shall be no sharp and complex bending, bending radius of not less than 3 times the pipe diameter. 5.1.7.4 pipe and process equipment, piping, or building surface distance is greater than 50mm, not be laid parallel to the oil, combustible, explosive
转载?
原文 :
胃痛胃胀常按三个神奇穴位止痛
气血虚或消化不良的人,稍吃多一点就会引起肠胃胀痛。中医认为,通过穴位按摩,可起到调整胃的机能、镇痛、降逆气化浊气的养生功效,进而缓解胃痛胃胀等不适症状。下面我们一起来看看按摩哪些养生穴位,可快速缓解胃长胃痛症状。
仰掌,手腕往手肘的方向约三横指(约2寸)的距离处,在中间二骨两筋之间。胃胀或者有吃东西好像梗在胸口下不到胃部去的感觉,按一按此穴,气机调畅就通了。
temperature piping and equipment, avoid oil pipeline, avoiding vibration equipment, principles of construction of beautiful and5/7 neat easy to install. 5.1.5.2 from field instrumentation and valves field junction boxes to the single line slot cable using pipe, 220VAC power cord shall be full pipe laying, indoor coaxial cables concealed and outdoor wear buried. 5.1.5.3 bending cold bending method should be used to protect pipe, bending angle should not be less than 900, when wearing non-armoured cable and laid, bend radius should not be less than 6 times the pipe diameter, when while wearing armored cable and concealed, bend radius should not be less than 10 times the pipe diameter. Bend protection tube there should be no dents, cracks, single right-angled bend protection tube should not be more than two. 5.1.5.4 between protective tube and between protective tube and connector, threaded connections should be used, it tube end screw thread length should not be less than 1/2 of the fitting, and ensures the electrical connection. 5.1.5.5 protection tube should line up, ... 5.1.7 5.1.7.1 check tubing for pressure piping laying pipe, components, materials and specifications meet the design requirements, and have quality certificates, before laying should be cleared by welding and bending the welding slag, rust, chip or a foreign body, and preservative treatments. 5.1.7.2 in pressure piping welding welder must have a valid welder certificate. 5.1.7.3 tubing under the conditions to meet measurement requirements should be as short as possible, General length should not be more than 15m, pipe bending cold bending, cutting machine, minimizing bending and cross, and there shall be no sharp and complex bending, bending radius of not less than 3 times the pipe diameter. 5.1.7.4 pipe and process equipment, piping, or building surface distance is greater than 50mm, not be laid parallel to the oil, combustible, explosive
位于肚脐上正中线4寸,约五横指处。对各种胃痛、食道逆流、打嗝、穿露脐装着
凉引起的胃痛以及胃气冲心而感到的胸闷等,治疗效果都非常好。
在膝盖下外侧,约四横指(约3寸)的小腿胫骨外侧有一凹沟处,这是强壮穴,力度
按大一点,酸麻的经络传感可到脚背。按摩本穴可治一切肠胃消化系统疾病,包括
消化不良、胃胀胃痛。
temperature piping and equipment, avoid oil pipeline, avoiding vibration equipment, principles of construction of beautiful and neat easy to install. 5.1.5.2 from field instrumentation and valves field junction boxes to the single line slot cable using pipe, 220VAC power cord shall be full pipe laying, indoor coaxial cables concealed and outdoor wear buried. 5.1.5.3 bending cold bending method should be used to protect pipe, bending angle should not be less than 900, when wearing non-armoured cable and laid, bend radius should not be less than 6 times the pipe diameter, when while wearing armored cable and concealed, bend radius should not be less than 10 times the pipe diameter. Bend protection tube there should be no dents, cracks, single right-angled bend protection tube should not be more than two. 5.1.5.4 between protective tube and between protective tube and connector, threaded connections should be used, it tube end screw thread length should not be less than 1/2 of the fitting, and ensures the electrical connection. 5.1.5.5 protection tube should line up, ... 5.1.7 5.1.7.1 check tubing for pressure piping laying pipe, components, materials and specifications meet the design requirements, and have quality certificates, before laying should be cleared by welding and bending the welding slag, rust, chip or a foreign body, and preservative treatments. 5.1.7.2 in pressure piping welding welder must have a valid welder certificate. 5.1.7.3 tubing under the conditions to meet measurement requirements should be as short as possible, General length should not be more than 15m, pipe bending cold bending, cutting machine, minimizing bending and cross, and there shall be no sharp and complex bending, bending radius of not less than 3 times the pipe diameter. 5.1.7.4 pipe and process equipment, piping, or building surface distance is greater than 50mm, not be laid parallel to the oil, combustible, explosive
temperature piping and equipment, avoid oil pipeline, avoiding vibration equipment, principles of construction of beautiful and7/7 neat easy to install. 5.1.5.2 from field instrumentation and valves field junction boxes to the single line slot cable using pipe, 220VAC power cord shall be full pipe laying, indoor coaxial cables concealed and outdoor wear buried. 5.1.5.3 bending cold bending method should be used to protect pipe, bending angle should not be less than 900, when wearing non-armoured cable and laid, bend radius should not be less than 6 times the pipe diameter, when while wearing armored cable and concealed, bend radius should not be less than 10 times the pipe diameter. Bend protection tube there should be no dents, cracks, single right-angled bend protection tube should not be more than two. 5.1.5.4 between protective tube and between protective tube and connector, threaded connections should be used, it tube end screw thread length should not be less than 1/2 of the fitting, and ensures the electrical connection. 5.1.5.5 protection tube should line up, ... 5.1.7 5.1.7.1 check tubing for pressure piping laying pipe, components, materials and specifications meet the design requirements, and have quality certificates, before laying should be cleared by welding and bending the welding slag, rust, chip or a foreign body, and preservative treatments. 5.1.7.2 in pressure piping welding welder must have a valid welder certificate. 5.1.7.3 tubing under the conditions to meet measurement requirements should be as short as possible, General length should not be more than 15m, pipe bending cold bending, cutting machine, minimizing bending and cross, and there shall be no sharp and complex bending, bending radius of not less than 3 times the pipe diameter. 5.1.7.4 pipe and process equipment, piping, or building surface distance is greater than 50mm, not be laid parallel to the oil, combustible, explosive