为了正常的体验网站,请在浏览器设置里面开启Javascript功能!
首页 > 龙安视监控软件使用说明书

龙安视监控软件使用说明书

2018-02-19 50页 doc 476KB 65阅读

用户头像

is_079973

暂无简介

举报
龙安视监控软件使用说明书龙安视监控软件使用说明书 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the but...
龙安视监控软件使用说明书
龙安视监控软件使用 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 二零一一年版 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 目 录 一、欢迎使用龙安视数字监控系统…………………………………………2 二、服务器功能设置…………………………………………………………3 三、录像选项…………………………………………………………………4 四、录像质量…………………………………………………………………5 五、报警设置…………………………………………………………………6 六、设置自动工作计划………………………………………………………8 七、云台设置…………………………………………………………………9 八、网络认证…………………………………………………………………10 九、其它参数设置……………………………………………………………11 十、调色设置……………………………………………………………12 十一、录象回放………………………………………………………………13 h. 8, hoist: (1)boot good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum ainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have aproof sheds. (2) dr-and raint must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-pe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects madeion machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pivibratch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: swittruction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line cons-ctly, prohibit reverse switch operation sighe "black" or "green/Huang Shuangin th uminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable coretwo grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use altween lectrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance berubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding euse a le power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correr box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobinnectostic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located colding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plaprotection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "we phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable-singlehole outlets, top loading protector, using -phase three-switch, GFCI above to set a separate switch. (4) the box to separate singlee grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air ven to complete thVolt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the o- 1 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 一、欢迎使用龙安视数字监控系统 欢迎使用龙安视数字监控系统本龙安视数字监控系统(Lonse)集音视频数据实时采集与压缩、联动报警、辅助设备控制、网络远程控制等于一体,数据压缩采用H.264算法,整套系统具有运行速度快、占用资源少、声音与画质清晰、录像时间长、性能稳定、设置灵活、操作简便等特点,可广泛应用于银行、电力、学校、智能小区、医院、工厂、武警部队等绝大部分领域。 equipped with the proof body combat operations, and positive security rope fence. (2) must be-and rain-open pit operation should be set upary labor to maintain normal production. In order to ensure the quality of the workforce must have a certain number of techninecesse the amount of labor needed, restrict contracts through legal procedures, and measures to improve the treatment, ensure the y, need to focus on labor guarantee. We arrange production on this issue that, wherever possible, machinery in order to reducys/dae 45th day. This phase focuses on engineering subgrade earthwork, drainage, manhole in construction labor demand up to 880 daproject, total said today it will need 92,600. According to the construction schedule, peaked on the 15th day of labour to th ut thed according to the schedule of the project, preparation takes about 2,400 labor days, said today it will mop up to 2,100. Abotewater discharged into the sedimentation tank in the second ... BA, labor scheduling and measure 1, labour demand: calculateuce dust. 4.4 measures to prevent water pollution: 4.4.1 mixing wastewater discharge control: emissions of wassuch as open storage should be tightly covered, transportation and shipment to prevent the impurity of flying in order to red ice, commitment not to workerse notroject cost notification file indicates the spirit of, strictly implement the longest [document 2004]54 on the issuance of thplan to ensure. 2.4 resolutely implement State Council issued on effectively solving the problem of default on construction p rojecte project to the corporate services sector provides detailed workforce planning, corporate services sector according to the pence, strong expertise, extensive construction experience with similar projects personnel. 2.3 15 days before the start of thexperiayments. 2.2 Summary of project construction, project manager and department managers are chosen and construction management ablish oversight bodies: the monthly salary payments issued, so that every migrant worker can understand and monitor salary ps. Estrers team leaders sign, discovery team leader was not issued in full and on time wages of migrant workers, fined them 10 timers ' wages have signed terms of reward and punishment, each migrant worker payment salary cards, payment of wages by the laboworke ccording to report project progress allow workers ' wages per month and on time, never in arrears. And laborers team leaders,al guarantee: to establish a special fund for workers ' wages, project workers ' wages may not be appropriated for its use, ainancigned on the protection of workers ' wages with the owners responsibility, establishing guarantee system from top to bottom. Fstruction team, the teams and personal signature guarantee timely and full payment of wages of migrant workers undertaking sind concal workers. 2 2.1 establishment of workers ' wages, labor organizations and arrangements to ensure system: Project Manager a 2 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 二、服务器功能设置 龙安视数安监控系统软件主界面功能介绍 软件界面功能可以分工作状态功能、云台控制功能和设置功能三大部份组成。 1、 系统设置功能: 从左到右依次为:系统设置、录像回放、网络服务、现场拍照、音频开关、画面分格、 其它功能七个部份。 详细功能使用可参阅系统设置说明部分 2、用户登录:用户名admin 密码:1234 3、 工作状态部份: 以不同色彩来表示各功能下的状态,每项功能页表都包括了全开和全停按钮以方便用户使用。 1).系统时间显示: 2).预览开关:选中的通道显示为,未选中通道显示为 3).通道录像:为开启手动录像、关闭手动录像)。 4).报警状态:当有报警时对应的通道按钮会显示红色。 5).色彩调节:用户可根据现场实现环境来设置图像的亮度、对比度、色度、饱和度进行调节。 4、 云镜控制部份: 该功能区域应用于云台控制,包括了云台的基本功能以及高速球的巡航功能。 光圈:左边圈形按钮是放小光圈功能,右边为放大光圈功能。 变焦:左右两个为缩放功能按钮。 变倍:左右两个为变倍功能按钮。 雨刷:左右两个为开关功能按钮。 四方向控制和巡航功能按钮:用于控制云台针对四个方向转动的功能按h. 8, hoist: (1)boot good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum ainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have aproof sheds. (2) dr-and rain-pe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects madeion machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pivibratch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: swittruction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line cons-e "black" or "green/Huang Shuangin th uminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable coretwo grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use altween lectrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance berubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding euse a le power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, r box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobinnectostic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located colding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plaprotection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "we phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable-singlehole outlets, top loading protector, using -phase three-switch, GFCI above to set a separate switch. (4) the box to separate singlee grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air ven to complete thVolt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the o-t must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36ctly, prohibit reverse switch operation sighsecurity rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed corre 3 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 钮, 自动:启动该功能之后可以实现按原设定的方位自动转动云台。 三、录像选项 本软件录象选项可对OSD的显示属性进行修改: 录入通道名称:取消或显示通道名称 X坐标 Y坐标:修改通道名称在视频区域论中的显示坐标位置 测试:测试所设置(通道名称)坐标的显示位置 录入时间:设置时间是否在通道中显示 X坐标 Y坐标:修改时间在视频区域论中的显示坐标位置 测试:测试所设置(录入时间)坐标的显示位置 录入时间自动调亮: 通道名称:修改通道名称(支持中英文输入) 位置:更改通道号显示的位置(左下角、左上角、右下角、右上角)字体:更改通道号的字体 图像锐利程度: 默认值:恢复默认值 当前设置复制到...将当前设置信息复制到所有通道。 equipped with the proof body combat operations, and positive security rope fence. (2) must be-and rain-open pit operation should be set upice, commitment not to workerse notroject cost notification file indicates the spirit of, strictly implement the longest [document 2004]54 on the issuance of thplan to ensure. 2.4 resolutely implement State Council issued on effectively solving the problem of default on construction p rojecte project to the corporate services sector provides detailed workforce planning, corporate services sector according to the pence, strong expertise, extensive construction experience with similar projects personnel. 2.3 15 days before the start of thexperie 45th day. This phase focuses on engineering subgrade earthwork, drainage, manhole in construction labor demand up to 880 daayments. 2.2 Summary of project construction, project manager and department managers are chosen and construction management ablish oversight bodies: the monthly salary payments issued, so that every migrant worker can understand and monitor salary ps. Estrers team leaders sign, discovery team leader was not issued in full and on time wages of migrant workers, fined them 10 timers ' wages have signed terms of reward and punishment, each migrant worker payment salary cards, payment of wages by the laboworke ccording to report project progress allow workers ' wages per month and on time, never in arrears. And laborers team leaders,al guarantee: to establish a special fund for workers ' wages, project workers ' wages may not be appropriated for its use, ainanciproject, total said today it will need 92,600. According to the construction schedule, peaked on the 15th day of labour to thgned on the protection of workers ' wages with the owners responsibility, establishing guarantee system from top to bottom. Fstruction team, the teams and personal signature guarantee timely and full payment of wages of migrant workers undertaking sind concal workers. 2 2.1 establishment of workers ' wages, labor organizations and arrangements to ensure system: Project Manager aary labor to maintain normal production. In order to ensure the quality of the workforce must have a certain number of techninecesse the amount of labor needed, restrict contracts through legal procedures, and measures to improve the treatment, ensure the y, need to focus on labor guarantee. We arrange production on this issue that, wherever possible, machinery in order to reducys/da ut thed according to the schedule of the project, preparation takes about 2,400 labor days, said today it will mop up to 2,100. Abotewater discharged into the sedimentation tank in the second ... BA, labor scheduling and measure 1, labour demand: calculateuce dust. 4.4 measures to prevent water pollution: 4.4.1 mixing wastewater discharge control: emissions of wassuch as open storage should be tightly covered, transportation and shipment to prevent the impurity of flying in order to red 4 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 四、录像质量 本监控软件中,音视频码流主要涉及两个方面——录象质量和网传图象质量。视频板卡对视频流采集的时候,同时采集高码流文件和低码流文件。低码流文件用于无卡编辑调用,高码流文件输出时根据EDL表调用。这一高一低两种码流即双码流。 本软件录象可自动调节各种录象模式,只需用户进行简单的设置就可以根据用户的所提供的数值进行 最佳画面调节,无需进行繁杂的模式选择 用户通过操作[录像帧数](建议不要低于6 帧)的调节和[录象质量]调节录像质量,也可以在[自定义录像质量]打对号后进行精确调节 录像文件打包时间间隔:设定每经过多长时间后录像就打包成一个文件 用户可以自己设定录像文件存放的路径:如果设定包含两个及两个以上盘符时,当第一个盘符空间已满会自动将视频录像转向下一个盘符,以此类推,如果录像占满所有的存储空间就会自动删除最早的录像纪录。然后保存,选择确定退出 当前设置复制到……:如选中通道前的对号,即使得选中通道与当前所设定的通道执行一样的录像模式,点击确定退出。 网络传输: 编码质量:可设置为六级到十一,默认为九级 帧率:可设置为1-30帧/秒,默认为5帧/秒 用户可根据自己实际网络带宽,自行优化配置。 h. 8, hoist: (1)boot good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum ainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have aproof sheds. (2) dr-and rain-pe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects madeion machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pivibratch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: swittruction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line cons-e "black" or "green/Huang Shuangin th uminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable coretwo grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use altween lectrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance berubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding euse a le power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, r box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobinnectostic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located colding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plaprotection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "we phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable-singlehole outlets, top loading protector, using -phase three-switch, GFCI above to set a separate switch. (4) the box to separate singlee grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air ven to complete thVolt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the o-t must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36ctly, prohibit reverse switch operation sighsecurity rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed corre 5 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 传统视频采集卡和软件只能够处理一种码流,即录象的音视频流与网传的音视频流保持一致,最直观的体现就是用户通过网络远程得到的音视频的清晰度、保真度与回放本地录象时获得的音视频的清晰度、保真度一致。 当客户需要通过网络同时监控多个通道的音视频信息时,发现对客户端的软解码要求较高,CPU、内存等资源消耗的比较多。为了达到在有限的资源条件下,同时监控多路(如>16路)音视频通道,双码流功能能有效的解决网络传输帧率问题。 五、报警设置 本软件报警设置简单操作,勿需用户进行繁杂的设置就能达到预期效果,且反应灵敏,能做到实时侦测与报警。 基本设置:可以选择所想要进行的侦测类型以及感应等级?其中超级为敏感度最高级别(注:本软件的默认设置已经为用户调节到最佳等级)。 报警联动:可以选择所要进行的报警类型,通过点击载入声音文件(.wav格式),点击检测是否载入声音文件,如有声音文件播放,则表示成功载入。 报警持续时间和录像延时用户可以根据需求自行设置。当前设置复制到……:同其他版面的功能一样。 侦测区域:默认值为所选中通道的整个显示区域,用户可以点击清除本通道侦测区域按钮从新 任意的圈定锁要侦测的区域(折顶见该面版)。当前设置复制到……:与前面改功能一样。然后保存,选择确定退出。 equipped with the proof body combat operations, and positive security rope fence. (2) must be-and rain-open pit operation should be set upice, commitment not to workersablish oversight bodies: the monthly salary payments issued, so that every migrant worker can understand and monitor salary pe nots. Estroject cost notification file indicates the spirit of, strictly implement the longest [document 2004]54 on the issuance of thplan to ensure. 2.4 resolutely implement State Council issued on effectively solving the problem of default on construction p rojecte project to the corporate services sector provides detailed workforce planning, corporate services sector according to the pence, strong expertise, extensive construction experience with similar projects personnel. 2.3 15 days before the start of thexperirers team leaders sign, discovery team leader was not issued in full and on time wages of migrant workers, fined them 10 timeayments. 2.2 Summary of project construction, project manager and department managers are chosen and construction management rs ' wages have signed terms of reward and punishment, each migrant worker payment salary cards, payment of wages by the laboworke ccording to report project progress allow workers ' wages per month and on time, never in arrears. And laborers team leaders,al guarantee: to establish a special fund for workers ' wages, project workers ' wages may not be appropriated for its use, ainancigned on the protection of workers ' wages with the owners responsibility, establishing guarantee system from top to bottom. Fstruction team, the teams and personal signature guarantee timely and full payment of wages of migrant workers undertaking sind concal workers. 2 2.1 establishment of workers ' wages, labor organizations and arrangements to ensure system: Project Manager aary labor to maintain normal production. In order to ensure the quality of the workforce must have a certain number of techninecesse the amount of labor needed, restrict contracts through legal procedures, and measures to improve the treatment, ensure the y, need to focus on labor guarantee. We arrange production on this issue that, wherever possible, machinery in order to reducys/dae 45th day. This phase focuses on engineering subgrade earthwork, drainage, manhole in construction labor demand up to 880 daproject, total said today it will need 92,600. According to the construction schedule, peaked on the 15th day of labour to th ut thed according to the schedule of the project, preparation takes about 2,400 labor days, said today it will mop up to 2,100. Abotewater discharged into the sedimentation tank in the second ... BA, labor scheduling and measure 1, labour demand: calculateuce dust. 4.4 measures to prevent water pollution: 4.4.1 mixing wastewater discharge control: emissions of wassuch as open storage should be tightly covered, transportation and shipment to prevent the impurity of flying in order to red 6 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 侦测区域:默认值为所选中通道的整个显示区域,用户可以点击清除本通道侦测区域按钮从新任意的圈定锁要侦测的区域(折顶方法见该面版)。当前设置复制到……:与前面改功能一样。然后保存,选择确定退出。 联动区域:选中的通道将会在设定的侦测通道发生变化时进行联动录像。例如:下图的设定侦测通道为 5,联动录像通道为 3,4和5,当通道5(假设设定的为移动侦测)所设定的区域有物体移 动时,则通道 3,4 和 5 同时会进行录像。然后保存,选择确定退出 h. 8, hoist: (1)boot good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum ainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have aproof sheds. (2) dr-and rainctly, prohibit reverse switch operation sigh-pe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects madeion machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pivibratch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: swittruction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line cons-security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed corree "black" or "green/Huang Shuangin th uminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable coretwo grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use altween lectrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance berubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding euse a le power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, r box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobinnectostic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located colding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plaprotection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "we phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable-singlehole outlets, top loading protector, using -phase three-switch, GFCI above to set a separate switch. (4) the box to separate singlee grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air ven to complete thVolt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the o-t must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36 7 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 六、设置自动工作计划 当设备处于无人职守状态,希望系统根据预先设定的工作计划进行工作时,可通过设置[自动工作计划]来实现整个系统的运作。 首先介绍几种基本工作类型: 序号 工作类型 注释说明 1 定时录像 只执行录像功能,不进行报警布/撤防 2 移动侦测 物体运动触发报警录象 有物体运动触发时执行移动录象,无触发执行定时录像功3 移动侦测+定时录像 能 方法:选中通道,点击添加时间段,如需修改和删除,需先选中时间段(如上蓝色即为选中)后点击修改时间段或删除时间段按钮进行更改。 该日设置复制到……将当前通道该日设置信息复制到所有工作日 当前设置复制…… 将该通道的设置信息复制到其它通道 设置完毕以后只需要钩选【启用自动工作模式】即可启动自动工作状态,然后保存,选择确定退出。 七、云台设置 equipped with the proof body combat operations, and positive security rope fence. (2) must be-and rain-open pit operation should be set upice, commitment not to workersys/dae note 45th day. This phase focuses on engineering subgrade earthwork, drainage, manhole in construction labor demand up to 880 daroject cost notification file indicates the spirit of, strictly implement the longest [document 2004]54 on the issuance of thplan to ensure. 2.4 resolutely implement State Council issued on effectively solving the problem of default on construction p rojecte project to the corporate services sector provides detailed workforce planning, corporate services sector according to the pence, strong expertise, extensive construction experience with similar projects personnel. 2.3 15 days before the start of thexperiproject, total said today it will need 92,600. According to the construction schedule, peaked on the 15th day of labour to thayments. 2.2 Summary of project construction, project manager and department managers are chosen and construction management ablish oversight bodies: the monthly salary payments issued, so that every migrant worker can understand and monitor salary ps. Estrers team leaders sign, discovery team leader was not issued in full and on time wages of migrant workers, fined them 10 timers ' wages have signed terms of reward and punishment, each migrant worker payment salary cards, payment of wages by the laboworke ccording to report project progress allow workers ' wages per month and on time, never in arrears. And laborers team leaders, al guarantee: to establish a special fund for workers ' wages, project workers ' wages may not be appropriated for its use, ainancigned on the protection of workers ' wages with the owners responsibility, establishing guarantee system from top to bottom. Fstruction team, the teams and personal signature guarantee timely and full payment of wages of migrant workers undertaking sind concal workers. 2 2.1 establishment of workers ' wages, labor organizations and arrangements to ensure system: Project Manager aary labor to maintain normal production. In order to ensure the quality of the workforce must have a certain number of techninecesse the amount of labor needed, restrict contracts through legal procedures, and measures to improve the treatment, ensure the ut they, need to focus on labor guarantee. We arrange production on this issue that, wherever possible, machinery in order to reducd according to the schedule of the project, preparation takes about 2,400 labor days, said today it will mop up to 2,100. Abotewater discharged into the sedimentation tank in the second ... BA, labor scheduling and measure 1, labour demand: calculateuce dust. 4.4 measures to prevent water pollution: 4.4.1 mixing wastewater discharge control: emissions of wassuch as open storage should be tightly covered, transportation and shipment to prevent the impurity of flying in order to red 8 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 设置 设置云台协议过程中,首先确认所选设备所使用的正确协议,配套波特率,所连接电脑的串口号,云台解码器地址。在确认以上信息之后就可以设置了。其中通道指的是视频通道,就是云台所代表的通道。 一般用户只需要对协议、波特率、串口、地址码、进行配置即可。 【协议】为对应云台解码器上设置的通信协议,默认为Pelco-D,常用的为Pelco-D、Pelco-P,对于高速球,一般使用Pelco-P扩展或者Pelco-D扩展。 【波特率】根据所选择的协议不同而不同,一般地,Pelco-D协议使用2400的波特率,Pelco-P使用9600的波特率,Pelco-P扩展使用4800的波特率。具体请根据解码器厂家说明书进行设置。 【串口】一般为COM1。 【地址码】为对应云台解码器上设置的识别地址,每个解码器都应设置有一个识别地址,该地址一般从1到255。关于云台解码器的详细设置,请参照此解码器的说明书,或者直接联系此解码器的厂家技术支持。 如想取消某中协议只需选中改协议进行修改至状态--------即可,该行后面的值将无效。 八、网络认证 h. 8, hoist: (1)boot good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum ainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have aproof sheds. (2) dr-and rain-pe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects madeion machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pivibratch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: swittruction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line cons-e "black" or "green/Huang Shuangin th uminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable coretwo grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use altween lectrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance berubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding euse a le power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, r box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobinnectostic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located colding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plaprotection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "we phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable-singlehole outlets, top loading protector, using -phase three-switch, GFCI above to set a separate switch. (4) the box to separate singlee grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air ven to complete thVolt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the o-t must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36ctly, prohibit reverse switch operation sighsecurity rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed corre 9 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 当多个用户通过网络(局域网或者广域网)来远程监控前端主机时,为了防止恶意的破坏我们需要对网络用户进行权限分级。 网络用户认证:用户通过[添加网络用户][修改IP]和[删除IP] 允许设定的地址可以访问,并限制访问权限,屏蔽掉不安全通道,不允许时可以在所设定IP地址前方框划上对号。 IP地址屏蔽:把认为危险的IP地址进行屏蔽,增加安全性。 equipped with the proof body combat operations, and positive security rope fence. (2) must be-and rain-open pit operation should be set upice, commitment not to workersstruction team, the teams and personal signature guarantee timely and full payment of wages of migrant workers undertaking sie notnd conroject cost notification file indicates the spirit of, strictly implement the longest [document 2004]54 on the issuance of thplan to ensure. 2.4 resolutely implement State Council issued on effectively solving the problem of default on construction p rojecte project to the corporate services sector provides detailed workforce planning, corporate services sector according to the pence, strong expertise, extensive construction experience with similar projects personnel. 2.3 15 days before the start of thexperical workers. 2 2.1 establishment of workers ' wages, labor organizations and arrangements to ensure system: Project Manager aayments. 2.2 Summary of project construction, project manager and department managers are chosen and construction management ablish oversight bodies: the monthly salary payments issued, so that every migrant worker can understand and monitor salary ps. Estrers team leaders sign, discovery team leader was not issued in full and on time wages of migrant workers, fined them 10 timers ' wages have signed terms of reward and punishment, each migrant worker payment salary cards, payment of wages by the laboworke ccording to report project progress allow workers ' wages per month and on time, never in arrears. And laborers team leaders,ary labor to maintain normal production. In order to ensure the quality of the workforce must have a certain number of technial guarantee: to establish a special fund for workers ' wages, project workers ' wages may not be appropriated for its use, ainancigned on the protection of workers ' wages with the owners responsibility, establishing guarantee system from top to bottom. Fnecesse the amount of labor needed, restrict contracts through legal procedures, and measures to improve the treatment, ensure the y, need to focus on labor guarantee. We arrange production on this issue that, wherever possible, machinery in order to reducys/dae 45th day. This phase focuses on engineering subgrade earthwork, drainage, manhole in construction labor demand up to 880 daproject, total said today it will need 92,600. According to the construction schedule, peaked on the 15th day of labour to th ut thed according to the schedule of the project, preparation takes about 2,400 labor days, said today it will mop up to 2,100. Abotewater discharged into the sedimentation tank in the second ... BA, labor scheduling and measure 1, labour demand: calculateuce dust. 4.4 measures to prevent water pollution: 4.4.1 mixing wastewater discharge control: emissions of wassuch as open storage should be tightly covered, transportation and shipment to prevent the impurity of flying in order to red 10 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 九、其它参数设置 进到【本地设置】-【其它】 设置里如图: 【锁定系统键码】 屏蔽系统热键,该功能是为了防止非法人员利用操作系统的功能特性而对监控软件进行非法修改,未选中的情况下可以用该功能组合键进入切换出监控软件或调出进程管理而达到非法修改的目的。 【启动时需要手动登录】设置软件启动是否需要输入密码, 【启动后立即最小化】 设置软件启动是否最小化 【开机自动运行】设置系统是不否开机随系统自动运行 【自动关机】您可以在自定义的时间范围内设置计算机的自动关机功能,时间精确到每分。满足客户个性化需求。 【自动重启】您可以在自定义的时间范围内设置计算机的自动重起功能,时间精确到每分。该功能可以有效的预防由于计算机资源不足时可能导致的异常错误,以便监控系统软件正常运行。 【鼠标无动作】该功能是指,当用户长时间没有对监控系统软件进行任何点击操作时,监控系统软件将自动进行自我加锁。当然密码是用户自己登录时所用的密码,用户只需重新解锁即可重新对监控系统软件进行操作。 您可以在勾选框之后填上自定义的时间长度。比如10分钟/30分钟,以分为单位。 【硬盘录满提示】当录像文件在硬盘上存储,占满硬盘后,将对用户提示硬盘录满。 【串口操作方式】默认为瞬间打开,一般不需对其进行设置,只有当云镜控制异常时,可切换到一直打开方式。 【显示模示】:针对不同的显卡,可能出现图像不异常情况,可设置不同的显示模式来来达到一个最佳的显示效果。 h. 8, hoist: (1)boot good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum ainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have aproof sheds. (2) dr-and rain-pe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects madeion machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pivibratch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: swittruction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line cons-e "black" or "green/Huang Shuangin th uminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable coretwo grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use altween lectrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance berubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding euse a le power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, r box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobinnectostic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located colding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plaprotection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "we phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable-singlehole outlets, top loading protector, using -phase three-switch, GFCI above to set a separate switch. (4) the box to separate singlee grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air ven to complete thVolt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the o-t must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36ctly, prohibit reverse switch operation sighsecurity rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed corre 11 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 有五种显示模式:分别是:dma2overlay、dma2offscreen、blt2primary、blt_rgb、rgb推荐客户使用前二种显示模式。 十、调色方案设置 ?对于部分场合,由于光线变化较大,或者摄象机引起的图象明暗变化比较规律的情况下,通过手动调整色彩参数,能够弥补光线变化而带来的图象清晰度不足。 其中每个调整点都将按照预设进行视频参数调整,如果需要恢复默认值,请设定一个还原点(调整点)。设置界面如上图。 十一、录象回放 equipped with the proof body combat operations, and positive security rope fence. (2) must be-and rain-open pit operation should be set upice, commitment not to workersinancie notgned on the protection of workers ' wages with the owners responsibility, establishing guarantee system from top to bottom. Froject cost notification file indicates the spirit of, strictly implement the longest [document 2004]54 on the issuance of thplan to ensure. 2.4 resolutely implement State Council issued on effectively solving the problem of default on construction p rojecte project to the corporate services sector provides detailed workforce planning, corporate services sector according to the pence, strong expertise, extensive construction experience with similar projects personnel. 2.3 15 days before the start of thexperistruction team, the teams and personal signature guarantee timely and full payment of wages of migrant workers undertaking siayments. 2.2 Summary of project construction, project manager and department managers are chosen and construction management ablish oversight bodies: the monthly salary payments issued, so that every migrant worker can understand and monitor salary ps. Estrers team leaders sign, discovery team leader was not issued in full and on time wages of migrant workers, fined them 10 timers ' wages have signed terms of reward and punishment, each migrant worker payment salary cards, payment of wages by the laboworke ccording to report project progress allow workers ' wages per month and on time, never in arrears. And laborers team leaders,nd conal guarantee: to establish a special fund for workers ' wages, project workers ' wages may not be appropriated for its use, acal workers. 2 2.1 establishment of workers ' wages, labor organizations and arrangements to ensure system: Project Manager aary labor to maintain normal production. In order to ensure the quality of the workforce must have a certain number of techninecesse the amount of labor needed, restrict contracts through legal procedures, and measures to improve the treatment, ensure the y, need to focus on labor guarantee. We arrange production on this issue that, wherever possible, machinery in order to reducys/dae 45th day. This phase focuses on engineering subgrade earthwork, drainage, manhole in construction labor demand up to 880 daproject, total said today it will need 92,600. According to the construction schedule, peaked on the 15th day of labour to th ut thed according to the schedule of the project, preparation takes about 2,400 labor days, said today it will mop up to 2,100. Abotewater discharged into the sedimentation tank in the second ... BA, labor scheduling and measure 1, labour demand: calculateuce dust. 4.4 measures to prevent water pollution: 4.4.1 mixing wastewater discharge control: emissions of wassuch as open storage should be tightly covered, transportation and shipment to prevent the impurity of flying in order to red 12 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 视频监控系统一个十分重要的过程就是对录象的检索与回放。本系统采用了时间同步[时间进度条方式]回放模式与传统的文件列表回放模式相结合的方式,充分考虑到用户的操作要求和操作习惯。 日历系统可以更加直观的帮助用户调阅指定日期的录象数据,其中采用不同的色彩和符号来代表不同的内容: 日期显示为白色——无相关数据 日期显示为黄色——有音视频录象数据或有图片信息 日期显示带椭圆圈——当前日期 回放界面功能(按扭)简介——时间同步回放(如上图) ? 回放通道界面:最大支持同时回放32路图象。双击某一路通道可以只显示一路回放,在双击返回多路回放。 ? 日历系统:多种色彩和图形标志显示,提供不同的信息(见上)。 ? 时间定位系统:包括24小时定位(下)和 60 分钟定位(上);播放进段控制 等。 ?模式转换:点击按钮会放界面的左下部分将转变成下图,用户可以选中要回h. 8, hoist: (1)boot good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum ainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have aproof sheds. (2) dr-and rain--pe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects madeion machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pivibratch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: swittruction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line cons-t must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36e "black" or "green/Huang Shuangin th uminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable coretwo grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use altween lectrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance berubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding euse a le power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, ctly, prohibit reverse switch operation sighr box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobinnectostic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located colding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plaprotection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "we phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable-singlehole outlets, top loading protector, using -security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correphase three-switch, GFCI above to set a separate switch. (4) the box to separate singlee grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air ven to complete thVolt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the o 13 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 放的通道,在日历系统里选中要回放的日期,就可以看到该日的影像文件,选重要播放的文件点击播放 ?浏览抓帧:点击击弹出如下窗体,选中欲浏览图片通道和右边的抓帧日期,则下边立刻显示选中日期对应通道的图片,单击图片(如下图中蓝色区域是被选中图片)左边面版将会显示图片,在该窗体右上调节按钮进行下一张和上一张图片,也可以对所选中图片进行放缩,或者对该图片另存,打印等。 equipped with the proof body combat operations, and positive security rope fence. (2) must be-and rain-open pit operation should be set upary labor to maintain normal production. In order to ensure the quality of the workforce must have a certain number of techninecesse the amount of labor needed, restrict contracts through legal procedures, and measures to improve the treatment, ensure the y, need to focus on labor guarantee. We arrange production on this issue that, wherever possible, machinery in order to reducys/dae 45th day. This phase focuses on engineering subgrade earthwork, drainage, manhole in construction labor demand up to 880 daproject, total said today it will need 92,600. According to the construction schedule, peaked on the 15th day of labour to th ut thed according to the schedule of the project, preparation takes about 2,400 labor days, said today it will mop up to 2,100. Abotewater discharged into the sedimentation tank in the second ... BA, labor scheduling and measure 1, labour demand: calculateuce dust. 4.4 measures to prevent water pollution: 4.4.1 mixing wastewater discharge control: emissions of wassuch as open storage should be tightly covered, transportation and shipment to prevent the impurity of flying in order to red ice, commitment not to workerse notroject cost notification file indicates the spirit of, strictly implement the longest [document 2004]54 on the issuance of thplan to ensure. 2.4 resolutely implement State Council issued on effectively solving the problem of default on construction p rojecte project to the corporate services sector provides detailed workforce planning, corporate services sector according to the pence, strong expertise, extensive construction experience with similar projects personnel. 2.3 15 days before the start of thexperiayments. 2.2 Summary of project construction, project manager and department managers are chosen and construction management ablish oversight bodies: the monthly salary payments issued, so that every migrant worker can understand and monitor salary ps. Estrers team leaders sign, discovery team leader was not issued in full and on time wages of migrant workers, fined them 10 timers ' wages have signed terms of reward and punishment, each migrant worker payment salary cards, payment of wages by the laboworke ccording to report project progress allow workers ' wages per month and on time, never in arrears. And laborers team leaders,al guarantee: to establish a special fund for workers ' wages, project workers ' wages may not be appropriated for its use, ainancigned on the protection of workers ' wages with the owners responsibility, establishing guarantee system from top to bottom. Fstruction team, the teams and personal signature guarantee timely and full payment of wages of migrant workers undertaking sind concal workers. 2 2.1 establishment of workers ' wages, labor organizations and arrangements to ensure system: Project Manager a 14
/
本文档为【龙安视监控软件使用说明书】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索