为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

酷派5832开虚拟内存,让手机玩游戏也流畅

2018-02-05 16页 doc 172KB 14阅读

用户头像

is_496339

暂无简介

举报
酷派5832开虚拟内存,让手机玩游戏也流畅酷派5832开虚拟内存,让手机玩游戏也流畅 发教程前要感谢lincoln5481 是他发的帖子让知道怎么开虚拟内存的,也就是下面要说的开swap~(蓝色的字是我Virtues的改动,供各位参考) 老规矩先上图: 教程分两个部分:1、设置SD卡的分区 2、设置手机SWAP 一、设置SD分区: 需要工具 分区软件:点我下载 :# Pu ash must not exceed 1500mm. Block in place and more are: block, should be watered before rus...
酷派5832开虚拟内存,让手机玩游戏也流畅
酷派5832开虚拟内存,让手机玩游戏也流畅 发前要感谢lincoln5481 是他发的帖子让知道怎么开虚拟内存的,也就是下面要说的开swap~(蓝色的字是我Virtues的改动,供各位参考) 老规矩先上图: 教程分两个部分:1、设置SD卡的分区 2、设置手机SWAP 一、设置SD分区: 需要工具 分区软件:点我下载 :# Pu ash must not exceed 1500mm. Block in place and more are: block, should be watered before rushing to dust, clear blocks debris on the surface of the rear handle. During handling and transport of aerated concrete blocks, throws and dumping is strictly prohibited, after entering varieties and specifications, respectively a tidy, stacking height should not be more than 2m. Aerated concrete blocks to prevent rain. When each layer of masonry, from the corner or anchor blocks, starting at the crane masonry skin, correct skin, Pi Pila control elevation of masonry and wall flatness. Vertical filling mortar: each building block, in place after the correction, filling Vertical joints with mortar, followed by joint seam (puree jointing), depth of General 3--5mm. When masonry masonry adjacent to the near boards, beams, masonry is heavy (about 7 days) with sliced work lower after masonry between the upper plate beam and used ordinary clay bricks to tight filling, mortar full tilt of about 60 ?. Masonry body and cut force wall Zhijian of gap with mortar fill, and squeeze real, gray sewing cross flat vertical, level gray sewing should be control in 15mm around, but not is less than 10MM, not is greater than 20mm, level gray sewing of full degrees shall not below 80%, vertical to gray sewing should be control in 20mm around, but not is less than 15mm, not is greater than 25mm, vertical sewing shall not appeared transparent sewing. Infilled beams according to the building plans of opening hole in lintel Universal Atlas use. Load levels, the design requirements, when the hole close to the shear walls, beams using in-situ construction, concrete shear walls, according to relevant standard specification for anchorage. By design requirements set structure column, 步骤: 1、打开Partition Manager9.0,找到sd卡位置(别选到你的电脑盘的,看清楚了,要不就悲剧了~),。把卡上原来的分区全都删除掉(右键原来的分区,选择删除分区),然后右键,选择新建分区。 2、首先创建个fat32的分区(大小根据你的SD卡大小而定,我的是2G(实际在1.8G左右)的卡,所以我把fat32这个区分配了1.4G,然后swap分配200M,ext3分配200M 左右) 然后一定要给FAT32这个分区指定个盘符(一定要指定盘符~~~),这样分区好以后电脑才能识别出fat32这个分区。(第一分区一定要是FAT32) 3、然后给剩下的400m未分区的部分分别分区为swap,ext3就可以了,同上。这2个分区不用指定盘符)(我分区的时候第二分区的是ext3,最后的分区是swap,因在网络上看到换过来会出问) 4、好了,现在分区完毕,然后点击左上角的绿色箭头,执行操作(一定要执行操作,不然什么事情也没干),等几分钟后,你的SD卡就分区完毕了。 这是我分区好的截图 Pu ash must not exceed 1500mm. Block in place and more are: block, should be watered before rushing to dust, clear blocks debris on the surface of the rear handle. During handling and transport of aerated concrete blocks, throws and dumping is strictly prohibited, after entering varieties and specifications, respectively a tidy, stacking height should not be more than 2m. Aerated concrete blocks to prevent rain. When each layer of masonry, from the corner or anchor blocks, starting at the crane masonry skin, correct skin, Pi Pila control elevation of masonry and wall flatness. Vertical filling mortar: each building block, in place after the correction, filling Vertical joints with mortar, followed by joint seam (puree jointing), depth of General 3--5mm. When masonry masonry adjacent to the near boards, beams, masonry is heavy (about 7 days) with sliced work lower after masonry between the upper plate beam and used ordinary clay bricks to tight filling, mortar full tilt of about 60 ?. Masonry body and cut force wall Zhijian of gap with mortar fill, and squeeze real, gray sewing cross flat vertical, level gray sewing should be control in 15mm around, but not is less than 10MM, not is greater than 20mm, level gray sewing of full degrees shall not below 80%, vertical to gray sewing should be control in 20mm around, but not is less than 15mm, not is greater than 25mm, vertical sewing shall not appeared transparent sewing. Infilled beams according to the building plans of opening hole in lintel Universal Atlas use. Load levels, the design requirements, when the hole close to the shear walls, beams using in-situ construction, concrete shear walls, according to relevant standard specification for anchorage. By design requirements set structure column, 其次,我们就要来对酷派5855进行swapper工具的设置了(swapper2工具我找不到连接了,这样吧,我附件一会放上,我用的是英文的) ?安装好swap工具后,点击swapper进入操作界面,界面如下: 这个是成功后的信息,下方的swap已经有数据了,如果没开成功,是0kb(不是酷派的,酷派memory只有2421112kb),swappiness设置成60的。 Pu ash must not exceed 1500mm. Block in place and more are: block, should be watered before rushing to dust, clear blocks debris on the surface of the rear handle. During handling and transport of aerated concrete blocks, throws and dumping is strictly prohibited, after entering varieties and specifications, respectively a tidy, stacking height should not be more than 2m. Aerated concrete blocks to prevent rain. When each layer of masonry, from the corner or anchor blocks, starting at the crane masonry skin, correct skin, Pi Pila control elevation of masonry and wall flatness. Vertical filling mortar: each building block, in place after the correction, filling Vertical joints with mortar, followed by joint seam (puree jointing), depth of General 3--5mm. When masonry masonry adjacent to the near boards, beams, masonry is heavy (about 7 days) with sliced work lower after masonry between the upper plate beam and used ordinary clay bricks to tight filling, mortar full tilt of about 60 ?. Masonry body and cut force wall Zhijian of gap with mortar fill, and squeeze real, gray sewing cross flat vertical, level gray sewing should be control in 15mm around, but not is less than 10MM, not is greater than 20mm, level gray sewing of full degrees shall not below 80%, vertical to gray sewing should be control in 20mm around, but not is less than 15mm, not is greater than 25mm, vertical sewing shall not appeared transparent sewing. Infilled beams according to the building plans of opening hole in lintel Universal Atlas use. Load levels, the design requirements, when the hole close to the shear walls, beams using in-situ construction, concrete shear walls, according to relevant standard specification for anchorage. By design requirements set structure column, 点击设置进行设置,按图一步一步设置即可。 ?点击上图的“设置”,英文版为settings,进入,然后点掉第一行的“run swapper at startup” (开机时运行swapper) ?选择swap place(swap位置),如下图设置位置【默认没有sd,要加上的】,确定则设置 Ok: Pu ash must not exceed 1500mm. Block in place and more are: block, should be watered before rushing to dust, clear blocks debris on the surface of the rear handle. During handling and transport of aerated concrete blocks, throws and dumping is strictly prohibited, after entering varieties and specifications, respectively a tidy, stacking height should not be more than 2m. Aerated concrete blocks to prevent rain. When each layer of masonry, from the corner or anchor blocks, starting at the crane masonry skin, correct skin, Pi Pila control elevation of masonry and wall flatness. Vertical filling mortar: each building block, in place after the correction, filling Vertical joints with mortar, followed by joint seam (puree jointing), depth of General 3--5mm. When masonry masonry adjacent to the near boards, beams, masonry is heavy (about 7 days) with sliced work lower after masonry between the upper plate beam and used ordinary clay bricks to tight filling, mortar full tilt of about 60 ?. Masonry body and cut force wall Zhijian of gap with mortar fill, and squeeze real, gray sewing cross flat vertical, level gray sewing should be control in 15mm around, but not is less than 10MM, not is greater than 20mm, level gray sewing of full degrees shall not below 80%, vertical to gray sewing should be control in 20mm around, but not is less than 15mm, not is greater than 25mm, vertical sewing shall not appeared transparent sewing. Infilled beams according to the building plans of opening hole in lintel Universal Atlas use. Load levels, the design requirements, when the hole close to the shear walls, beams using in-situ construction, concrete shear walls, according to relevant standard specification for anchorage. By design requirements set structure column, ?点击“swap大小”swap size,选择96MB即可(我用的是256) ?点击“swappiness”,选择60即可,据说是百分比,使用这个选择感觉还可以,若有想法可 以试试其他的选项哈。 ?点击“高级选项”即 advanced preferences,将3个勾都打上,如下图: Pu ash must not exceed 1500mm. Block in place and more are: block, should be watered before rushing to dust, clear blocks debris on the surface of the rear handle. During handling and transport of aerated concrete blocks, throws and dumping is strictly prohibited, after entering varieties and specifications, respectively a tidy, stacking height should not be more than 2m. Aerated concrete blocks to prevent rain. When each layer of masonry, from the corner or anchor blocks, starting at the crane masonry skin, correct skin, Pi Pila control elevation of masonry and wall flatness. Vertical filling mortar: each building block, in place after the correction, filling Vertical joints with mortar, followed by joint seam (puree jointing), depth of General 3--5mm. When masonry masonry adjacent to the near boards, beams, masonry is heavy (about 7 days) with sliced work lower after masonry between the upper plate beam and used ordinary clay bricks to tight filling, mortar full tilt of about 60 ?. Masonry body and cut force wall Zhijian of gap with mortar fill, and squeeze real, gray sewing cross flat vertical, level gray sewing should be control in 15mm around, but not is less than 10MM, not is greater than 20mm, level gray sewing of full degrees shall not below 80%, vertical to gray sewing should be control in 20mm around, but not is less than 15mm, not is greater than 25mm, vertical sewing shall not appeared transparent sewing. Infilled beams according to the building plans of opening hole in lintel Universal Atlas use. Load levels, the design requirements, when the hole close to the shear walls, beams using in-situ construction, concrete shear walls, according to relevant standard specification for anchorage. By design requirements set structure column, ?点击“swap分区”即swap partition,输入框中内容为“/dev/block/mmcblk1p2”,意思是用 sd卡的第二个分区。如下图(请朋友们注意, “1p2”是数字1,一,不是 英文L,L) (我分区的时候虚拟内存是第三 分区,所以我是保持不变的) Pu ash must not exceed 1500mm. Block in place and more are: block, should be watered before rushing to dust, clear blocks debris on the surface of the rear handle. During handling and transport of aerated concrete blocks, throws and dumping is strictly prohibited, after entering varieties and specifications, respectively a tidy, stacking height should not be more than 2m. Aerated concrete blocks to prevent rain. When each layer of masonry, from the corner or anchor blocks, starting at the crane masonry skin, correct skin, Pi Pila control elevation of masonry and wall flatness. Vertical filling mortar: each building block, in place after the correction, filling Vertical joints with mortar, followed by joint seam (puree jointing), depth of General 3--5mm. When masonry masonry adjacent to the near boards, beams, masonry is heavy (about 7 days) with sliced work lower after masonry between the upper plate beam and used ordinary clay bricks to tight filling, mortar full tilt of about 60 ?. Masonry body and cut force wall Zhijian of gap with mortar fill, and squeeze real, gray sewing cross flat vertical, level gray sewing should be control in 15mm around, but not is less than 10MM, not is greater than 20mm, level gray sewing of full degrees shall not below 80%, vertical to gray sewing should be control in 20mm around, but not is less than 15mm, not is greater than 25mm, vertical sewing shall not appeared transparent sewing. Infilled beams according to the building plans of opening hole in lintel Universal Atlas use. Load levels, the design requirements, when the hole close to the shear walls, beams using in-situ construction, concrete shear walls, according to relevant standard specification for anchorage. By design requirements set structure column, 设置完成点击“OK”即完成配置。 到这里,就完成了swapper的配置,下面就是要开启swapper了~~~ 在如下界面中,点击“swap on”按钮(一般快的10秒的样子就All done了,关闭好像慢的 很,1分多钟的样子,~如果挺在这里了估计是卡住了或是没配好,建议按文字的描述重配 一下。) Pu ash must not exceed 1500mm. Block in place and more are: block, should be watered before rushing to dust, clear blocks debris on the surface of the rear handle. During handling and transport of aerated concrete blocks, throws and dumping is strictly prohibited, after entering varieties and specifications, respectively a tidy, stacking height should not be more than 2m. Aerated concrete blocks to prevent rain. When each layer of masonry, from the corner or anchor blocks, starting at the crane masonry skin, correct skin, Pi Pila control elevation of masonry and wall flatness. Vertical filling mortar: each building block, in place after the correction, filling Vertical joints with mortar, followed by joint seam (puree jointing), depth of General 3--5mm. When masonry masonry adjacent to the near boards, beams, masonry is heavy (about 7 days) with sliced work lower after masonry between the upper plate beam and used ordinary clay bricks to tight filling, mortar full tilt of about 60 ?. Masonry body and cut force wall Zhijian of gap with mortar fill, and squeeze real, gray sewing cross flat vertical, level gray sewing should be control in 15mm around, but not is less than 10MM, not is greater than 20mm, level gray sewing of full degrees shall not below 80%, vertical to gray sewing should be control in 20mm around, but not is less than 15mm, not is greater than 25mm, vertical sewing shall not appeared transparent sewing. Infilled beams according to the building plans of opening hole in lintel Universal Atlas use. Load levels, the design requirements, when the hole close to the shear walls, beams using in-situ construction, concrete shear walls, according to relevant standard specification for anchorage. By design requirements set structure column, 当下方出现 all done!后,点击“获取信息”按钮,即可看到如下界面,swap中有信息示swap开启成功: 如果成功开启就不要往下看了,如果还不行就继续看。 首先是内存分区,按上面帖子分就可以了,这里我不多说,仅说其它帖子内没有的内容。 首先下载附件busubox.rar(群共享内有) 并解压到SD卡中,再用RE管理器把解压后的文件复制粘贴到/system/bin里面,方法先挂载为读写,再长按文件选复制,到/system/bin文件夹中点粘贴,替换原有同名文件,即可。 再回到SWAPPER中,再点开,等待一会(约20秒),SWAPPER会显示所有都已是成功的,然后退出。(SWAP默认是32M,可以在设置中改为128M或更大,再“开”。) 然后重启你的手机。成功~~ Pu ash must not exceed 1500mm. Block in place and more are: block, should be watered before rushing to dust, clear blocks debris on the surface of the rear handle. During handling and transport of aerated concrete blocks, throws and dumping is strictly prohibited, after entering varieties and specifications, respectively a tidy, stacking height should not be more than 2m. Aerated concrete blocks to prevent rain. When each layer of masonry, from the corner or anchor blocks, starting at the crane masonry skin, correct skin, Pi Pila control elevation of masonry and wall flatness. Vertical filling mortar: each building block, in place after the correction, filling Vertical joints with mortar, followed by joint seam (puree jointing), depth of General 3--5mm. When masonry masonry adjacent to the near boards, beams, masonry is heavy (about 7 days) with sliced work lower after masonry between the upper plate beam and used ordinary clay bricks to tight filling, mortar full tilt of about 60 ?. Masonry body and cut force wall Zhijian of gap with mortar fill, and squeeze real, gray sewing cross flat vertical, level gray sewing should be control in 15mm around, but not is less than 10MM, not is greater than 20mm, level gray sewing of full degrees shall not below 80%, vertical to gray sewing should be control in 20mm around, but not is less than 15mm, not is greater than 25mm, vertical sewing shall not appeared transparent sewing. Infilled beams according to the building plans of opening hole in lintel Universal Atlas use. Load levels, the design requirements, when the hole close to the shear walls, beams using in-situ construction, concrete shear walls, according to relevant standard specification for anchorage. By design requirements set structure column,
/
本文档为【酷派5832开虚拟内存,让手机玩游戏也流畅】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索