为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

捷达ABS灯亮的几种维修方法

2017-11-15 20页 doc 319KB 102阅读

用户头像

is_180829

暂无简介

举报
捷达ABS灯亮的几种维修方法捷达ABS灯亮的几种维修方法 很多大众车的ABS泵用不了多少年就会警告灯常亮,虽然有传感器脏、线束插头不可靠等各种情况,比较常见的是泵电机插座开焊。 一般4s店的处理方法就是总成更换,价格要小三千块吧,外面也有很多修泵的,说白了也是打开给焊上再把壳子封回去,在其它几个论坛聊过这事,报价也不便宜,为其原因答曰需更换刹车油,加上工时怎么也得几百。 最近帮两个朋友修泵费用很低,即便不是自己DIY也就只有工时费,至于工时费多少就看商家了,但至少不必更换刹车油,想必费用一定会低些。下面组图是拆卸和维修的全过程。 拆卸冷却液储液罐...
捷达ABS灯亮的几种维修方法
捷达ABS灯亮的几种维修方法 很多大众车的ABS泵用不了多少年就会警告灯常亮,虽然有传感器脏、线束插头不可靠等各种情况,比较常见的是泵电机插座开焊。 一般4s店的处理方法就是总成更换,价格要小三千块吧,外面也有很多修泵的,说白了也是打开给焊上再把壳子封回去,在其它几个论坛聊过这事,报价也不便宜,为其原因答曰需更换刹车油,加上工时怎么也得几百。 最近帮两个朋友修泵费用很低,即便不是自己DIY也就只有工时费,至于工时费多少就看商家了,但至少不必更换刹车油,想必费用一定会低些。下面组图是拆卸和维修的全过程。 拆卸冷却液储液罐。 a special tool to measure half a point the rotor shaft runout and simultaneous measurement of two coupling flutter testing, it should meet the requirements. Install the coupling housings to ensure embedded rotor coupling within a concave shoulder, and rotor clearance meets the design requirements. 6.4, 6, wearing construction technology of generator rotors demonstration 6.4.6.1 construction preparation and conditions through the stator before loading check and confirm to confirm air tightness test of the stator and stator mechanical, electrical, instrumentation and control and other related work had been completed. Internal cleaning of stator, high power vacuum the surface of the stator. Stator and rotor magnetic Center drainage is complete. In conjunction with the quality, mechanical, electrical and other relevant persons to finally cleaning check the stator, which is clean and free of any debris. Worn rotors check and confirm confirm before loading the rotor air tightness test, electrical test work has been completed. In conjunction with the quality, mechanical, electrical and other relevant persons to finally clean the rotors checked, its interior is clean and free of any debris. By quality, mechanical, electrical and other professionals to conduct an examination of the rotor, confirm the wear condition of the rotor. Special equipment inspection and rotor through the preparation tool before loading inventory, check to confirm that it appears intact, complete tool, tools required for use of wire rope that has a factory certificate and test report; wire rope should select the safety factor ? 6; hoist testing qualified; road have been equipment authorized Visa temporary support ties should be a hardwood. Ends bearing end cover with connection of the stator plate or gourds by exclusive lug on the end face of a temporary low-hanging on the 分别拔掉ABS线束插头和泵电机插头。 ty, mechanical, electrical and other professionals to conduct an examination of the rotor, confirm the wear condition of the quali , electrical and other relevant persons to finally clean the rotors checked, its interior is clean and free of any debris. Byre loading the rotor air tightness test, electrical test work has been completed. In conjunction with the quality, mechanicalm befoant persons to finally cleaning check the stator, which is clean and free of any debris. Worn rotors check and confirm confirtator and rotor magnetic Center drainage is complete. In conjunction with the quality, mechanical, electrical and other relevor. Sand control and other related work had been completed. Internal cleaning of stator, high power vacuum the surface of the stat fore loading check and confirm to confirm air tightness test of the stator and stator mechanical, electrical, instrumentationor beng construction technology of generator rotors demonstration 6.4.6.1 construction preparation and conditions through the statto ensure embedded rotor coupling within a concave shoulder, and rotor clearance meets the design requirements. 6.4, 6, weari t should meet the requirements. Install the coupling housingsa special tool to measure half a point the rotor shaft runout and simultaneous measurement of two coupling flutter testing, ihanging on the-ary lowa hardwood. Ends bearing end cover with connection of the stator plate or gourds by exclusive lug on the end face of a temporld be d select the safety factor ? 6; hoist testing qualified; road have been equipment authorized Visa temporary support ties shours intact, complete tool, tools required for use of wire rope that has a factory certificate and test report; wire rope shoulappea rotor. Special equipment inspection and rotor through the preparation tool before loading inventory, check to confirm that it- 2 - 松开三个将ABS泵总成固定在支架上的螺丝。 hanging on the-ith connection of the stator plate or gourds by exclusive lug on the end face of a temporary lowing qualified; road have been equipment authorized Visa temporary support ties should be a hardwood. Ends bearing end cover wt testired for use of wire rope that has a factory certificate and test report; wire rope should select the safety factor ? 6; hoistor through the preparation tool before loading inventory, check to confirm that it appears intact, complete tool, tools reqund roprofessionals to conduct an examination of the rotor, confirm the wear condition of the rotor. Special equipment inspection afinally clean the rotors checked, its interior is clean and free of any debris. By quality, mechanical, electrical and other ons toest, electrical test work has been completed. In conjunction with the quality, mechanical, electrical and other relevant persstator, which is clean and free of any debris. Worn rotors check and confirm confirm before loading the rotor air tightness tk the nage is complete. In conjunction with the quality, mechanical, electrical and other relevant persons to finally cleaning checen completed. Internal cleaning of stator, high power vacuum the surface of the stator. Stator and rotor magnetic Center draihad benfirm air tightness test of the stator and stator mechanical, electrical, instrumentation and control and other related work otors demonstration 6.4.6.1 construction preparation and conditions through the stator before loading check and confirm to cotor rthin a concave shoulder, and rotor clearance meets the design requirements. 6.4, 6, wearing construction technology of generacoupling flutter testing, it should meet the requirements. Install the coupling housings to ensure embedded rotor coupling wi a special tool to measure half a point the rotor shaft runout and simultaneous measurement of two- 3 - 慢慢翻转泵总成。注意:不要让铜质制动油管过分变形。刹车油管是铜质金属罐,有一定的变形量和可塑性,只要不出死弯不会有任何不良影响,但这个步骤需要工人细心一点。分别在两个厂子让工人拆都没出现任何问,可见难度不大。 ty, mechanical, electrical and other professionals to conduct an examination of the rotor, confirm the wear condition of the quali , electrical and other relevant persons to finally clean the rotors checked, its interior is clean and free of any debris. Byre loading the rotor air tightness test, electrical test work has been completed. In conjunction with the quality, mechanicalm befoant persons to finally cleaning check the stator, which is clean and free of any debris. Worn rotors check and confirm confirtator and rotor magnetic Center drainage is complete. In conjunction with the quality, mechanical, electrical and other relevor. Sand control and other related work had been completed. Internal cleaning of stator, high power vacuum the surface of the stat fore loading check and confirm to confirm air tightness test of the stator and stator mechanical, electrical, instrumentationor beng construction technology of generator rotors demonstration 6.4.6.1 construction preparation and conditions through the statto ensure embedded rotor coupling within a concave shoulder, and rotor clearance meets the design requirements. 6.4, 6, weari t should meet the requirements. Install the coupling housingsa special tool to measure half a point the rotor shaft runout and simultaneous measurement of two coupling flutter testing, ihanging on the-ary lowa hardwood. Ends bearing end cover with connection of the stator plate or gourds by exclusive lug on the end face of a temporld be d select the safety factor ? 6; hoist testing qualified; road have been equipment authorized Visa temporary support ties shours intact, complete tool, tools required for use of wire rope that has a factory certificate and test report; wire rope shoulappea rotor. Special equipment inspection and rotor through the preparation tool before loading inventory, check to confirm that it- 4 - 连接ABS泵总成的几根刹车油管。 hanging on the-ith connection of the stator plate or gourds by exclusive lug on the end face of a temporary lowing qualified; road have been equipment authorized Visa temporary support ties should be a hardwood. Ends bearing end cover wt testired for use of wire rope that has a factory certificate and test report; wire rope should select the safety factor ? 6; hoistor through the preparation tool before loading inventory, check to confirm that it appears intact, complete tool, tools reqund roprofessionals to conduct an examination of the rotor, confirm the wear condition of the rotor. Special equipment inspection afinally clean the rotors checked, its interior is clean and free of any debris. By quality, mechanical, electrical and other ons toest, electrical test work has been completed. In conjunction with the quality, mechanical, electrical and other relevant persstator, which is clean and free of any debris. Worn rotors check and confirm confirm before loading the rotor air tightness tk the nage is complete. In conjunction with the quality, mechanical, electrical and other relevant persons to finally cleaning checen completed. Internal cleaning of stator, high power vacuum the surface of the stator. Stator and rotor magnetic Center draihad benfirm air tightness test of the stator and stator mechanical, electrical, instrumentation and control and other related work otors demonstration 6.4.6.1 construction preparation and conditions through the stator before loading check and confirm to cotor rthin a concave shoulder, and rotor clearance meets the design requirements. 6.4, 6, wearing construction technology of generacoupling flutter testing, it should meet the requirements. Install the coupling housings to ensure embedded rotor coupling wi a special tool to measure half a point the rotor shaft runout and simultaneous measurement of two- 5 - 拆卸掉后边这四根螺丝。这四根螺丝是六花螺丝,需要专门的套筒工具,具体多大号忘记了。拆的时候要慢点使劲,因为螺丝的头不是公制,一般的套筒总是稍微有点不合适,突然且猛力用力会令起滑扣,那样再拆就麻烦了。 a hardwood. Ends bearing end cover with connection of the stator plate or gourds by exclusive lug on the end face of a temporld be d select the safety factor ? 6; hoist testing qualified; road have been equipment authorized Visa temporary support ties shours intact, complete tool, tools required for use of wire rope that has a factory certificate and test report; wire rope shoulappea rotor. Special equipment inspection and rotor through the preparation tool before loading inventory, check to confirm that itty, mechanical, electrical and other professionals to conduct an examination of the rotor, confirm the wear condition of the quali , electrical and other relevant persons to finally clean the rotors checked, its interior is clean and free of any debris. Byre loading the rotor air tightness test, electrical test work has been completed. In conjunction with the quality, mechanicalm befoant persons to finally cleaning check the stator, which is clean and free of any debris. Worn rotors check and confirm confirtator and rotor magnetic Center drainage is complete. In conjunction with the quality, mechanical, electrical and other relevor. Sand control and other related work had been completed. Internal cleaning of stator, high power vacuum the surface of the stat fore loading check and confirm to confirm air tightness test of the stator and stator mechanical, electrical, instrumentationor beng construction technology of generator rotors demonstration 6.4.6.1 construction preparation and conditions through the statto ensure embedded rotor coupling within a concave shoulder, and rotor clearance meets the design requirements. 6.4, 6, weari t should meet the requirements. Install the coupling housingsa special tool to measure half a point the rotor shaft runout and simultaneous measurement of two coupling flutter testing, ihanging on the-ary low- 6 - 取下螺丝后双手反向用力将泵体和控制盒分离。 拆开后的泵体和控制盒。 professionals to conduct an examination of the rotor, confirm the wear condition of the rotor. Special equipment inspection afinally clean the rotors checked, its interior is clean and free of any debris. By quality, mechanical, electrical and other ons toest, electrical test work has been completed. In conjunction with the quality, mechanical, electrical and other relevant persstator, which is clean and free of any debris. Worn rotors check and confirm confirm before loading the rotor air tightness tk the nage is complete. In conjunction with the quality, mechanical, electrical and other relevant persons to finally cleaning checen completed. Internal cleaning of stator, high power vacuum the surface of the stator. Stator and rotor magnetic Center draihad benfirm air tightness test of the stator and stator mechanical, electrical, instrumentation and control and other related work otors demonstration 6.4.6.1 construction preparation and conditions through the stator before loading check and confirm to cotor rthin a concave shoulder, and rotor clearance meets the design requirements. 6.4, 6, wearing construction technology of generacoupling flutter testing, it should meet the requirements. Install the coupling housings to ensure embedded rotor coupling wi a special tool to measure half a point the rotor shaft runout and simultaneous measurement of twohanging on the-ith connection of the stator plate or gourds by exclusive lug on the end face of a temporary lowing qualified; road have been equipment authorized Visa temporary support ties should be a hardwood. Ends bearing end cover wt testired for use of wire rope that has a factory certificate and test report; wire rope should select the safety factor ? 6; hoistor through the preparation tool before loading inventory, check to confirm that it appears intact, complete tool, tools reqund ro- 7 - 图中两个插脚的插座就是ABS泵电机插座。 ty, mechanical, electrical and other professionals to conduct an examination of the rotor, confirm the wear condition of the quali , electrical and other relevant persons to finally clean the rotors checked, its interior is clean and free of any debris. Byre loading the rotor air tightness test, electrical test work has been completed. In conjunction with the quality, mechanicalm befoant persons to finally cleaning check the stator, which is clean and free of any debris. Worn rotors check and confirm confirtator and rotor magnetic Center drainage is complete. In conjunction with the quality, mechanical, electrical and other relevor. Sand control and other related work had been completed. Internal cleaning of stator, high power vacuum the surface of the stat fore loading check and confirm to confirm air tightness test of the stator and stator mechanical, electrical, instrumentationor beng construction technology of generator rotors demonstration 6.4.6.1 construction preparation and conditions through the statto ensure embedded rotor coupling within a concave shoulder, and rotor clearance meets the design requirements. 6.4, 6, weari t should meet the requirements. Install the coupling housingsa special tool to measure half a point the rotor shaft runout and simultaneous measurement of two coupling flutter testing, ihanging on the-ary lowa hardwood. Ends bearing end cover with connection of the stator plate or gourds by exclusive lug on the end face of a temporld be d select the safety factor ? 6; hoist testing qualified; road have been equipment authorized Visa temporary support ties shours intact, complete tool, tools required for use of wire rope that has a factory certificate and test report; wire rope shoulappea rotor. Special equipment inspection and rotor through the preparation tool before loading inventory, check to confirm that it- 8 - 控制电路盒背面,ATE的产品,右下角是锯开的小口,对应前面插ABS泵电机的插座。这种开法对泵损 失最小。开口时主意别下家伙太狠,伤到线路板或者电子元件就不值了。 nd roprofessionals to conduct an examination of the rotor, confirm the wear condition of the rotor. Special equipment inspection afinally clean the rotors checked, its interior is clean and free of any debris. By quality, mechanical, electrical and other ons toest, electrical test work has been completed. In conjunction with the quality, mechanical, electrical and other relevant persstator, which is clean and free of any debris. Worn rotors check and confirm confirm before loading the rotor air tightness tk the nage is complete. In conjunction with the quality, mechanical, electrical and other relevant persons to finally cleaning checen completed. Internal cleaning of stator, high power vacuum the surface of the stator. Stator and rotor magnetic Center draihad benfirm air tightness test of the stator and stator mechanical, electrical, instrumentation and control and other related work otors demonstration 6.4.6.1 construction preparation and conditions through the stator before loading check and confirm to cotor rthin a concave shoulder, and rotor clearance meets the design requirements. 6.4, 6, wearing construction technology of generacoupling flutter testing, it should meet the requirements. Install the coupling housings to ensure embedded rotor coupling wi a special tool to measure half a point the rotor shaft runout and simultaneous measurement of twohanging on the-ith connection of the stator plate or gourds by exclusive lug on the end face of a temporary lowing qualified; road have been equipment authorized Visa temporary support ties should be a hardwood. Ends bearing end cover wt testired for use of wire rope that has a factory certificate and test report; wire rope should select the safety factor ? 6; hoistor through the preparation tool before loading inventory, check to confirm that it appears intact, complete tool, tools requ- 9 - 就是这两个焊点惹的祸~仔细看那道细细的裂纹,这个车不严重,只偶尔报V64错,ABS灯还不是常亮。 另一台常亮车的泵脱焊现象很严重。 rotor. Special equipment inspection and rotor through the preparation tool before loading inventory, check to confirm that itty, mechanical, electrical and other professionals to conduct an examination of the rotor, confirm the wear condition of the quali , electrical and other relevant persons to finally clean the rotors checked, its interior is clean and free of any debris. Byre loading the rotor air tightness test, electrical test work has been completed. In conjunction with the quality, mechanicalm befoant persons to finally cleaning check the stator, which is clean and free of any debris. Worn rotors check and confirm confirtator and rotor magnetic Center drainage is complete. In conjunction with the quality, mechanical, electrical and other relevor. Sand control and other related work had been completed. Internal cleaning of stator, high power vacuum the surface of the stat fore loading check and confirm to confirm air tightness test of the stator and stator mechanical, electrical, instrumentationor beng construction technology of generator rotors demonstration 6.4.6.1 construction preparation and conditions through the statto ensure embedded rotor coupling within a concave shoulder, and rotor clearance meets the design requirements. 6.4, 6, weari t should meet the requirements. Install the coupling housingsa special tool to measure half a point the rotor shaft runout and simultaneous measurement of two coupling flutter testing, ihanging on the-ary lowa hardwood. Ends bearing end cover with connection of the stator plate or gourds by exclusive lug on the end face of a temporld be d select the safety factor ? 6; hoist testing qualified; road have been equipment authorized Visa temporary support ties shours intact, complete tool, tools required for use of wire rope that has a factory certificate and test report; wire rope shoulappea- 10 - 用焊锡和烙铁焊上。这次去的厂子没准备特好的焊锡,一般的焊锡含铅量大比较淬,如果有可能,弄点专 用焊锡就更好了。 -ith connection of the stator plate or gourds by exclusive lug on the end face of a temporary lowing qualified; road have been equipment authorized Visa temporary support ties should be a hardwood. Ends bearing end cover wt testired for use of wire rope that has a factory certificate and test report; wire rope should select the safety factor ? 6; hoistor through the preparation tool before loading inventory, check to confirm that it appears intact, complete tool, tools reqund roprofessionals to conduct an examination of the rotor, confirm the wear condition of the rotor. Special equipment inspection afinally clean the rotors checked, its interior is clean and free of any debris. By quality, mechanical, electrical and other ons toest, electrical test work has been completed. In conjunction with the quality, mechanical, electrical and other relevant persstator, which is clean and free of any debris. Worn rotors check and confirm confirm before loading the rotor air tightness tk the nage is complete. In conjunction with the quality, mechanical, electrical and other relevant persons to finally cleaning checen completed. Internal cleaning of stator, high power vacuum the surface of the stator. Stator and rotor magnetic Center draihad benfirm air tightness test of the stator and stator mechanical, electrical, instrumentation and control and other related work otors demonstration 6.4.6.1 construction preparation and conditions through the stator before loading check and confirm to cotor rthin a concave shoulder, and rotor clearance meets the design requirements. 6.4, 6, wearing construction technology of generacoupling flutter testing, it should meet the requirements. Install the coupling housings to ensure embedded rotor coupling wi a special tool to measure half a point the rotor shaft runout and simultaneous measurement of twohanging on the- 11 - 焊好后把刚才锯开的那一小块盖子用AB胶粘回去,外面再抹一层玻璃胶,等凝固后装回去,然后用 V.A.G1552或者5051或者其它电脑进入刹车系统把故障码清除就行了。 appea rotor. Special equipment inspection and rotor through the preparation tool before loading inventory, check to confirm that itty, mechanical, electrical and other professionals to conduct an examination of the rotor, confirm the wear condition of the quali , electrical and other relevant persons to finally clean the rotors checked, its interior is clean and free of any debris. Byre loading the rotor air tightness test, electrical test work has been completed. In conjunction with the quality, mechanicalm befoant persons to finally cleaning check the stator, which is clean and free of any debris. Worn rotors check and confirm confirtator and rotor magnetic Center drainage is complete. In conjunction with the quality, mechanical, electrical and other relevor. Sand control and other related work had been completed. Internal cleaning of stator, high power vacuum the surface of the stat fore loading check and confirm to confirm air tightness test of the stator and stator mechanical, electrical, instrumentationor beng construction technology of generator rotors demonstration 6.4.6.1 construction preparation and conditions through the statto ensure embedded rotor coupling within a concave shoulder, and rotor clearance meets the design requirements. 6.4, 6, weari t should meet the requirements. Install the coupling housingsa special tool to measure half a point the rotor shaft runout and simultaneous measurement of two coupling flutter testing, ihanging on the-ary lowa hardwood. Ends bearing end cover with connection of the stator plate or gourds by exclusive lug on the end face of a temporld be d select the safety factor ? 6; hoist testing qualified; road have been equipment authorized Visa temporary support ties shours intact, complete tool, tools required for use of wire rope that has a factory certificate and test report; wire rope shoul- 12 -
/
本文档为【捷达ABS灯亮的几种维修方法】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索