为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

高清47寸液晶监视器 47寸监控专用显示器

2018-04-15 11页 doc 138KB 7阅读

用户头像

is_321575

暂无简介

举报
高清47寸液晶监视器 47寸监控专用显示器高清47寸液晶监视器 47寸监控专用显示器 Pu ash must not exceed 1500mm. Block in place and more are: block, should be watered before rushing to dust, clear blocks debris on the surface of the rear handle. During handling and transport of aerated concrete blocks, throws and dumping i...
高清47寸液晶监视器 47寸监控专用显示器
高清47寸液晶监视器 47寸监控专用显示器 Pu ash must not exceed 1500mm. Block in place and more are: block, should be watered before rushing to dust, clear blocks debris on the surface of the rear handle. During handling and transport of aerated concrete blocks, throws and dumping is strictly prohibited, after entering varieties and specifications, respectively a tidy, stacking height should not be more than 2m. Aerated concrete blocks to prevent rain. When each layer of masonry, from the corner or anchor blocks, starting at the crane masonry skin, correct skin, Pi Pila control elevation of masonry and wall flatness. Vertical filling mortar: each building block, in place after the correction, filling Vertical joints with mortar, followed by joint seam (puree jointing), depth of General 3--5mm. When masonry masonry adjacent to the near boards, beams, masonry is heavy (about 7 days) with sliced work lower after masonry between the upper plate beam and used ordinary clay bricks to tight filling, mortar full tilt of about 60 ?. Masonry body and cut force wall Zhijian of gap with mortar fill, and squeeze real, gray sewing cross flat vertical, level gray sewing should be control in 15mm around, but not is less than 10MM, not is greater than 20mm, level gray sewing of full degrees shall not below 80%, vertical to gray sewing should be control in 20mm around, but not is less than 15mm, not is greater than 25mm, vertical sewing shall not appeared transparent sewing. Infilled beams according to the building plans of opening hole in lintel Universal Atlas use. Load levels, the design requirements, when the hole close to the shear walls, beams using in-situ construction, concrete shear walls, according to relevant standard specification for anchorage. By design requirements set structure column, 特点参数:(47寸液晶监视器) 联系厂家:陈剑飞-138 260-447 75 - QQ:177 650-45 06 ?超薄超轻设计,使用方便、美观 ?高对比度,高亮度,极大提高画面层次感,能更好表现细节 ?具有自动消除残影功能,保护液晶屏的长期使用 ?16.7M色,画面更加自然,细腻 ?极速响应时间,画面真正无拖尾 ?12C总线最新控制电路,整机可靠性高,扩展性好 ?多层次菜单显示功能 ?内置电源,能耗低,液晶屏使用寿命可达6万小时以上 ?具有VGA状态图像重显率自动调整功能 ?采用最新3D画质数字处得电路 ?丰富的对接功能 ?超静音冷风扇设计,整机寿命更长 规格名称 参数 规格型号/Specifications YC-4728C 面板尺寸/Panel size 47″ 显示面积/Display Area 1041mm(W)×585mm(H) 显示模式/Display Mode 16:9 液晶类型/LCD Type TFT-LCD 最大分辨率/Max Resolution 1920×1080 显示色彩/Display color 16.7M 点距(mm)/Dot Pitch 0.53025(H)×0.53025(V) 亮度(nits)/Brightness 800cd/? 对比度/Contrast 1500:1 Pu ash must not exceed 1500mm. Block in place and more are: block, should be watered before rushing to dust, clear blocks debris on the surface of the rear handle. During handling and transport of aerated concrete blocks, throws and dumping is strictly prohibited, after entering varieties and specifications, respectively a tidy, stacking height should not be more than 2m. Aerated concrete blocks to prevent rain. When each layer of masonry, from the corner or anchor blocks, starting at the crane masonry skin, correct skin, Pi Pila control elevation of masonry and wall flatness. Vertical filling mortar: each building block, in place after the correction, filling Vertical joints with mortar, followed by joint seam (puree jointing), depth of General 3--5mm. When masonry masonry adjacent to the near boards, beams, masonry is heavy (about 7 days) with sliced work lower after masonry between the upper plate beam and used ordinary clay bricks to tight filling, mortar full tilt of about 60 ?. Masonry body and cut force wall Zhijian of gap with mortar fill, and squeeze real, gray sewing cross flat vertical, level gray sewing should be control in 15mm around, but not is less than 10MM, not is greater than 20mm, level gray sewing of full degrees shall not below 80%, vertical to gray sewing should be control in 20mm around, but not is less than 15mm, not is greater than 25mm, vertical sewing shall not appeared transparent sewing. Infilled beams according to the building plans of opening hole in lintel Universal Atlas use. Load levels, the design requirements, when the hole close to the shear walls, beams using in-situ construction, concrete shear walls, according to relevant standard specification for anchorage. By design requirements set structure column, 广州市易传电子科技有限公司 高清47寸液晶监视器 视角(上/下/左/右) 178?/178?/178?/178? 响应时间/Response Time 8ms 场频/Field Frequency 50Hz、60Hz、70Hz 复合视频输入/Composite video input 5路BNC(BNC*5)输入 复合视频输出/Composite video output 2路BNC(BNC*2)输出,可接录像设备等 YPbPr/YCbCr输入/YPbPr/YCbCr input 1路BNC(BNC*3)输入 VGA输入/VGA input 1路D-SUB VGA输入 DVI/DVI 1路DVI数字视频信号输入 HDMI/HDMI 1路HDMI输入 音频输入/Audio input 2路3.5音频输入 彩色系统/Color system PAL/NTSC/自动识别 兼容的HD TV输入/Compatibal HD TV Input 480P、576P、720P、1080I、1080P 3D梳状滤波/3D Combfilter 有 视频降噪/Denoise 有 菜单语言(可选)/OSD Language 中文/英文 电源/Power AC100V~240V,50/60Hz 最大功率损耗/The maximum power loss ?300W 待机功率损耗/Standby power loss ,1W 散热系统/Cooling system 超静音双风扇散热 机壳材质/Frame material 铝合金拉丝光油外观 机身尺寸(长×高×厚) 1125mm*669mm*110.0mm 包装尺寸/Package sizes 1200.0mm*270.0mm*765.0mm 安装方式/Installation 机柜/壁挂/悬挂 壁挂/底坐(选配)、电源线、遥控器、说明配件/Accessories 书、保修卡、合格证 规格名称 参数 规格型号/Specifications YC-4728C 面板尺寸/Panel size 47″ 显示面积/Display Area 1041mm(W)×585mm(H) 显示模式/Display Mode 16:9 液晶类型/LCD Type TFT-LCD 最大分辨率/Max Resolution 1920×1080 显示色彩/Display color 16.7M 点距(mm)/Dot Pitch 0.53025(H)×0.53025(V) 亮度(nits)/Brightness 800cd/? 对比度/Contrast 1500:1 视角(上/下/左/右) 178?/178?/178?/178? 响应时间/Response Time 8ms 场频/Field Frequency 50Hz、60Hz、70Hz 复合视频输入/Composite video input 5路BNC(BNC*5)输入 复合视频输出/Composite video output 2路BNC(BNC*2)输出,可接录像设备等 YPbPr/YCbCr输入/YPbPr/YCbCr input 1路BNC(BNC*3)输入 Pu ash must not exceed 1500mm. Block in place and more are: block, should be watered before rushing to dust, clear blocks debris on the surface of the rear handle. During handling and transport of aerated concrete blocks, throws and dumping is strictly prohibited, after entering varieties and specifications, respectively a tidy, stacking height should not be more than 2m. Aerated concrete blocks to prevent rain. When each layer of masonry, from the corner or anchor blocks, starting at the crane masonry skin, correct skin, Pi Pila control elevation of masonry and wall flatness. Vertical filling mortar: each building block, in place after the correction, filling Vertical joints with mortar, followed by joint seam (puree jointing), depth of General 3--5mm. When masonry masonry adjacent to the near boards, beams, masonry is heavy (about 7 days) with sliced work lower after masonry between the upper plate beam and used ordinary clay bricks to tight filling, mortar full tilt of about 60 ?. Masonry body and cut force wall Zhijian of gap with mortar fill, and squeeze real, gray sewing cross flat vertical, level gray sewing should be control in 15mm around, but not is less than 10MM, not is greater than 20mm, level gray sewing of full degrees shall not below 80%, vertical to gray sewing should be control in 20mm around, but not is less than 15mm, not is greater than 25mm, vertical sewing shall not appeared transparent sewing. Infilled beams according to the building plans of opening hole in lintel Universal Atlas use. Load levels, the design requirements, when the hole close to the shear walls, beams using in-situ construction, concrete shear walls, according to relevant standard specification for anchorage. By design requirements set structure column, VGA输入/VGA input 1路D-SUB VGA输入 DVI/DVI 1路DVI数字视频信号输入 HDMI/HDMI 1路HDMI输入 音频输入/Audio input 2路3.5音频输入 彩色系统/Color system PAL/NTSC/自动识别 兼容的HD TV输入/Compatibal HD TV Input 480P、576P、720P、1080I、1080P 3D梳状滤波/3D Combfilter 有 视频降噪/Denoise 有 菜单语言(可选)/OSD Language 中文/英文 电源/Power AC100V~240V,50/60Hz 最大功率损耗/The maximum power loss ?300W 待机功率损耗/Standby power loss ,1W 散热系统/Cooling system 超静音双风扇散热 机壳材质/Frame material 铝合金拉丝光油外观 机身尺寸(长×高×厚) 1125mm*669mm*110.0mm 包装尺寸/Package sizes 1200.0mm*270.0mm*765.0mm 安装方式/Installation 机柜/壁挂/悬挂 壁挂/底坐(选配)、电源线、遥控器、说明配件/Accessories 书、保修卡、合格证 Pu ash must not exceed 1500mm. Block in place and more are: block, should be watered before rushing to dust, clear blocks debris on the surface of the rear handle. During handling and transport of aerated concrete blocks, throws and dumping is strictly prohibited, after entering varieties and specifications, respectively a tidy, stacking height should not be more than 2m. Aerated concrete blocks to prevent rain. When each layer of masonry, from the corner or anchor blocks, starting at the crane masonry skin, correct skin, Pi Pila control elevation of masonry and wall flatness. Vertical filling mortar: each building block, in place after the correction, filling Vertical joints with mortar, followed by joint seam (puree jointing), depth of General 3--5mm. When masonry masonry adjacent to the near boards, beams, masonry is heavy (about 7 days) with sliced work lower after masonry between the upper plate beam and used ordinary clay bricks to tight filling, mortar full tilt of about 60 ?. Masonry body and cut force wall Zhijian of gap with mortar fill, and squeeze real, gray sewing cross flat vertical, level gray sewing should be control in 15mm around, but not is less than 10MM, not is greater than 20mm, level gray sewing of full degrees shall not below 80%, vertical to gray sewing should be control in 20mm around, but not is less than 15mm, not is greater than 25mm, vertical sewing shall not appeared transparent sewing. Infilled beams according to the building plans of opening hole in lintel Universal Atlas use. Load levels, the design requirements, when the hole close to the shear walls, beams using in-situ construction, concrete shear walls, according to relevant standard specification for anchorage. By design requirements set structure column, 广州市易传电子科技有限公司 高清47寸液晶监视器 Pu ash must not exceed 1500mm. Block in place and more are: block, should be watered before rushing to dust, clear blocks debris on the surface of the rear handle. During handling and transport of aerated concrete blocks, throws and dumping is strictly prohibited, after entering varieties and specifications, respectively a tidy, stacking height should not be more than 2m. Aerated concrete blocks to prevent rain. When each layer of masonry, from the corner or anchor blocks, starting at the crane masonry skin, correct skin, Pi Pila control elevation of masonry and wall flatness. Vertical filling mortar: each building block, in place after the correction, filling Vertical joints with mortar, followed by joint seam (puree jointing), depth of General 3--5mm. When masonry masonry adjacent to the near boards, beams, masonry is heavy (about 7 days) with sliced work lower after masonry between the upper plate beam and used ordinary clay bricks to tight filling, mortar full tilt of about 60 ?. Masonry body and cut force wall Zhijian of gap with mortar fill, and squeeze real, gray sewing cross flat vertical, level gray sewing should be control in 15mm around, but not is less than 10MM, not is greater than 20mm, level gray sewing of full degrees shall not below 80%, vertical to gray sewing should be control in 20mm around, but not is less than 15mm, not is greater than 25mm, vertical sewing shall not appeared transparent sewing. Infilled beams according to the building plans of opening hole in lintel Universal Atlas use. Load levels, the design requirements, when the hole close to the shear walls, beams using in-situ construction, concrete shear walls, according to relevant standard specification for anchorage. By design requirements set structure column,
/
本文档为【高清47寸液晶监视器 47寸监控专用显示器】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索