为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

新加坡金字塔公司项目管理模式英文版(4)

2017-10-16 18页 doc 39KB 10阅读

用户头像

is_005190

暂无简介

举报
新加坡金字塔公司项目管理模式英文版(4)新加坡金字塔公司项目管理模式英文版(4) 新加坡金字塔公司项目管理模式英文版(4) STANDARD OPERATING PROCEDURES SOP-ST-00 STRUCTURAL WORK Ref. No. Contents SOP-ST-01 Excavation and Backfilling SOP-ST-02 Foundation Work SOP-ST-03 Timber Formwork SOP-ST-04 Steel Reinforcement SOP-ST-05 Concreting ...
新加坡金字塔公司项目管理模式英文版(4)
新加坡金字塔公司项目管理模式英文版(4) 新加坡金字塔公司项目管理模式英文版(4) STANDARD OPERATING PROCEDURES SOP-ST-00 STRUCTURAL WORK Ref. No. Contents SOP-ST-01 Excavation and Backfilling SOP-ST-02 Foundation Work SOP-ST-03 Timber Formwork SOP-ST-04 Steel Reinforcement SOP-ST-05 Concreting SOP-ST-06 Lifting of Precast Hollow Core Slab SOP-ST-07 Lifting of Precast Column SOP-ST-08 Grouting to Precast Items PARK HYATT SAIGON HOTEL PROJECT STANDARD OPERATION PROCEDURE NO SOP –ST – 06 WORK TITLE : Lifting of precast follow core slab APPROVED BY : Head, Control Dept CHECKED BY : PROJECT MANAGER REVISION : A EFFECTIVE DATA : 18/5/7><98 WORKMANSHIP STANDARD : ACCEPTANCE /REJECTION CRITERIA To comply with specification REFERENCE STANDARDS/ CODES & QUALITY PLAN : To comply with specialist requirement FACILITIES /INSPECTION INSTRUMENT : Hoist beam & clambers are attached with shackle/sling ENVIRNMENT CONTROLS : NA NECESSARY RECORDS : Shop drawings FREQUENCY : Every inspection SPECIAL REQUIREMENTS : NA SAFETY & HEALTH REQUIREMENTS : Check the safety working load for hoisting equipment WORK PROCEDURE CHECKING METHOD REMEDIAL MEASURE RESPOSIBILITY Project Manager Engineer Foreman Assistant Foreman Trade Worker Checker Subcon Others 1.When delivery arrives inform the driver where to park the trailer 2. Slabs shall be off loaded using a lifting beam and clampers or a lifting beam and bells , Both systems are attached by shackle and sliding to the claim block of the crane 3.Check the condition of all lifting equipment 4.Place clampers at the correct position on the slabs 5. Check that area for lifting is clear 6. Once the slab is lifted slightly, attaché the safety chains around the component and latch on the other site of the clampers By visual By visual By visual Measure by tape By visual By visual Re-park again Re – place by the correct size Re-place by the correct size Re-adjust Clear the area Re-do F F F F F F C C C C C P P P P P P File : ST - 06 DISK: SOP A : APPROVE F : CONFIRM P : PERFORM C: CHECK PARK HYATT SAIGON HOTEL PROJECT STANDARD OPERATION PROCEDURE NO SOP –ST – 06 WORK TITLE : Lifting of precast follow core slab APPROVED BY : Head, Control Dept CHECKED BY : PROJECT MANAGER REVISION : A EFFECTIVE DATA : 18/5/<98 WORK PROCEDURE CHECKING METHOD REMEDIAL MEASURE RESPOSIBILITY Project Manager Engineer Foreman Assistant Foreman Trade Worker Checker Subcon Others 7.Hoist the slab to the installation location and lower it slowly into the correct position. 8.Once the slab is in position and seated safety, the safety chains are released , clampers are removed to pick up the next slab <9.Check that the position of the slab is correct 10.If the slab is seated in the wrong location, adjust by using a crowbar By visual By visual By visual By visual Re-do Re-do Re-do Re-do A F F F F C C C C P P P P File : ST - 06 DISK: SOP A : APPROVE F : CONFIRM P : PERFORM C: CHECK PARK HYATT SAIGON HOTEL PROJECT STANDARD OPERATION PROCEDURE NO – 07 SOP –ST WORK TITLE : Lifting of precast column APPROVED BY : Head, Control Dept CHECKED BY : PROJECT MANAGER REVISION : A EFFECTIVE DATA : 18/5/<98 WORKMANSHIP STANDARD : ACCEPTANCE /REJECTION CRITERIA To comply with specification REFERENCE STANDARDS/ CODES & QUALITY PLAN : To comply with specialist requirement FACILITIES /INSPECTION INSTRUMENT : ENVIRNMENT CONTROLS : NA NECESSARY RECORDS : Shop drawings FREQUENCY : Every inspection SPECIAL REQUIREMENTS : SAFETY & HEALTH REQUIREMENTS : Check the safety working load for hoisting equipment WORK PROCEDURE CHECKING METHOD REMEDIAL MEASURE RESPOSIBILITY Project Manager Engineer Foreman Assistant Foreman Trade Worker Checker Subcon Others 1.When delivery arrives inform the driver where to park the trailer 2.Check the condition of all lifting equipment 3.Mrak a straight line at the center of two sides of the column, to check the alignment after installation. 4.Check that area for lifting is clear 5.Lift the column from the trailer to a location close to the installation position. 6.Insert the lifting pin through the column and lift from its resting position. By visual By visual By theodolite & dumpy level By visual By visual By visual Re- park Re-pair Re-do Clear the area Re-do Re-do F F F F F F C C C C C C P P P P P P File : ST - 07 DISK: SOP A : APPROVE F : CONFIRM P : PERFORM C: CHECK PARK HYATT SAIGON HOTEL PROJECT STANDARD OPERATION PROCEDURE NO SOP –ST – 07 WORK TITLE : Lifting of precast column APPROVED BY : Head, Control Dept CHECKED BY : PROJECT MANAGER REVISION : A EFFECTIVE DATA : 18/5/<98 WORK PROCEDURE CHECKING METHOD REMEDIAL MEASURE RESPOSIBILITY Project Manager Engineer Foreman Assistant Foreman Trade Worker Checker Subcon Others 7.The column is then hoisted slowly to upright position and raised above the right of the starter bars 8.Lower the column down so that starter bars slot neatly into the correct ducts <9.The column is then lowered to its seated position with the aid of slim plates to adjust the level ensure that the base of the column is seated on the slim plates and there are no obstructions. 10. Props ate then secured and fastened both to the column and floor 11.Crane is released to pick the next column By visual By visual Dumpy level By visual By visual Re- do Re-do Re-adjust Re-do Re-do F F F F F F C C C C C C P P P P P P File : ST - 07 DISK: SOP A : APPROVE F : CONFIRM P : PERFORM C: CHECK PARK HYATT SAIGON HOTEL PROJECT STANDARD OPERATION PROCEDURE NO SOP –ST – 08 WORK TITLE : Grouting to precast items APPROVED BY : Head, Control Dept CHECKED BY : PROJECT MANAGER REVISION : A EFFECTIVE DATA : 18/5/<98 WORKMANSHIP STANDARD : ACCEPTANCE /REJECTION CRITERIA To comply with specification REFERENCE STANDARDS/ CODES & QUALITY PLAN : To comply with specialist requirement FACILITIES /INSPECTION INSTRUMENT : Gout mixer/stirrer . pail , measurement jug ENVIRNMENT CONTROLS : NA NECESSARY RECOR NA FREQUENCY : Every inspection SPECIAL REQUIREMENTS : NA SAFETY & HEALTH REQUIREMENTS : NA WORK PROCEDURE CHECKING METHOD REMEDIAL MEASURE RESPOSIBILITY Project Manager Engineer Foreman Assistant Foreman Trade Worker Checker Subcon Others 1.Ensure firstly that the base of the column is cleat , free from dirt and debris 2.Check that the grouting sleeve is clear 3.The base of the column is then seated off and formed up by means of timber formwork 4.Grout mixer /stirrer , pail, measuring jug to be made available 5.The grouting is then mixed by pouring the measured volume of water with a stirrer 6.After mixing is completed , pour/pump into the grouting holes of the column By visual By visual By visual Measure by visual By visual By visual Check debris Clear debris Re –seal up Get ready Re –do Re-do F F F F F F C C C C C C P P P P P P File : ST – 08 DISK: SOP A : APPROVE F : CONFIRM P : PERFORM C: CHECK PARK HYATT SAIGON HOTEL PROJECT STANDARD OPERATION PROCEDURE NO SOP –ST – 08 WORK TITLE : Grouting to precast items APPROVED BY : Head, Control Dept CHECKED BY : PROJECT MANAGER REVISION : A EFFECTIVE DATA : 18/5/<98 WORK PROCEDURE CHECKING METHOD REMEDIAL MEASURE RESPOSIBILITY Project Manager Engineer Foreman Assistant Foreman Trade Worker Checker Subcon Others 7. After 24 hours props can be released By visual NA F C P File : ST – 08 DISK: SOP A : APPROVE F : CONFIRM P : PERFORM C: CHECK
/
本文档为【新加坡金字塔公司项目管理模式英文版&#40;4&#41;】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索