英文版 模拟量控制系统负荷变动试验导则英文版 模拟量控制系统负荷变动试验导则 Test Guide of Load Variation of Modulating Control System 1 Purpose To inspect the ability of the modulating control system of the assembling unit to be adaptable to the variation in load. 2 Conditions The assembling unit has already been at...
英文版 模拟量控制系统负荷变动试验导则
英文版 模拟量控制系统负荷变动试验导则 Test Guide of Load Variation of Modulating Control System 1 Purpose To inspect the ability of the modulating control system of the assembling unit to be adaptable to the variation in load. 2 Conditions The assembling unit has already been at the full load and had the ability for safe and stable operation through the on-load commissioning, the functions of the coordinated control system have already been put into operation through test, all the modulating control systems have been entered into their unattended operation, the adjustment quality can meet the "Quality Inspection and Evaluation Criteria for the Adjustment and Trial Operation of Thermal Power Engineering", and the test shall be conducted under the normal working conditions of 70%~100%MCR. 3 Variation Range of the Load The amplitude of the load variation in the load variation test is 15%MCR, and the actual variation rate of load is 3%MCR/min. 4 Recorded Main Parameters and Applied Instruments in the Test 4.1 Main parameters: Actual unit power, unit load command, main steam pressure, velocity-stage pressure, main steam temperature, reheat steam temperature, flow rate of boiler feed water, flow rate of main steam, water level in steam drum, oxygen content of fume, pressure of boiler chamber, aggregate coal supply quantity, water level of deaerator, water level of coagulator, and the water level of every heater. 4.2 Generally, for the data of every main parameter, the data and trend record are preceded by taking the transmitter for automatic control system through the decentralized control system or the certificated multiple-pen recorder. 5 Test Procedures 5.1 The automatic regulating loops of the following primary systems shall be operated gradually: Main steam pressure regulating system Boiler feedwater regulating system Main steam temperature regulating system Reheat steam temperature regulating system Boiler chamber pressure regulating system Air and oxygen supply quantity calibrating and regulating system 5.2 After the automatic control system of every loop works stably, the boiler-turbine coordination mode by the coordinated control system shall be carried out to calibrate the dynamic parameter. 5.3 The load variation test shall be carried out after the unit coordinated control operates stably. 5.3.1 The variation rate of load is set as 3%MCR/min. 5.3.2 The object load command of the unit shall be reduced in a step quantity of 15%MCR. The load response condition shall be observed, the unit load and the variation data in all the parameters shall be recorded. 5.3.3 After the unit load and operation parameters are stable, the object load command of the unit shall be increased in a step quantity of 15%MCR. The load response condition shall be observed, the unit load and the variation data in all the parameters shall be recorded. 6 Evaluation Criteria for Evaluation on the Load Variation Test of Modulating Control System Dynamic deviation during the load variation Static deviation during the load variation Controlled parameter process process Main steam pressure +/-0.6MPa +/-0.3MPa Main steam temperature +/-l0? +/-5? Reheat steam temperature +/-l0? +/-5? Water level in steam drum +/-60mm +/-30mm Pressure of boiler chamber +/-200Pa +/-100Pa Oxygen content of fume +/-2% +/-1% Water level of deaerator +/-250mm +/-100mm Water level of coagulator +/-200mm +/-100mm Water level of high pressure +/-70mm +/-35mm heater Water level of low pressure +/-70mm +/-35mm heater Actual power +/-3%MCR +/-1.5%MCR The criteria listed in the above table mainly are applicable to the home-made 300MW steam turbine-generator unit of the coal-fired drum boiler that is equipped with the direct-firing coal pulverizing system. As for the other types of units and the once-through boiler units, these listed criteria shall be adjusted appropriately depending on the physical circumstances. Division of Construction Coordination of the Ministry of Power Industry May, 1996
/
本文档为【英文版 模拟量控制系统负荷变动试验导则】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索