为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

BPS 北京卓建国际建筑设计有限公司

2018-04-25 25页 doc 358KB 17阅读

用户头像

is_014457

暂无简介

举报
BPS 北京卓建国际建筑设计有限公司BPS 北京卓建国际建筑设计有限公司 Jason.Zhu Jiansong Germany BSP Architects & Engineer Beijing Zhoujian International Architects & Engineers Limited General Manager Professor Architect,Doctor National Class A Registing Architect National Class A Registing Constructor 朱建松 德...
BPS 北京卓建国际建筑设计有限公司
BPS 北京卓建国际建筑设计有限公司 Jason.Zhu Jiansong Germany BSP Architects & Engineer Beijing Zhoujian International Architects & Engineers Limited General Manager Professor Architect,Doctor National Class A Registing Architect National Class A Registing Constructor 朱建松 德国BSP建筑设计事务所 北京卓建国际建筑设计有限公司 执行董事兼总经理 教授级高级建筑师、博士 国家一级注册建筑师 国家一级注册建造师 德国建筑师协会会员 法国设计师协会会员 position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ? 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ? 0.02mm, parallel degree deviation of ? 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturer's mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along Martin Burzin Germany BSP Architects & Engineer Founder Germany Registing Architect,Doctor 马丁.布尔钦 德国BSP建筑设计事务所 创始人 德国注册建筑师、博士 Schmid-Burgk Germany BSP Architects & Engineer Partner Germany Registing Architect,Doctor 希密特.布尔克 德国BSP建筑设计事务所 合伙人 德国注册建筑师、博士 Afred Sommer Germany BSP Architects & Engineer Partner Germany Registing Architect,Doctor 阿弗瑞德.索曼 德国BSP建筑设计事务所 合伙人 德国注册建筑师、博士 position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ? 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ? 0.02mm, parallel degree deviation of ? 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturer's mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along Sissy, Huang Suqian Germany BSP Architects & Engineer Limited Beijing Zhoujian International Architects & Engineers Limited Vice Manager Senior Architect National Class A Registing Constructor 黄苏茜 德国BSP建筑设计事务所 北京卓建国际建筑设计有限公司 董事、副总经理 高级建筑师 国家一级注册建造师 Chen Xiaohong Germany BSP Architects & Engineer Limited Beijing Zhoujian International Architects & Engineers Limited General Architect. Senior Architect National Class A Registing Architect National Registing Urban Planner 陈晓红 德国BSP建筑设计事务所 北京卓建国际建筑设计有限公司 总建筑师、高级建筑师 国家一级注册建筑师 国家注册城市规划师 Lin Yuan Germany BSP Architects & Engineer Limited Beijing Zhoujian International Architects & Engineers Limited Senior Architect.Master America Registing Architect 林 媛 德国BSP建筑设计事务所 北京卓建国际建筑设计有限公司 高级建筑师、硕士 美国注册建筑师 position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ? 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ? 0.02mm, parallel degree deviation of ? 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturer's mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along 公司简介 德国BSP建筑设计事务所是一个国际性的建筑设计机构,在建筑设计、城市规划、室内设计与景观设计方面提供专业服务。 事务所成立于1981年,由具有长期伙伴关系的马丁.布尔钦、史密克.布尔克和阿弗瑞德.索曼合伙主持。总部设在德国巴伐利亚州慕尼黑福莱辛格市,长期的实践工作使事务所积累了丰富的设计经验,设计成果遍及多瑙河、莱茵河及易北河畔,慕尼黑奥林匹克体育中心、德累斯顿国际机场及汉堡海滨城区流淌着设计师辛勤工作的汗水,严谨的工作作风及近乎完美的设计风格将德意志大地打理得井井有条,整洁有序。 2002年6月德国BSP建筑设计事务所在中国香港成立具有完全法人资格的德国BSP建筑设计事务所中国有限公司公司,2005年11月在北京成立了具有建设部颁发的建筑工程设计甲级资质的北京卓建国际建筑设计有限公司,利用德国在工程、环保、节能及生态方面的领先技术为中国大陆、香港、澳门、台湾及东南亚地区提供建筑设计、咨询及技术服务,得益于亚洲经济的快速发展,短短几年内德国BSP建筑设计事务所在该地区完成项目策划、可研、项目设计、技术服务共计180多项,内容涉及酒店、写字楼、教学楼、医院、科技馆、博物馆、会议中心、公寓住宅、别墅、环境艺术等各方面, 其中有些项目已建成并已投入使用,业主普遍反映良好。 position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ? 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ? 0.02mm, parallel degree deviation of ? 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturer's mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along 对于BSP而言,一项建筑任务是一个需要考虑业主与使用者的社会行为、一个基于原创研究与持续思考的行为、一个对特定任务与地段做出回应的创造行为,一个必须对地域环境文化艺术负责任的行为。 BSP构思与把握着每项工程,他们周围凝集着多位项目总建筑师,每一位项目总建筑师都是设计研究、项目发展、工程管理或国际事务等方面的专业人士。在整个项目的设计过程中,从构思到发展深化的每个环节都在项目总建筑师的控制之下。 在所有工程实践中,无论是办公、工业、医疗设施、商业零售、休闲娱乐、教育或是住宅设计,BSP都致力于将革新的思想从一个领域传达到另一个领域,并检验它们的实用性。这些思想专注于空间的品质、功能的完善、改造项目中新建筑与老建筑之间的内在联系、在结构、建筑材料和环境控制方面最新技术的运用。 如今,BSP建筑设计事务所的作品遍及世界各地,包括中国、西班牙、意大利、英国、波兰、捷克、匈牙利、俄罗斯、澳大利亚和非洲国家。 德国巴伐利亚建筑师协会会员 法国设计师协会高级会员 建筑设计营业执照 建筑行业(建筑工程)设计甲级,证书编号:A111004083 建筑工程营业执照 建筑装修二级,证书编号:B2034011010923 position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ? 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ? 0.02mm, parallel degree deviation of ? 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturer's mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along 德国BSP建筑设计事务所 营业执照 质量管理体系认证证书 position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ? 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ? 0.02mm, parallel degree deviation of ? 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturer's mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ? 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ? 0.02mm, parallel degree deviation of ? 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturer's mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ? 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ? 0.02mm, parallel degree deviation of ? 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturer's mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ? 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ? 0.02mm, parallel degree deviation of ? 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturer's mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ? 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ? 0.02mm, parallel degree deviation of ? 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturer's mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ? 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ? 0.02mm, parallel degree deviation of ? 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturer's mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ? 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ? 0.02mm, parallel degree deviation of ? 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturer's mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along
/
本文档为【BPS 北京卓建国际建筑设计有限公司】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索