国家邮政局:春节假期快递不冷同城增长最快
国家邮政局:春节假期快递不冷同城增长最快
央广网北京2月20日消息(记者庄胜春)国家邮政局今天(20日)公布2014年1月份邮政行业运行情况。邮政企业和全国快递服务企业业务收入(不包括邮政储蓄银行直接营业收入)完成254.2亿元,同比增长18.7%;业务总量完成259.2亿元,同比增长23.3%。受春节假期因素影响,邮政行业1月同比增速有所放缓,但仍保持较高水平。
具体数据显示,全国快递服务企业业务量完成8.9亿件,同比增长29.1%;业务收入完成146.2亿元,同比增长28.3%。其中,同城业务收入增长最快,完成16.9亿元,同比增长38.3%;异地业务收入完成82.2亿元,同比增长22%;国际及港澳台业务收入完成25.3亿元,同比增长15%。
(原标
:国家邮政局:春节假期快递不冷 同城增长最快)
replacing the sealing plate and bolt screw down, check the water surface and supports the slider surface in height meets the requirements, to ensure that the amount of compression. 8.2.5 installation of hydraulic headstock gear hinge installation: first cylinder hinge seat base weld chipboard, hinges in place, release height measurement by total station and the Center, horizontal control points. Good point, concentricity control hinge and hinge seat elevation. Fuel tank installation: when the hinged seat second stage concrete strength to meet the design requirements, fuel tank installation. Cylinder before installation, clean line on the cylinder and cylinder connection and reinforcement. Cylinder and hinged connections, welding a temporary support the fuel tank is fixed, so that later no load test. Hydraulic installation: after the formation of headstock gear room, equipment will be provided according to the design drawings of hydraulic station channel, expansion bolts. 8.2.6 hoist to install one-way door installation: cart traveling mechanism in place, running gear and bottom beam positioning position the connection of the factory is completed, 50 ton crawler crane to hoist them in orbit, adjust levels, span and diagonal, finished, reinforced. Legs installed: legs and beams composed of h-shaped, adjust the legs after opening size consistent with the bottom end rail bolt hole distance, tight bolts with 50T crane hoisting. Adjust vertical degrees, fixed with chain and wire rope. Machine installation: two legs after the installation process is completed and fully fixed, for machine installation. Selected chicken farms should
replacing the sealing plate and bolt screw down, check the water surface and supports the slider surface in height meets the requirements, to ensure that the amount of compression. 8.2.5 installation of hydraulic headstock gear hinge installation: first cylinder hinge seat base weld chipboard, hinges in place, release height measurement by total station and the Center, horizontal control points. Good point, concentricity control hinge and hinge seat elevation. Fuel tank installation: when the hinged seat second stage concrete strength to meet the design requirements, fuel tank installation. Cylinder before installation, clean line on the cylinder and cylinder connection and reinforcement. Cylinder and hinged connections, welding a temporary support the fuel tank is fixed, so that later no load test. Hydraulic installation: after the formation of headstock gear room, equipment will be provided according to the design drawings of hydraulic station channel, expansion bolts. 8.2.6 hoist to install one-way door installation: cart traveling mechanism in place, running gear and bottom beam positioning position the connection of the factory is completed, 50 ton crawler crane to hoist them in orbit, adjust levels, span and diagonal, finished, reinforced. Legs installed: legs and beams composed of h-shaped, adjust the legs after opening size consistent with the bottom end rail bolt hole distance, tight bolts with 50T crane hoisting. Adjust vertical degrees, fixed with chain and wire rope. Machine installation: two legs after the installation process is completed and fully fixed, for machine installation. Selected chicken farms should
replacing the sealing plate and bolt screw down, check the water surface and supports the slider surface in height meets the requirements, to ensure that the amount of compression. 8.2.5 installation of hydraulic headstock gear hinge installation: first cylinder hinge seat base weld chipboard, hinges in place, release height measurement by total station and the Center, horizontal control points. Good point, concentricity control hinge and hinge seat elevation. Fuel tank installation: when the hinged seat second stage concrete strength to meet the design requirements, fuel tank installation. Cylinder before installation, clean line on the cylinder and cylinder connection and reinforcement. Cylinder and hinged connections, welding a temporary support the fuel tank is fixed, so that later no load test. Hydraulic installation: after the formation of headstock gear room, equipment will be provided according to the design drawings of hydraulic station channel, expansion bolts. 8.2.6 hoist to install one-way door installation: cart traveling mechanism in place, running gear and bottom beam positioning position the connection of the factory is completed, 50 ton crawler crane to hoist them in orbit, adjust levels, span and diagonal, finished, reinforced. Legs installed: legs and beams composed of h-shaped, adjust the legs after opening size consistent with the bottom end rail bolt hole distance, tight bolts with 50T crane hoisting. Adjust vertical degrees, fixed with chain and wire rope. Machine installation: two legs after the installation process is completed and fully fixed, for machine installation. Selected chicken farms should
replacing the sealing plate and bolt screw down, check the water surface and supports the slider surface in height meets the requirements, to ensure that the amount of compression. 8.2.5 installation of hydraulic headstock gear hinge installation: first cylinder hinge seat base weld chipboard, hinges in place, release height measurement by total station and the Center, horizontal control points. Good point, concentricity control hinge and hinge seat elevation. Fuel tank installation: when the hinged seat second stage concrete strength to meet the design requirements, fuel tank installation. Cylinder before installation, clean line on the cylinder and cylinder connection and reinforcement. Cylinder and hinged connections, welding a temporary support the fuel tank is fixed, so that later no load test. Hydraulic installation: after the formation of headstock gear room, equipment will be provided according to the design drawings of hydraulic station channel, expansion bolts. 8.2.6 hoist to install one-way door installation: cart traveling mechanism in place, running gear and bottom beam positioning position the connection of the factory is completed, 50 ton crawler crane to hoist them in orbit, adjust levels, span and diagonal, finished, reinforced. Legs installed: legs and beams composed of h-shaped, adjust the legs after opening size consistent with the bottom end rail bolt hole distance, tight bolts with 50T crane hoisting. Adjust vertical degrees, fixed with chain and wire rope. Machine installation: two legs after the installation process is completed and fully fixed, for machine installation. Selected chicken farms should
replacing the sealing plate and bolt screw down, check the water surface and supports the slider surface in height meets the requirements, to ensure that the amount of compression. 8.2.5 installation of hydraulic headstock gear hinge installation: first cylinder hinge seat base weld chipboard, hinges in place, release height measurement by total station and the Center, horizontal control points. Good point, concentricity control hinge and hinge seat elevation. Fuel tank installation: when the hinged seat second stage concrete strength to meet the design requirements, fuel tank installation. Cylinder before installation, clean line on the cylinder and cylinder connection and reinforcement. Cylinder and hinged connections, welding a temporary support the fuel tank is fixed, so that later no load test. Hydraulic installation: after the formation of headstock gear room, equipment will be provided according to the design drawings of hydraulic station channel, expansion bolts. 8.2.6 hoist to install one-way door installation: cart traveling mechanism in place, running gear and bottom beam positioning position the connection of the factory is completed, 50 ton crawler crane to hoist them in orbit, adjust levels, span and diagonal, finished, reinforced. Legs installed: legs and beams composed of h-shaped, adjust the legs after opening size consistent with the bottom end rail bolt hole distance, tight bolts with 50T crane hoisting. Adjust vertical degrees, fixed with chain and wire rope. Machine installation: two legs after the installation process is completed and fully fixed, for machine installation. Selected chicken farms should
replacing the sealing plate and bolt screw down, check the water surface and supports the slider surface in height meets the requirements, to ensure that the amount of compression. 8.2.5 installation of hydraulic headstock gear hinge installation: first cylinder hinge seat base weld chipboard, hinges in place, release height measurement by total station and the Center, horizontal control points. Good point, concentricity control hinge and hinge seat elevation. Fuel tank installation: when the hinged seat second stage concrete strength to meet the design requirements, fuel tank installation. Cylinder before installation, clean line on the cylinder and cylinder connection and reinforcement. Cylinder and hinged connections, welding a temporary support the fuel tank is fixed, so that later no load test. Hydraulic installation: after the formation of headstock gear room, equipment will be provided according to the design drawings of hydraulic station channel, expansion bolts. 8.2.6 hoist to install one-way door installation: cart traveling mechanism in place, running gear and bottom beam positioning position the connection of the factory is completed, 50 ton crawler crane to hoist them in orbit, adjust levels, span and diagonal, finished, reinforced. Legs installed: legs and beams composed of h-shaped, adjust the legs after opening size consistent with the bottom end rail bolt hole distance, tight bolts with 50T crane hoisting. Adjust vertical degrees, fixed with chain and wire rope. Machine installation: two legs after the installation process is completed and fully fixed, for machine installation. Selected chicken farms should
replacing the sealing plate and bolt screw down, check the water surface and supports the slider surface in height meets the requirements, to ensure that the amount of compression. 8.2.5 installation of hydraulic headstock gear hinge installation: first cylinder hinge seat base weld chipboard, hinges in place, release height measurement by total station and the Center, horizontal control points. Good point, concentricity control hinge and hinge seat elevation. Fuel tank installation: when the hinged seat second stage concrete strength to meet the design requirements, fuel tank installation. Cylinder before installation, clean line on the cylinder and cylinder connection and reinforcement. Cylinder and hinged connections, welding a temporary support the fuel tank is fixed, so that later no load test. Hydraulic installation: after the formation of headstock gear room, equipment will be provided according to the design drawings of hydraulic station channel, expansion bolts. 8.2.6 hoist to install one-way door installation: cart traveling mechanism in place, running gear and bottom beam positioning position the connection of the factory is completed, 50 ton crawler crane to hoist them in orbit, adjust levels, span and diagonal, finished, reinforced. Legs installed: legs and beams composed of h-shaped, adjust the legs after opening size consistent with the bottom end rail bolt hole distance, tight bolts with 50T crane hoisting. Adjust vertical degrees, fixed with chain and wire rope. Machine installation: two legs after the installation process is completed and fully fixed, for machine installation. Selected chicken farms should
replacing the sealing plate and bolt screw down, check the water surface and supports the slider surface in height meets the requirements, to ensure that the amount of compression. 8.2.5 installation of hydraulic headstock gear hinge installation: first cylinder hinge seat base weld chipboard, hinges in place, release height measurement by total station and the Center, horizontal control points. Good point, concentricity control hinge and hinge seat elevation. Fuel tank installation: when the hinged seat second stage concrete strength to meet the design requirements, fuel tank installation. Cylinder before installation, clean line on the cylinder and cylinder connection and reinforcement. Cylinder and hinged connections, welding a temporary support the fuel tank is fixed, so that later no load test. Hydraulic installation: after the formation of headstock gear room, equipment will be provided according to the design drawings of hydraulic station channel, expansion bolts. 8.2.6 hoist to install one-way door installation: cart traveling mechanism in place, running gear and bottom beam positioning position the connection of the factory is completed, 50 ton crawler crane to hoist them in orbit, adjust levels, span and diagonal, finished, reinforced. Legs installed: legs and beams composed of h-shaped, adjust the legs after opening size consistent with the bottom end rail bolt hole distance, tight bolts with 50T crane hoisting. Adjust vertical degrees, fixed with chain and wire rope. Machine installation: two legs after the installation process is completed and fully fixed, for machine installation. Selected chicken farms should
replacing the sealing plate and bolt screw down, check the water surface and supports the slider surface in height meets the requirements, to ensure that the amount of compression. 8.2.5 installation of hydraulic headstock gear hinge installation: first cylinder hinge seat base weld chipboard, hinges in place, release height measurement by total station and the Center, horizontal control points. Good point, concentricity control hinge and hinge seat elevation. Fuel tank installation: when the hinged seat second stage concrete strength to meet the design requirements, fuel tank installation. Cylinder before installation, clean line on the cylinder and cylinder connection and reinforcement. Cylinder and hinged connections, welding a temporary support the fuel tank is fixed, so that later no load test. Hydraulic installation: after the formation of headstock gear room, equipment will be provided according to the design drawings of hydraulic station channel, expansion bolts. 8.2.6 hoist to install one-way door installation: cart traveling mechanism in place, running gear and bottom beam positioning position the connection of the factory is completed, 50 ton crawler crane to hoist them in orbit, adjust levels, span and diagonal, finished, reinforced. Legs installed: legs and beams composed of h-shaped, adjust the legs after opening size consistent with the bottom end rail bolt hole distance, tight bolts with 50T crane hoisting. Adjust vertical degrees, fixed with chain and wire rope. Machine installation: two legs after the installation process is completed and fully fixed, for machine installation. Selected chicken farms should
replacing the sealing plate and bolt screw down, check the water surface and supports the slider surface in height meets the requirements, to ensure that the amount of compression. 8.2.5 installation of hydraulic headstock gear hinge installation: first cylinder hinge seat base weld chipboard, hinges in place, release height measurement by total station and the Center, horizontal control points. Good point, concentricity control hinge and hinge seat elevation. Fuel tank installation: when the hinged seat second stage concrete strength to meet the design requirements, fuel tank installation. Cylinder before installation, clean line on the cylinder and cylinder connection and reinforcement. Cylinder and hinged connections, welding a temporary support the fuel tank is fixed, so that later no load test. Hydraulic installation: after the formation of headstock gear room, equipment will be provided according to the design drawings of hydraulic station channel, expansion bolts. 8.2.6 hoist to install one-way door installation: cart traveling mechanism in place, running gear and bottom beam positioning position the connection of the factory is completed, 50 ton crawler crane to hoist them in orbit, adjust levels, span and diagonal, finished, reinforced. Legs installed: legs and beams composed of h-shaped, adjust the legs after opening size consistent with the bottom end rail bolt hole distance, tight bolts with 50T crane hoisting. Adjust vertical degrees, fixed with chain and wire rope. Machine installation: two legs after the installation process is completed and fully fixed, for machine installation. Selected chicken farms should
replacing the sealing plate and bolt screw down, check the water surface and supports the slider surface in height meets the requirements, to ensure that the amount of compression. 8.2.5 installation of hydraulic headstock gear hinge installation: first cylinder hinge seat base weld chipboard, hinges in place, release height measurement by total station and the Center, horizontal control points. Good point, concentricity control hinge and hinge seat elevation. Fuel tank installation: when the hinged seat second stage concrete strength to meet the design requirements, fuel tank installation. Cylinder before installation, clean line on the cylinder and cylinder connection and reinforcement. Cylinder and hinged connections, welding a temporary support the fuel tank is fixed, so that later no load test. Hydraulic installation: after the formation of headstock gear room, equipment will be provided according to the design drawings of hydraulic station channel, expansion bolts. 8.2.6 hoist to install one-way door installation: cart traveling mechanism in place, running gear and bottom beam positioning position the connection of the factory is completed, 50 ton crawler crane to hoist them in orbit, adjust levels, span and diagonal, finished, reinforced. Legs installed: legs and beams composed of h-shaped, adjust the legs after opening size consistent with the bottom end rail bolt hole distance, tight bolts with 50T crane hoisting. Adjust vertical degrees, fixed with chain and wire rope. Machine installation: two legs after the installation process is completed and fully fixed, for machine installation. Selected chicken farms should
replacing the sealing plate and bolt screw down, check the water surface and supports the slider surface in height meets the requirements, to ensure that the amount of compression. 8.2.5 installation of hydraulic headstock gear hinge installation: first cylinder hinge seat base weld chipboard, hinges in place, release height measurement by total station and the Center, horizontal control points. Good point, concentricity control hinge and hinge seat elevation. Fuel tank installation: when the hinged seat second stage concrete strength to meet the design requirements, fuel tank installation. Cylinder before installation, clean line on the cylinder and cylinder connection and reinforcement. Cylinder and hinged connections, welding a temporary support the fuel tank is fixed, so that later no load test. Hydraulic installation: after the formation of headstock gear room, equipment will be provided according to the design drawings of hydraulic station channel, expansion bolts. 8.2.6 hoist to install one-way door installation: cart traveling mechanism in place, running gear and bottom beam positioning position the connection of the factory is completed, 50 ton crawler crane to hoist them in orbit, adjust levels, span and diagonal, finished, reinforced. Legs installed: legs and beams composed of h-shaped, adjust the legs after opening size consistent with the bottom end rail bolt hole distance, tight bolts with 50T crane hoisting. Adjust vertical degrees, fixed with chain and wire rope. Machine installation: two legs after the installation process is completed and fully fixed, for machine installation. Selected chicken farms should
replacing the sealing plate and bolt screw down, check the water surface and supports the slider surface in height meets the requirements, to ensure that the amount of compression. 8.2.5 installation of hydraulic headstock gear hinge installation: first cylinder hinge seat base weld chipboard, hinges in place, release height measurement by total station and the Center, horizontal control points. Good point, concentricity control hinge and hinge seat elevation. Fuel tank installation: when the hinged seat second stage concrete strength to meet the design requirements, fuel tank installation. Cylinder before installation, clean line on the cylinder and cylinder connection and reinforcement. Cylinder and hinged connections, welding a temporary support the fuel tank is fixed, so that later no load test. Hydraulic installation: after the formation of headstock gear room, equipment will be provided according to the design drawings of hydraulic station channel, expansion bolts. 8.2.6 hoist to install one-way door installation: cart traveling mechanism in place, running gear and bottom beam positioning position the connection of the factory is completed, 50 ton crawler crane to hoist them in orbit, adjust levels, span and diagonal, finished, reinforced. Legs installed: legs and beams composed of h-shaped, adjust the legs after opening size consistent with the bottom end rail bolt hole distance, tight bolts with 50T crane hoisting. Adjust vertical degrees, fixed with chain and wire rope. Machine installation: two legs after the installation process is completed and fully fixed, for machine installation. Selected chicken farms should
replacing the sealing plate and bolt screw down, check the water surface and supports the slider surface in height meets the requirements, to ensure that the amount of compression. 8.2.5 installation of hydraulic headstock gear hinge installation: first cylinder hinge seat base weld chipboard, hinges in place, release height measurement by total station and the Center, horizontal control points. Good point, concentricity control hinge and hinge seat elevation. Fuel tank installation: when the hinged seat second stage concrete strength to meet the design requirements, fuel tank installation. Cylinder before installation, clean line on the cylinder and cylinder connection and reinforcement. Cylinder and hinged connections, welding a temporary support the fuel tank is fixed, so that later no load test. Hydraulic installation: after the formation of headstock gear room, equipment will be provided according to the design drawings of hydraulic station channel, expansion bolts. 8.2.6 hoist to install one-way door installation: cart traveling mechanism in place, running gear and bottom beam positioning position the connection of the factory is completed, 50 ton crawler crane to hoist them in orbit, adjust levels, span and diagonal, finished, reinforced. Legs installed: legs and beams composed of h-shaped, adjust the legs after opening size consistent with the bottom end rail bolt hole distance, tight bolts with 50T crane hoisting. Adjust vertical degrees, fixed with chain and wire rope. Machine installation: two legs after the installation process is completed and fully fixed, for machine installation. Selected chicken farms should