解决Win7 USBDVD Download Tool无法写入U盘
解决Win7 USB/DVD Download Tool无法写入U盘
在使用Windows 7 USB DVD Download Tool制作Windows7 U盘启动盘的时候,当第四步有可能会出现如下图所示的错误,这可能是由于不同品牌的U盘出厂时磁盘分区和格式化方式不同而引起的兼容性问题。解决
如下。
解决方案
.
1
.
shall not exceed the level of stator core, or arc skateboards, protection of stator plate rollover may occur), reasonable to generally should be centralized. Avoid layout vulnerable to mechanical damage, damp, vulnerable to corrosion and vibration, ensure as far as possible with the platform stairs, lifting devices, cover plates, electrical enclosures and other intervals at arm's length. Piping support and hanger set weight of the weight and its insulation shall meet reasonable piping displacement, increase system stability, prevention of pipeline vibration displacement in operation. Process piping support and hanger spacing are shown in table 1. Process piping in the drain pipe must have a certain slope (about 0.002-0.004) to drain. Enter the pipe should be smooth flow to the lateral, intake manifold into the expansion tank should be considered order, low pressure or high pressure drop near the expansion tank inlet. Pipe deflection and expansion must be considered the absorption problem, consider the natural direction of the pipeline using the small pipe to achieve thermal expansion compensation and, if necessary, consider
WIN键+R 启动出“运行”对话框,键入cmd,启动命令提示符。输入
diskpart,启动DISKPART工具。
.
.
.
shall not exceed the level of stator core, or arc skateboards, protection of stator plate rollover may occur), reasonable to generally should be centralized. Avoid layout vulnerable to mechanical damage, damp, vulnerable to corrosion and vibration, ensure as far as possible with the platform stairs, lifting devices, cover plates, electrical enclosures and other intervals at arm's length. Piping support and hanger set weight of the weight and its insulation shall meet reasonable piping displacement, increase system stability, prevention of pipeline vibration displacement in operation. Process piping support and hanger spacing are shown in table 1. Process piping in the drain pipe must have a certain slope (about 0.002-0.004) to drain. Enter the pipe should be smooth flow to the lateral, intake manifold into the expansion tank should be considered order, low pressure or high pressure drop near the expansion tank inlet. Pipe deflection and expansion must be considered the absorption problem, consider the natural direction of the pipeline using the small pipe to achieve thermal expansion compensation and, if necessary, consider
.
.
2
.
在DISKPART窗口中输入以下命令:
.
>list disk (此命令是列出所有磁盘驱动器,请务必看清楚你的U盘前面
的数字编号,例如1)
>select disk # (#是上一步中所显示的U盘编号数字,不要写成硬盘编号)
>clean
.
.
shall not exceed the level of stator core, or arc skateboards, protection of stator plate rollover may occur), reasonable to generally should be centralized. Avoid layout vulnerable to mechanical damage, damp, vulnerable to corrosion and vibration, ensure as far as possible with the platform stairs, lifting devices, cover plates, electrical enclosures and other intervals at arm's length. Piping support and hanger set weight of the weight and its insulation shall meet reasonable piping displacement, increase system stability, prevention of pipeline vibration displacement in operation. Process piping support and hanger spacing are shown in table 1. Process piping in the drain pipe must have a certain slope (about 0.002-0.004) to drain. Enter the pipe should be smooth flow to the lateral, intake manifold into the expansion tank should be considered order, low pressure or high pressure drop near the expansion tank inlet. Pipe deflection and expansion must be considered the absorption problem, consider the natural direction of the pipeline using the small pipe to achieve thermal expansion compensation and, if necessary, consider
.
.
.
3
shall not exceed the level of stator core, or arc skateboards, protection of stator plate rollover may occur), reasonable to generally should be centralized. Avoid layout vulnerable to mechanical damage, damp, vulnerable to corrosion and vibration, ensure as far as possible with the platform stairs, lifting devices, cover plates, electrical enclosures and other intervals at arm's length. Piping support and hanger set weight of the weight and its insulation shall meet reasonable piping displacement, increase system stability, prevention of pipeline vibration displacement in operation. Process piping support and hanger spacing are shown in table 1. Process piping in the drain pipe must have a certain slope (about 0.002-0.004) to drain. Enter the pipe should be smooth flow to the lateral, intake manifold into the expansion tank should be considered order, low pressure or high pressure drop near the expansion tank inlet. Pipe deflection and expansion must be considered the absorption problem, consider the natural direction of the pipeline using the small pipe to achieve thermal expansion compensation and, if necessary, consider
.
开始给U盘创建主分区,进入并激活主分区: .
>create partition primary
>select partition 1
>active
.
.
shall not exceed the level of stator core, or arc skateboards, protection of stator plate rollover may occur), reasonable to generally should be centralized. Avoid layout vulnerable to mechanical damage, damp, vulnerable to corrosion and vibration, ensure as far as possible with the platform stairs, lifting devices, cover plates, electrical enclosures and other intervals at arm's length. Piping support and hanger set weight of the weight and its insulation shall meet reasonable piping displacement, increase system stability, prevention of pipeline vibration displacement in operation. Process piping support and hanger spacing are shown in table 1. Process piping in the drain pipe must have a certain slope (about 0.002-0.004) to drain. Enter the pipe should be smooth flow to the lateral, intake manifold into the expansion tank should be considered order, low pressure or high pressure drop near the expansion tank inlet. Pipe deflection and expansion must be considered the absorption problem, consider the natural direction of the pipeline using the small pipe to achieve thermal expansion compensation and, if necessary, consider
.
.
.
4
shall not exceed the level of stator core, or arc skateboards, protection of stator plate rollover may occur), reasonable to generally should be centralized. Avoid layout vulnerable to mechanical damage, damp, vulnerable to corrosion and vibration, ensure as far as possible with the platform stairs, lifting devices, cover plates, electrical enclosures and other intervals at arm's length. Piping support and hanger set weight of the weight and its insulation shall meet reasonable piping displacement, increase system stability, prevention of pipeline vibration displacement in operation. Process piping support and hanger spacing are shown in table 1. Process piping in the drain pipe must have a certain slope (about 0.002-0.004) to drain. Enter the pipe should be smooth flow to the lateral, intake manifold into the expansion tank should be considered order, low pressure or high pressure drop near the expansion tank inlet. Pipe deflection and expansion must be considered the absorption problem, consider the natural direction of the pipeline using the small pipe to achieve thermal expansion compensation and, if necessary, consider
.
快速初始化U盘为FAT32格式,并重新加载U盘,然后退出DISKPART;
.
.
shall not exceed the level of stator core, or arc skateboards, protection of stator plate rollover may occur), reasonable to generally should be centralized. Avoid layout vulnerable to mechanical damage, damp, vulnerable to corrosion and vibration, ensure as far as possible with the platform stairs, lifting devices, cover plates, electrical enclosures and other intervals at arm's length. Piping support and hanger set weight of the weight and its insulation shall meet reasonable piping displacement, increase system stability, prevention of pipeline vibration displacement in operation. Process piping support and hanger spacing are shown in table 1. Process piping in the drain pipe must have a certain slope (about 0.002-0.004) to drain. Enter the pipe should be smooth flow to the lateral, intake manifold into the expansion tank should be considered order, low pressure or high pressure drop near the expansion tank inlet. Pipe deflection and expansion must be considered the absorption problem, consider the natural direction of the pipeline using the small pipe to achieve thermal expansion compensation and, if necessary, consider
.
.
.
5
.
最后,重新使用Windows 7 USB DVD Download Tool即可。 .
E
shall not exceed the level of stator core, or arc skateboards, protection of stator plate rollover may occur), reasonable to generally should be centralized. Avoid layout vulnerable to mechanical damage, damp, vulnerable to corrosion and vibration, ensure as far as possible with the platform stairs, lifting devices, cover plates, electrical enclosures and other intervals at arm's length. Piping support and hanger set weight of the weight and its insulation shall meet reasonable piping displacement, increase system stability, prevention of pipeline vibration displacement in operation. Process piping support and hanger spacing are shown in table 1. Process piping in the drain pipe must have a certain slope (about 0.002-0.004) to drain. Enter the pipe should be smooth flow to the lateral, intake manifold into the expansion tank should be considered order, low pressure or high pressure drop near the expansion tank inlet. Pipe deflection and expansion must be considered the absorption problem, consider the natural direction of the pipeline using the small pipe to achieve thermal expansion compensation and, if necessary, consider