DIY手机耳机内部线路图
目前手上有一种索爱手机的专用转接线:
如果您也需要这个材料可以看看以下链接:
;
将头剪去:
经过测量发现,从左至右依次为 L、Mic+、R、Mic-、Gnd
65m, in the middle of 25th standard section, the fourth way is 80m, in the middle of 32nd standard section. The fifth is 98m, in the middle of 39th standard section. (D) the crane operation control to ensure the duration of tower crane during use must be strictly controlled. In the course of construction, 24 hours, tower crane operations, be coordinated by hand signal, and crane drivers to strictly obey the unified command. Layout of tower crane Foundation, main floor plan. Four, finished construction of cushion in Foundation pile construction, excavation of trench experience after the charge meets the requirements, you can begin construction of cushion, cushion for 300 mm thick and 2:8 lime-soil compaction. Tamping is not greater than 0.9, to meet the design requirements of C15 concrete pad before the construction, and the workers were good technical disclosure, request vibrators for concrete surfaces immediately after tamping with wooden pattern molded flat covering plastic sheeting, in front of a concrete final setting with a pressure of iron, covered with pressure as requested. Brick mould construction followed. Five underground waterproof Engineering (a) flexible waterproof layer on waterproofing of underground construction, we must strengthen the construction quality control of detail. Focus on checking before construction of deep Foundation pit precipitation in parts of the case, preventing groundwater waterproofing layer up. Floor, basement waterproofing for 1.5 mm PET polymer modified bitumen self-adhesive flexible waterproof material. In the course of construction,
清理干净3.5 4级耳机插头,按照自己需要的线序焊接好:
打上热熔胶:
套上热缩管,用打火机烤烤(一般用5-8mm的热缩管,需要的话仟佰汇也有,一同拍下很
划算):
一条有麦克风,有接听功能的iPhone耳机转接线就DIY改造完毕,对于有一定DIY能力的
朋友来说还是比较简单的。
整体外观:
65m, in the middle of 25th standard section, the fourth way is 80m, in the middle of 32nd standard section. The fifth is 98m, in the middle of 39th standard section. (D) the crane operation control to ensure the duration of tower crane during use must be strictly controlled. In the course of construction, 24 hours, tower crane operations, be coordinated by hand signal, and crane drivers to strictly obey the unified command. Layout of tower crane Foundation, main floor plan. Four, finished construction of cushion in Foundation pile construction, excavation of trench experience after the charge meets the requirements, you can begin construction of cushion, cushion for 300 mm thick and 2:8 lime-soil compaction. Tamping is not greater than 0.9, to meet the design requirements of C15 concrete pad before the construction, and the workers were good technical disclosure, request vibrators for concrete surfaces immediately after tamping with wooden pattern molded flat covering plastic sheeting, in front of a concrete final setting with a pressure of iron, covered with pressure as requested. Brick mould construction followed. Five underground waterproof Engineering (a) flexible waterproof layer on waterproofing of underground construction, we must strengthen the construction quality control of detail. Focus on checking before construction of deep Foundation pit precipitation in parts of the case, preventing groundwater waterproofing layer up. Floor, basement waterproofing for 1.5 mm PET polymer modified bitumen self-adhesive flexible waterproof material. In the course of construction,