为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

婴儿食谱蛋黄泥

2017-12-27 50页 doc 158KB 14阅读

用户头像

is_196623

暂无简介

举报
婴儿食谱蛋黄泥婴儿食谱蛋黄泥 temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set ...
婴儿食谱蛋黄泥
婴儿食谱蛋黄泥 temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 婴儿食谱蛋黄泥 主料:鸡蛋35克 调料:盐1克 制作: 将鸡蛋洗净,放锅中煮熟,剥去蛋壳,除去蛋白,取其蛋黄,加入开水少许,用匙搅烂即成,也可将蛋黄泥用牛奶,米汤,菜水等调成糊状,即可食用。 制作提示: 此菜在制作时要注意:选择鲜蛋做原料,煮时要凉水下锅,这样不易煮坯,煮好后立刻用凉水浸泡一下,这样易去壳。 食用方法: 适合做为早餐、中餐、晚餐、零食食用。 相关人群: 适宜,个月以上的婴儿食用。 健康提示: 这道菜软烂适口,微咸,营养丰富,喂给婴儿既可营养大脑,又可满足婴儿对铁质的需要。 食谱营养: 鸡蛋:鸡蛋含有丰富的蛋白质、脂肪、维生素和铁、钙、钾等人体所需要的矿物质,其蛋白质是自然界最优良的蛋白质,对肝脏组织损伤有修复作用;同时富含DHA和卵磷脂、卵黄素,对神经系统和身体发育有利,能健脑益智,改善记忆力,并促进肝细胞再生;鸡蛋中含有较多的维生素B和其他微量元素,可以分解和氧化人体内的致癌物质,具有防癌作用;鸡蛋味甘,性平;具有养心安神,补血,滋阴润燥之功效。 温馨提示: 鸡蛋:鸡蛋不宜与糖同煮;与糖精、红糖同食会中毒;与鹅肉同食损伤脾胃;与兔肉、柿子同食导致腹泻;同时不宜与甲鱼、鲤鱼、豆浆、茶同食。 红薯鸡蛋粥 原料:红薯--1/6块,鸡蛋--1个,牛奶--2大匙 制法: :1: 将红薯去皮,炖烂,并捣成泥状。 :2: 将鸡蛋煮熟之后把蛋黄捣碎。 :3: 红薯泥加牛奶用文火煮,并不时地搅动。 :4: 粘稠时放入蛋黄,搅匀。 胡萝卜粥 原料:准备胡萝卜(红萝卜)适量 制作:把胡萝卜洗净去除根须放入蒸锅内上米蒸熟蒸烂取出晾凉捣烂成泥如果小孩喜吃甜食也可稍加白糖 特点:清香适口胡萝卜味甘性平有健脾助消化之功并含有胡萝卜素B族维生素脂肪糖类其中含大量果胶有收敛和吸附作用患儿腹泻食用后可以抑制肠道蠕动对抑制消化不良所引起的腹泻非常合适 proof, Sun protection measures. Piling piling machinery, machinery,-proof, shock-otection CAP, explosion; Leakage protection meet the grade requirements. Check date 8 cylinder gas bottles are clearly marked, there was shock, prsheathed cable, length should not be less than 15m, may not withstand external force-good, shell the zero connection protection effective; Motor load lines shall be YHS waterproof rubber-ds for outdoor job settings. Check date 7 pump power cable insulationin sheable mechanical transmission parts randomly switches push button should be used; Neutral or ground meets the requirements, raed 30m, welder power supply be used moving boxes. Inspection date II serial number check check check 6 steel shields and relit exceng line, and well insulated, installed correctly, a power supply line length does not exceed 5M, two times the length does noice effectively; Reliable rain protection measures, protective covers to complete the access line and set a reasonable; Weldion devlding machine zero connection protection, leakage protection devices complete, secondary no load pressure or leakage protectitype ramming hand should be wrapped on insulating materials, the operator should wear insulating gloves. Inspection date 5 we-Frogprotection is good; Grinding stone electric overhead lines, the operator should wear insulated shoes, wear insulated gloves; s may not be damaged; Earth leakage protective device shall be mounted correctly and sensitive and effective and ground faultheld electric motor operated tools are complete and valid, and the rubber line-zero connection protection is good. Shield inspection date 4 hand-way push switches; Leakage protection sensitive effective ground-on parts guards firmly; Operations must be onesmissiInspection date 3 chain saws (circular saws), guard, safety devices and Crescent shield meets the requirements; Complete tranafety device; Leakage protection sensitive and effective, grounded or the zero connection protection meets the requirements. back s-e cover. For outdoor use, to shed rain operation; Plane blade with protective hand guard, rolling plane equipped with spring; Mortar machine handles application disc. Inspection date 2 wood (pressure) exposed part of the plane must have a protectivvalidee times; Hopper safety chains, hooks, and lever safety devices are complete and valid; Protective cover, cover complete and measures protection from transmission parts, clutches, brakes and other compliance, hopper wire rope must remain at least thr inageents, leakage protection is sensitive and reliable; Rain requires for operation shed meet, hanging for safe operation and draproject 1 mixer body with mortar installation smooth and solid, grounded or the zero connection protection meets the requirem 16 organization name project name Inspector serial number check check check the comments on the contents of the-bar 50mm, shall not be located in the same room. Wooden long according to the design you want to ... An 5 - 2 - temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 鸡肝胡萝卜粥 原料:鸡肝2个,胡萝卜10克,大米50克,高汤4杯,盐少许。 做法:饭加入高汤,小火慢熬成粥状。鸡肝及胡萝卜洗净后,蒸熟捣成泥,加入粥内,加盐少许,煮熟即可。 tips:鸡肝含有丰富的蛋白质、钙、磷、铁、锌、维生素A、B族维生素。肝中铁质丰富,是补血食品中最常用的食物。动物肝中维生素A的含量远远超过奶、蛋、肉、鱼等食品,具有维持正常生长和生殖机能的作用,能保护眼睛,维持正常视力,防止眼睛干涩、疲劳,维持健康的肤色,对皮肤的健美具有重要意义。 功效:本款菜谱适合4个月以上的婴儿试用,可以补钙、补锌、补维生素A的最佳食谱。 鱼粥 [原料]:大米150克,鲈鱼:或其它多肉少刺的鱼:一条,高汤4杯。 [做法]:米加入高汤,小火慢熬成粥状。鱼整条蒸熟去骨,挑出适量鱼肉切碎,拌入粥中,加入少许盐,熬5分钟即可。 婴儿果水制作方法 [编者按]小宝宝一天天长大了,母乳已经不再是他全部的食物,需要给他各种滋味让他去品尝,去探索味道的奥秘。下面介绍几种果水的制作方法: 橘子汁:取橘子,个,将外皮洗净,切成两半;将每半只置于挤汁器盘上旋转几次,果汁即可流入槽内,过滤后即成。每个橘子约得果汁,,毫升,饮用时可加水,倍。 番茄汁:番茄,,克,白糖少许,温开水适量。将成熟的番茄洗净,用开水烫软去皮,然后切碎,用清洁的双层纱布包好,把番茄汁挤入小盆内。将白糖放入汁中,用温开水冲调后即可饮用。注意要选用新鲜、成熟的番茄。 青菜水:青菜,,克:菠菜、油菜、白菜均可:,清水,,克。将菜洗净,切碎。将锅放在火上,水烧沸,放入碎菜,盖好锅盖烧开煮,,,分钟,锅离火,再焖,,分钟,滤去菜渣留汤即可。 西瓜汁:西瓜瓤,,,克,白糖,,克。将西瓜瓤放入碗内,用匙捣烂,再用纱布过滤。汁内加入白糖,调匀即成。 胡萝卜汤:胡萝卜,,克,白糖少许,清水,,克。将胡萝卜洗净,切碎,放入锅内,加入水,上火煮沸约,分钟。用纱布过滤去渣,加入白糖,调匀。 山楂水:山楂水,,克,白糖少许,开水,,,克。将山楂片用凉水快速洗净,除去浮灰,放入盆内。将开水沏入盆内,盖上盖焖,,分钟,至水温下降到微温时,把山楂水盛入杯中,加入白糖,搅至白糖溶解即可。 中期简易辅食食谱:7-9个月: 1、可以开始添加含蛋白质的食物了,如蛋黄、鱼、肉、豆腐等。切记:此时不能喂蛋白,以免造成宝宝过敏。 e staggered, long barl scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should bizontan m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for hortion design requirement, do not use bricks blocked up by construction organization design requirements, support height () whenstruc5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the cod easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.down material full 2 support material support column material: wood Rod application pine or FIR, shall not use-down, low-curity lowruction programme programme full, support system design calculation, and approval procedures complete, job Qian should for se6 serial number check project check requirements behave records results 1 const-test State observer records form template project name: construction site: construction: support materials: Ann 5-Engineering formwork supporting system self today this this this this cumulation Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) ar month day year month 2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day ye-5-round. 6 electric ... Project name: 5mounted on scaffolding or tree branch; Overhead lines required high enough off the g voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be-ing is strictly prohibited. 5 to set up lown heatibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsteighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohing wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lheld lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Light-tective casing. 4 spot lights handup proburied lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set revent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct to pto be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm line protection near power lines to have a reliable protectivetemporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage - 3 - temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 2、食物的形态可从汤汁或糊状,渐渐转变为泥状或固体。 3、五谷根茎类的食物种类,可以增加稀饭、面条、土司面包、馒头等。 4、纤维较粗的蔬果和太油腻、辛辣刺激或筋太多的食物,仍然不适合喂宝宝吃。 5、喂食前,先试试食物的温度,别烫着宝宝了。 每日建议食用量 食物类别 食物名称 一天食用量 一份食物的量 鱼肉豆蛋类 蛋黄泥、豆腐或豆浆、 由右列食物中任选 蛋黄泥一天不超过1个 鱼、肉 1-1.5份 豆腐1块、豆浆1杯 肝泥鱼松或肉松 鱼、肉、肝泥2汤匙 鱼松或肉松2汤匙 五谷根蒸类 米糊或麦糊、馒头 由右列食物中 米糊或麦糊1碗 土司面包、稀饭 任选2.5-4份 中馒头1/3个、土司面包1片 面条或面线 稀饭1/2碗、面条1/2碗 蔬菜类 胡萝卜、菠菜、空心菜、 1-2汤匙 碗豆等菜汤或菜泥 水果类 橘子、柳丁、苹果、香瓜、 1-2汤匙 木瓜、葡萄等果汁或果泥 五谷根茎类简易制作 米糊——将米粉加入奶水或开水调成糊状即可。 面包、馒头——可撕成长条状,让长牙的宝宝用手拿着吃;或去掉硬皮,撕成小块泡在牛奶中喂宝宝吃。 稀饭——白米加入7或8倍体积的水,以小火慢煮成浓粥或薄粥。注意放凉后再喂食。 中期简易辅食食谱 肝泥粥 材料:鸡肝——20g 米——20g 水——1.5杯 做法: 1、鸡肝去膜、去筋、剁碎成泥状备用。 2、米加水煮开后,改开小火,加盖焖煮至烂,拌入肝泥,再煮开即可。 proof, Sun protection measures. Piling piling machinery, machinery,-proof, shock-otection CAP, explosion; Leakage protection meet the grade requirements. Check date 8 cylinder gas bottles are clearly marked, there was shock, prsheathed cable, length should not be less than 15m, may not withstand external force-good, shell the zero connection protection effective; Motor load lines shall be YHS waterproof rubberents, leakage protection is sensitive and reliable; Rain requires for operation shed meet, hanging for safe operation and dra-ds for outdoor job settings. Check date 7 pump power cable insulationin sheable mechanical transmission parts randomly switches push button should be used; Neutral or ground meets the requirements, raed 30m, welder power supply be used moving boxes. Inspection date II serial number check check check 6 steel shields and relit exceng line, and well insulated, installed correctly, a power supply line length does not exceed 5M, two times the length does noice effectively; Reliable rain protection measures, protective covers to complete the access line and set a reasonable; Weldion devproject 1 mixer body with mortar installation smooth and solid, grounded or the zero connection protection meets the requiremlding machine zero connection protection, leakage protection devices complete, secondary no load pressure or leakage protectitype ramming hand should be wrapped on insulating materials, the operator should wear insulating gloves. Inspection date 5 we-Frogprotection is good; Grinding stone electric overhead lines, the operator should wear insulated shoes, wear insulated gloves; s may not be damaged; Earth leakage protective device shall be mounted correctly and sensitive and effective and ground faultheld electric motor operated tools are complete and valid, and the rubber line-zero connection protection is good. Shield inspection date 4 hand -way push switches; Leakage protection sensitive effective ground-on parts guards firmly; Operations must be onesmissiInspection date 3 chain saws (circular saws), guard, safety devices and Crescent shield meets the requirements; Complete tranafety device; Leakage protection sensitive and effective, grounded or the zero connection protection meets the requirements. back s-e cover. For outdoor use, to shed rain operation; Plane blade with protective hand guard, rolling plane equipped with spring; Mortar machine handles application disc. Inspection date 2 wood (pressure) exposed part of the plane must have a protectiv16 organization name project name Inspector serial number check check check the comments on the contents of thevalidee times; Hopper safety chains, hooks, and lever safety devices are complete and valid; Protective cover, cover complete and measures protection from transmission parts, clutches, brakes and other compliance, hopper wire rope must remain at least thr inage-bar 50mm, shall not be located in the same room. Wooden long according to the design you want to ... An 5 - 4 - temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 小鱼蛋花粥 材料:白饭——1/2碗 水——1杯 吻仔鱼——10g 蛋黄——1/2个 做法: 1、将白饭与水放入小锅煮至烂。 2、取吻仔鱼放入锅中小煮一下,将蛋黄打散淋在粥上,搅拌至熟即可。 蔬菜豆腐泥 材料:去皮红萝卜——5g 嫩豆腐——1/6块 豌豆——1/2条 蛋黄——1/2个 水——1/2杯 酱油——少许 做法: 1、将去皮红萝卜及豌豆烫熟后切成极小块。 2、将水与:1:料放入小锅,嫩豆腐边捣碎边加进去,加少许酱油,煮到汤汁变少。 3、最后将蛋黄打散加入锅里煮熟即可。 后期简易辅食食谱:10-12个月: 1、可尝试全蛋、干饭了。 2、可让宝宝开始学习自己进食,所以,帮宝宝选择不易摔破、质地轻、容易使用的汤匙、碗、盘等餐具, 是父母该准备的功课。 每日建议食用量 食物类别 食物名称 一天食用量 一份食物的量 鱼肉豆蛋类 蒸全蛋、豆腐或豆浆、 由右列食物中任选 蛋黄泥一天不超过1个 鱼、肉 1-1.5份 豆腐1块、豆浆1杯 肝泥鱼松或肉松 鱼、肉、肝泥2汤匙 鱼松或肉松2汤匙 五谷根蒸类 米糊或麦糊、馒头 由右列食物中 米糊或麦糊1碗 土司面包、稀饭 任选4-6份 中馒头1/3个、土司面包1片 面条或面线、干饭 稀饭1/2碗、面条1/2碗、干饭1/4碗 e staggered, long barl scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should bizontan m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for hortion design requirement, do not use bricks blocked up by construction organization design requirements, support height () whenstruc5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the cod easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.down material full 2 support material support column material: wood Rod application pine or FIR, shall not use -down, low-curity lowruction programme programme full, support system design calculation, and approval procedures complete, job Qian should for se6 serial number check project check requirements behave records results 1 const-test State observer records form template project name: construction site: construction: support materials: Ann 5-measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross armEngineering formwork supporting system self today this this this this cumulation Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) ar month day year month 2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day ye-5- round. 6 electric ... Project name: 5mounted on scaffolding or tree branch; Overhead lines required high enough off the g voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be-ing is strictly prohibited. 5 to set up lown heatibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsteighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohing wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lheld lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lightline protection near power lines to have a reliable protective-tective casing. 4 spot lights handup proburied lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set revent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct to pto be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage - 5 - temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 蔬菜类 胡萝卜、菠菜、空心菜、 2-4汤匙 青江菜等剁碎的蔬菜 水果类 橘子、柳丁、苹果、香瓜、 2-4汤匙 木瓜、葡萄等果汁或果泥 鱼肉豆蛋类简易制作 蛋黄泥——蛋煮熟后只取出蛋黄,用汤匙压碎,加些开水调成糊状。 肉泥——选择筋少的瘦肉,鸡肉、牛肉、猪肉皆可,绞碎后蒸熟即可。 肝泥——鸡肝以汤匙刮碎后蒸熟。 豆腐——蒸过或煮过后即可喂食。 后期简易辅食食谱 甘薯饭 材料:甘薯——30g 吻仔鱼——1/2大匙 绿色蔬菜——少许 饭——2/3碗 水——2-3大匙 做法: 1、甘薯去皮切成0.5cm方块,浸水后用保鲜膜包起来加1大匙水。以微波炉加热约1分钟。 2、吻仔鱼用热水烫过。 3、将饭倒入小锅中,再将水、处理过的甘薯、吻仔鱼及绿色蔬菜放入小锅一起煮熟即可。 蒸嫩丸子 材料:绞肉——60g 青豆仁——10颗 a料——水1匙、太白粉1/2小匙、酱油少许 做法: 1、绞肉剁细,加入煮烂的青豆仁及太白粉拌匀,甩打至有弹性再分搓成一口大小的丸状。以中火蒸1小 时至肉软。 2、以a料勾欠即可。 白玉金银汤 材料:清汤——70ml proof, Sun protection measures. Piling piling machinery, machinery,-proof, shock-otection CAP, explosion; Leakage protection meet the grade requirements. Check date 8 cylinder gas bottles are clearly marked, there was shock, prsheathed cable, length should not be less than 15m, may not withstand external force-good, shell the zero connection protection effective; Motor load lines shall be YHS waterproof rubber--ds for outdoor job settings. Check date 7 pump power cable insulationin sheable mechanical transmission parts randomly switches push button should be used; Neutral or ground meets the requirements, raed 30m, welder power supply be used moving boxes. Inspection date II serial number check check check 6 steel shields and relit exceng line, and well insulated, installed correctly, a power supply line length does not exceed 5M, two times the length does noice effectively; Reliable rain protection measures, protective covers to complete the access line and set a reasonable; Weldion devbar 50mm, shall not be located in the same room. Wooden long according to the design you want to ... An 5lding machine zero connection protection, leakage protection devices complete, secondary no load pressure or leakage protectitype ramming hand should be wrapped on insulating materials, the operator should wear insulating gloves. Inspection date 5 we-Frogprotection is good; Grinding stone electric overhead lines, the operator should wear insulated shoes, wear insulated gloves; s may not be damaged; Earth leakage protective device shall be mounted correctly and sensitive and effective and ground faultheld electric motor operated tools are complete and valid, and the rubber line-zero connection protection is good. Shield inspection date 4 hand-way push switches; Leakage protection sensitive effective ground-on parts guards firmly; Operations must be onesmissiInspection date 3 chain saws (circular saws), guard, safety devices and Crescent shield meets the requirements; Complete tranafety device; Leakage protection sensitive and effective, grounded or the zero connection protection meets the requirements. back s-e cover. For outdoor use, to shed rain operation; Plane blade with protective hand guard, rolling plane equipped with spring; Mortar machine handles application disc. Inspection date 2 wood (pressure) exposed part of the plane must have a protectivvalidee times; Hopper safety chains, hooks, and lever safety devices are complete and valid; Protective cover, cover complete and measures protection from transmission parts, clutches, brakes and other compliance, hopper wire rope must remain at least thr inageents, leakage protection is sensitive and reliable; Rain requires for operation shed meet, hanging for safe operation and draproject 1 mixer body with mortar installation smooth and solid, grounded or the zero connection protection meets the requirem 16 organization name project name Inspector serial number check check check the comments on the contents of the - 6 - temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 香菇丝——1/3朵 豆腐——25g 小鸡丁块——15g 花椰菜——10g 蛋汁——1/4个 做法: 1、清汤煮开后,倒入小鸡丁块、香菇丝煮至熟。 2、豆腐切丁,倒入:1:中,以少许的盐、酱油调味,勾芡煮成稠状。 3、花椰菜汤熟倒入:2:内,淋上蛋汁,熄火。盖上锅盖闷到蛋熟。 初期简易辅食食谱:4-6个月: 1、五谷根茎类食物中,最好先由米糊或麦糊开始喂,当宝宝适应米糊后,再尝试其他的食物。 2、尽可能选用新鲜的蔬菜、水果,制成汤汁、稀释果汁喂宝宝。 3、选择有带皮的水果种类,以及受农药污染与病原感染机会较少的水果,例如:柳丁、橘子、苹果、香蕉、木瓜等。 每日建议食用量 食物类别 食物名称 一天食用量 五谷根茎类 米糊或麦糊 3/4-1碗 蔬菜类 胡萝卜、菠菜等菜汤 1/3-2/3茶匙 水果类 橘子、苹果、葡萄等稀释果汁 1/3-2/3茶匙 蔬菜类简易制作 菜汤——将深绿色、黄红色的蔬菜,例如菠菜、胡萝卜等,洗净、切碎、加少放水煮开,放至稍凉将汤汁倒出即可。 菜泥——选择嫩叶蔬菜如菠菜、青江菜,或纤维少的南瓜、马铃薯等,洗净切小段或小块,加水煮熟后,捞出置于碗中,用汤匙刮下嫩叶或压成泥状即可。 水果类简易制作 果汁——柳丁、橘子;对切成两半后压汁。喂食前加入等量的冷开水稀释。 葡萄、番茄:洗净后以热开水浸泡2分钟,去皮以干净的纱布包起来,用汤匙压出汁。 e staggered, long barl scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should bizontan m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for hortion design requirement, do not use bricks blocked up by construction organization design requirements, support height () whenstruc5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the cod easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.down material full 2 support material support column material: wood Rod application pine or FIR, shall not use-down, low-curity lowruction programme programme full, support system design calculation, and approval procedures complete, job Qian should for se6 serial number check project check requirements behave records results 1 const-test State observer records form template project name: construction site: construction: support materials: Ann 5-Engineering formwork supporting system self today this this this this cumulation Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) ar month day year month 2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day ye-5-round. 6 electric ... Project name: 5mounted on scaffolding or tree branch; Overhead lines required high enough off the g voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be-ing is strictly prohibited. 5 to set up lown heatibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsteighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohing wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lheld lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Light-tective casing. 4 spot lights handup proburied lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set revent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct to pto be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm line protection near power lines to have a reliable protectivetemporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage - 7 - temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 香瓜、西瓜:用汤匙挖出果肉后,以干净纱布包住压汁。 果泥——挑选果肉多、纤维少的水果,例如:香蕉、木瓜、苹果等,洗净去皮后,用汤匙挖出果肉并压成泥状即可。 初期简易辅食食谱 苹果泥 材料:苹果——半个 做法:1、将苹果洗净、去皮、切半。 2、用研磨板磨成泥状,盛在碗中即可。 蔬菜泥 材料:绿色蔬菜——10克 牛奶——2汤匙 玉米粉——1/5-1/4小匙 做法:1、将绿色蔬菜嫩叶部分煮熟或蒸熟后,磨碎、过滤。 2、取1中10-20克与少许水至锅中,边搅边煮。 3、快好时,加入牛奶以及由1/5-1/4小匙玉米粉用等量水调好的玉米粉水,继续加热搅拌煮成泥状即可。 乌龙面糊 材料:乌龙面——10克 水——1/2杯 蔬菜泥——少量 做法:1、乌龙面倒入沸水中煮至熟软捞起备用。 2、煮熟的乌龙面与水同时倒入小锅内捣烂,煮开。 3、起锅后加入少量蔬菜泥即可。 天门冬粥 天门冬味、微苦,性寒微滑,无毒,为中医补肾之药。天门冬与粳米合用成粥,滋阴除烦,生津止汗。午后低热,夜间盗汗及痰中带血的患儿食用2个疗程可见功效。3,5天为一疗程,两疗程之间要隔3天再服。 原料: 天门冬15,20克,粳米30,60克,冰糖适量。 制作: 将天门冬洗净,用水煮熬取汁,去渣,再将粳米洗净,放入天门冬汁内煮粥,在粥将熟时,加入冰糖,再用文火煮片刻,成粥即可。 特点: proof, Sun protection measures. Piling piling machinery, machinery,-proof, shock-otection CAP, explosion; Leakage protection meet the grade requirements. Check date 8 cylinder gas bottles are clearly marked, there was shock, prsheathed cable, length should not be less than 15m, may not withstand external force-good, shell the zero connection protection effective; Motor load lines shall be YHS waterproof rubberbar 50mm, shall not be located in the same room. Wooden long according to the design you want to ... An 5-ds for outdoor job settings. Check date 7 pump power cable insulationin sheable mechanical transmission parts randomly switches push button should be used; Neutral or ground meets the requirements, raed 30m, welder power supply be used moving boxes. Inspection date II serial number check check check 6 steel shields and relit exceng line, and well insulated, installed correctly, a power supply line length does not exceed 5M, two times the length does noice effectively; Reliable rain protection measures, protective covers to complete the access line and set a reasonable; Weldion devlding machine zero connection protection, leakage protection devices complete, secondary no load pressure or leakage protectitype ramming hand should be wrapped on insulating materials, the operator should wear insulating gloves. Inspection date 5 we-Frogprotection is good; Grinding stone electric overhead lines, the operator should wear insulated shoes, wear insulated gloves; s may not be damaged; Earth leakage protective device shall be mounted correctly and sensitive and effective and ground faultheld electric motor operated tools are complete and valid, and the rubber line-zero connection protection is good. Shield inspection date 4 hand-way push switches; Leakage protection sensitive effective ground-on parts guards firmly; Operations must be onesmissiInspection date 3 chain saws (circular saws), guard, safety devices and Crescent shield meets the requirements; Complete tranafety device; Leakage protection sensitive and effective, grounded or the zero connection protection meets the requirements. back s-e cover. For outdoor use, to shed rain operation; Plane blade with protective hand guard, rolling plane equipped with spring; Mortar machine handles application disc. Inspection date 2 wood (pressure) exposed part of the plane must have a protectivvalidee times; Hopper safety chains, hooks, and lever safety devices are complete and valid; Protective cover, cover complete and measures protection from transmission parts, clutches, brakes and other compliance, hopper wire rope must remain at least thr inageents, leakage protection is sensitive and reliable; Rain requires for operation shed meet, hanging for safe operation and draproject 1 mixer body with mortar installation smooth and solid, grounded or the zero connection protection meets the requirem 16 organization name project name Inspector serial number check check check the comments on the contents of the- - 8 - temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 粥烂微甜。 白扁豆瘦肉汤 白扁豆性微温,味甘,具有健脾化温之功,且含有蛋白质、脂肪、氨基酸、维生素A、维生素B1、维生素B5、维生素C及生物碱、糖内、钙、磷、铁等成分。此汤用于小儿脾虚泄泻、消化不良、暑湿泻下等症。 原料: 白扁豆50克,猪瘦肉100克,盐适量。 制作: 猪瘦肉洗净,用开水稍烫去血腥味,切成细末,然后放入锅内,加水适量,再加入白扁豆,用文火炖1小时,调味后即可食用。 特点: 豆烂肉香,可根据食者喜好进行调味,或咸或甜均可,喝汤吃肉、豆。 龙眼粥 龙眼肉性甘平,含有丰富的蛋白质和维生素类成分。中医认为龙眼肉“主五脏邪气,安志,久服强魂,聪明。”为补品中之上品,与大枣、粳米同食,起到安神定惊作用,可减轻小儿夜啼症。 原料: 龙眼肉10克,红枣3枚,粳米50克。 制作: 1、将龙眼肉、红枣、粳米洗净,同放在砂锅内,加入适量清水煮成粥,粥熟后用筷子夹出枣核、枣皮和龙眼肉渣,即可食用。 2、可适量加一些白糖,孩子会更喜欢吃。 特点: 粥稠米烂,微有甜味。 鸡肝糊 此菜含有丰富的蛋白质、钙、磷、铁、锌及维生素A、维生素B1、维生素B1和尼克酸等多种营养素。尤以含铁和维生素A较高,可防治贫血和维生素缺乏症,适宜4-6个月婴儿食用。 原料: 鸡肝15克,鸡架汤15克,酱油、蜂蜜各少许。 制作: 1、 将鸡肝放入水中煮,除去血后再换水煮10分钟,取出剥去鸡肝外皮,将肝放入碗内研碎。 2、 将鸡架汤放入锅内,加入研碎的鸡肝,煮成糊状,加入少许酱油和蜂蜜,搅匀即成。 特点: 味甜咸,呈糊状。 苹果泥 e staggered, long barl scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should bizontan m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for hortion design requirement, do not use bricks blocked up by construction organization design requirements, support height () whenstruc5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the cod easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.down material full 2 support material support column material: wood Rod application pine or FIR, shall not use-down, low-curity lowruction programme programme full, support system design calculation, and approval procedures complete, job Qian should for se6 serial number check project check requirements behave records results 1 const-test State observer records form template project name: construction site: construction: support materials: Ann 5-Engineering formwork supporting system self today this this this this cumulation Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) ar month day year month 2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day ye-5-round. 6 electric ... Project name: 5mounted on scaffolding or tree branch; Overhead lines required high enough off the g voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be-ing is strictly prohibited. 5 to set up lown heatibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsteighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohing wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lheld lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Light-tective casing. 4 spot lights handup proburied lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set revent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct to pto be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm line protection near power lines to have a reliable protectivetemporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage - 9 - temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 苹果泥含有丰富的矿物质和多种维生素。婴儿常吃苹果泥,可预防佝偻病。苹果泥具有健脾胃、补气血的功效,对婴儿的缺铁性贫血有较好的防治作用,对脾虚消化不良的婴儿也较为适宜,同时常食还可使皮肤细嫩红润。适于4-6个月婴儿食用。 原料: 苹果100克,凉开水适量。 制作: 1、 将苹果洗净去皮,然后用刮子或匙慢慢刮成泥状,即可喂食。 2、 或者将苹果洗净,去皮,切成黄豆大小的碎丁,加入凉开水适量,上笼蒸20-30分钟,待稍凉后即可喂食。 3、注意刮子或匙一定要洗净消毒。 特点: 泥香,易消化,美味可口。 红枣泥 大枣含有丰富的维生素C:尤以鲜枣含量最高:、优质蛋白质、游离氨基酸、脂肪、果糖、葡萄糖、胡萝卜素、维生素B1、维生素B2、尼克酸及矿物质等,具有健脾胃,养血益气等作用。婴儿常食可强健身体,有利于生长发育。 原料: 红枣100克,白糖20克,水适量。 制作: 1、 将红枣洗净,放人锅内,加清水煮15-20分钟,至烂熟。 2、 去掉红枣皮、核,加入白糖,调匀即可喂食。 3、 注意红枣在制作时要去净皮和核。 特点: 甜香可口,营养丰富。 菜泥 此菜营养丰富,有助于身体的生长、造血、通便,并保护皮肤粘膜。婴儿4个月可开始喂食,每次只给一种蔬菜泥,从1茶匙开始逐渐增加到6-8汤匙。 原料: 绿色蔬菜、胡萝卜、马铃薯、豌豆各少许。 制作: 1、 绿色蔬菜洗净切碎,加盐及少许水,加盖煮熟待凉,或加在蛋液内、粥里煮熟。 2、 胡萝卜、马铃薯、豌豆等洗净后,用少量的水煮熟,用汤匙刮取或压碎成泥,也可切碎,混在粥里喂食。 3、 注意制作时,必须将菜煮烂。 特点: proof, Sun protection measures. Piling piling machinery, machinery,-proof, shock-otection CAP, explosion; Leakage protection meet the grade requirements. Check date 8 cylinder gas bottles are clearly marked, there was shock, prsheathed cable, length should not be less than 15m, may not withstand external force-good, shell the zero connection protection effective; Motor load lines shall be YHS waterproof rubberbar 50mm, shall not be located in the same room. Wooden long according to the design you want to ... An 5-ds for outdoor job settings. Check date 7 pump power cable insulationin sheable mechanical transmission parts randomly switches push button should be used; Neutral or ground meets the requirements, raed 30m, welder power supply be used moving boxes. Inspection date II serial number check check check 6 steel shields and relit exceng line, and well insulated, installed correctly, a power supply line length does not exceed 5M, two times the length does noice effectively; Reliable rain protection measures, protective covers to complete the access line and set a reasonable; Weldion devlding machine zero connection protection, leakage protection devices complete, secondary no load pressure or leakage protectitype ramming hand should be wrapped on insulating materials, the operator should wear insulating gloves. Inspection date 5 we-Frogprotection is good; Grinding stone electric overhead lines, the operator should wear insulated shoes, wear insulated gloves; s may not be damaged; Earth leakage protective device shall be mounted correctly and sensitive and effective and ground faultheld electric motor operated tools are complete and valid, and the rubber line-zero connection protection is good. Shield inspection date 4 hand-way push switches; Leakage protection sensitive effective ground-on parts guards firmly; Operations must be onesmissiInspection date 3 chain saws (circular saws), guard, safety devices and Crescent shield meets the requirements; Complete tranafety device; Leakage protection sensitive and effective, grounded or the zero connection protection meets the requirements. back s-e cover. For outdoor use, to shed rain operation; Plane blade with protective hand guard, rolling plane equipped with spring; Mortar machine handles application disc. Inspection date 2 wood (pressure) exposed part of the plane must have a protectivvalidee times; Hopper safety chains, hooks, and lever safety devices are complete and valid; Protective cover, cover complete and measures protection from transmission parts, clutches, brakes and other compliance, hopper wire rope must remain at least thr inageents, leakage protection is sensitive and reliable; Rain requires for operation shed meet, hanging for safe operation and draproject 1 mixer body with mortar installation smooth and solid, grounded or the zero connection protection meets the requirem 16 organization name project name Inspector serial number check check check the comments on the contents of the- - 10 - temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 软烂,鲜香。 e staggered, long barl scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should bizontan m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for hortion design requirement, do not use bricks blocked up by construction organization design requirements, support height () whenstruc5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the cod easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.down material full 2 support material support column material: wood Rod application pine or FIR, shall not use-down, low-curity lowruction programme programme full, support system design calculation, and approval procedures complete, job Qian should for se6 serial number check project check requirements behave records results 1 const-test State observer records form template project name: construction site: construction: support materials: Ann 5-Engineering formwork supporting system self today this this this this cumulation Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) ar month day year month 2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day ye-5-round. 6 electric ... Project name: 5mounted on scaffolding or tree branch; Overhead lines required high enough off the g voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be-ing is strictly prohibited. 5 to set up lown heatibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsteighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohing wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lheld lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Light-tective casing. 4 spot lights handup proburied lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set revent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct to pto be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm line protection near power lines to have a reliable protectivetemporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage - 11 -
/
本文档为【婴儿食谱蛋黄泥】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索