专业技术职务代码
代码 职称 英文名称
011 教授 professor
012 副教授 associate professor 013 讲师 lecturer
014 助教 teaching assistant 021 高级讲师 senior lecturer 024 助理讲师 assistant lecturer 025 教员 teacher
061 研究员 professor
062 副研究员 associate professor 063 助理研究员 assistant professor 064 研究实习员 assistant engineer 071 高级实验师 senior engineer 073 实验师 engineer
074 助理实验师 assistant engineer 075 实验员 technician
081 高级
师 senior engineer 083 工程师 engineer
084 助理工程师 assistant engineer 085 技术员 technician
091 高级农艺师 senior agronomist 093 农艺师 agronomist
094 助理农艺师 assistant agronomist 095 农业技术员 agrotechnician 101 高级兽医师 senior veterinarian 103 兽医师 veterinarian 104 助理兽医师 assistant veterinarian 105 兽医技术员 technician
111 高级畜牧师 senior engineer 113 畜牧师 engineer
114 助理畜牧师 assistant engineer 115 畜牧技术员 technician
121 高级经济师 senior economist 123 经济师 economist
124 助理经济师 assistant economist 125 经济员 technician
131 高级会计师 senior certified public accountant
133 会计师 certified public accountant
scope of the entire project. (2) should include: semi-finished products, quality of materials, installation quality. (3) must be marked with the date, personnel, quality. (4) construction, construction of clearly marked sections, axis. (5) the draw details. (6) the covert acceptance record perfect, intact. 2.16 l measurement, process description the process: become familiar with the structure and design of curtain wall map, partition the whole project, baseline measurements, benchmarking measurement axis, identify key points, put the line, measure, record, replacing the original data measuring elevation
134 助理会计师 asssistant certified public accountant
135 会计员 accountant
141 高级统计师 senior statistician 143 统计师 statistician
144 助理统计师 assistant statistician 145 统计员 statistical worker 151 编审 professor
152 副编审 associate professor 153 编辑 editor
154 助理编辑 assistant editor 163 技术编辑 technical editor 164 助理技术编辑 assistant technical editor 165 技术设计员 technician
211 研究馆员 professor
212 副研究馆员 associate professor 213 馆员 librarian
214 助理馆员 assistant librarian 215 管理员 library staff 231 主任医师 professor
232 副主任医师 associate professor 233 主治医师 attending doctor 234 医师 doctor
235 医士 medical assistant 241 主任药师 chief pharmacist 242 副主任药师 associate chief pharmacist 243 主管药师 pharmacist
244 药师 pharmacist 245 药士 assistant pharmacist 251 主任护师 chief nurse
252 副主任护师 associate chief nurse 253 主管护师 nurse
254 护师 nurse
255 护士 nurse
261 主任技师 chief technician 262 副主任技师 associate chief technician 263 主管技师 technician
264 技师 technician 265 技士 assistant technician 273 博士后 post doctor 274 博士生 doctor student 275 硕士生 master student
measurement axis, identify key points, put the line, measure, record, replacing the original data measuring elevationfamiliar with the structure and design of curtain wall map, partition the whole project, baseline measurements, benchmarking become(5) the draw details. (6) the covert acceptance record perfect, intact. 2.16 l measurement, process description the process: lity. (3) must be marked with the date, personnel, quality. (4) construction, construction of clearly marked sections, axis. finished products, quality of materials, installation qua-scope of the entire project. (2) should include: semi2
entify key points, put the line, measure, record, replacing the original data measuring elevations, idhe structure and design of curtain wall map, partition the whole project, baseline measurements, benchmarking measurement axi(6) the covert acceptance record perfect, intact. 2.16 l measurement, process description the process: become familiar with t truction, construction of clearly marked sections, axis. (5) the draw details.finished products, quality of materials, installation quality. (3) must be marked with the date, personnel, quality. (4) cons-cope of the entire project. (2) should include: semis3