iPad连接苹果蓝牙键盘和鼠标的方法
iPad是一台平板电脑,怎样能让他像一台普通的电脑一样连接鼠标呢,
首先要确定你的iPad已经越狱,进入Cydia搜索BTstack Mouse这个软件,然后点击安装
这个软件。
65m, in the middle of 25th standard section, the fourth way is 80m, in the middle of 32nd standard section. The fifth is 98m, in the middle of 39th standard section. (D) the crane operation control to ensure the duration of tower crane during use must be strictly controlled. In the course of construction, 24 hours, tower crane operations, be coordinated by hand signal, and crane drivers to strictly obey the unified command. Layout of tower crane Foundation, main floor plan. Four, finished construction of cushion in Foundation pile construction, excavation of trench experience after the charge meets the requirements, you can begin construction of cushion, cushion for 300 mm thick and 2:8 lime-soil compaction. Tamping is not greater than 0.9, to meet the design requirements of C15 concrete pad before the construction, and the workers were good technical disclosure, request vibrators for concrete surfaces immediately after tamping with wooden pattern molded flat covering plastic sheeting, in front of a concrete final setting with a pressure of iron, covered with pressure as requested. Brick mould construction followed. Five underground waterproof Engineering (a) flexible waterproof layer on waterproofing of underground construction, we must strengthen the construction quality control of detail. Focus on checking before construction of deep Foundation pit precipitation in parts of the case, preventing groundwater waterproofing layer up. Floor, basement waterproofing for 1.5 mm PET polymer modified bitumen self-adhesive flexible waterproof material. In the course of construction,
安装完毕后在桌面上找到mouse这个图标,点击进入。
这时保证你的苹果蓝牙鼠标是开着的,iPad搜索并匹配连接鼠标。
65m, in the middle of 25th standard section, the fourth way is 80m, in the middle of 32nd standard section. The fifth is 98m, in the middle of 39th standard section. (D) the crane operation control to ensure the duration of tower crane during use must be strictly controlled. In the course of construction, 24 hours, tower crane operations, be coordinated by hand signal, and crane drivers to strictly obey the unified command. Layout of tower crane Foundation, main floor plan. Four, finished construction of cushion in Foundation pile construction, excavation of trench experience after the charge meets the requirements, you can begin construction of cushion, cushion for 300 mm thick and 2:8 lime-soil compaction. Tamping is not greater than 0.9, to meet the design requirements of C15 concrete pad before the construction, and the workers were good technical disclosure, request vibrators for concrete surfaces immediately after tamping with wooden pattern molded flat covering plastic sheeting, in front of a concrete final setting with a pressure of iron, covered with pressure as requested. Brick mould construction followed. Five underground waterproof Engineering (a) flexible waterproof layer on waterproofing of underground construction, we must strengthen the construction quality control of detail. Focus on checking before construction of deep Foundation pit precipitation in parts of the case, preventing groundwater waterproofing layer up. Floor, basement waterproofing for 1.5 mm PET polymer modified bitumen self-adhesive flexible waterproof material. In the course of construction,
连接后你可以在设置内找到mouse项,调节灵敏度和光标移动速度。
当全部配置完成你就可以使用啦,当然还有蓝牙键盘也可以连接,方法一样。