为了正常的体验网站,请在浏览器设置里面开启Javascript功能!
首页 > 非常搞笑的英语翻译

非常搞笑的英语翻译

2018-01-12 16页 doc 283KB 5阅读

用户头像

is_882336

暂无简介

举报
非常搞笑的英语翻译非常搞笑的英语翻译 很多人说起一些中式英语,常常令人啼笑皆非,下面是网友收集的一些经典的中式英语笑话,当然很多是杜撰的,看看你听说过几条? How are you ? How old are you? 怎么是你,怎么老是你, You have seed. I will give you some color to see see. Brothers~Together up! 你有种,我要给你点颜色瞧瞧,兄弟们,一起上~ Dragon born dragon, chicken born chicken, mouse"s...
非常搞笑的英语翻译
非常搞笑的英语翻译 很多人说起一些中式英语,常常令人啼笑皆非,下面是网友收集的一些经典的中式英语笑话,当然很多是杜撰的,看看你听说过几条? How are you ? How old are you? 怎么是你,怎么老是你, You have seed. I will give you some color to see see. Brothers~Together up! 你有种,我要给你点颜色瞧瞧,兄弟们,一起上~ Dragon born dragon, chicken born chicken, mouse"s son can make hole! 龙生龙,凤生凤,老鼠的儿子会打洞~ Chickens That Did Not Have Sexual Experience 童子鸡 You ask me,me ask who, 你问我,我问谁 Heart flower angry open. 心花怒放 Horse horse tiger tiger. 马马虎虎 Good good study, day day up. 好好学习,天天向上 No three no four. 不三不四 Know is know, noknow is noknow. 知之为知之,不知为不知 If you want money, I have no; if you want life, I have one! 要钱没有,要命一条 watch sister 妹 fire big 火大 the oil level to the normal oil level. (2) for the secondary prevention of the leakage of cooling water pipe fittings, valve parts before installation to check ... 4.2 measures to eliminate quality defects of cables cable laying in front of the cable construction, design, supervision and construction units to deliver the design, and drawing the third. Combined the engineering field to find fault, adding omitted items. Because the unit used computer DCS control and adds a great deal of control and signal cables. So you should carefully review, checks for missing physical cable, ready for construction and to verify cable length, specifications, familiar with the cable channel and the device location and bracket cable bracket on the section number. At the time of preparation of the inventory of cable, first of all, the professional carefully study electrical schematics, in accordance with the principle of accounting the cable path cable volume, the number of cores used, total volume and design inventory check cable to cable with and without omission, laying of the cable in order to ensure the process does not put a cable one cable. Finally, at the time of inventory, prepared to take the same path the cables together. Inventory preparation is completed, later in each enclosure affixed on both sides of each side of the cable you want to lay accurately verify cable lengths and set aside. Bridge should be combined, correcting errors, avoid straight, no cable bridge scaffolding used in the construction, not allowed to use electricity (fire) cutting, fix cable tray, cable tray is not allowed as a welding ground connection or cable tray cannot be used for other processes As far as you go to die. 有多远,死多远 We two who and who? 咱俩谁跟谁, people moumtain people sea 人山人海 但是最近我在海外华人论坛上看到流传一组照片,是外国人的英译中文,更加令人捧腹。有美国网友在搭乘皇家加勒比海(Royal Caribbean)邮轮出游时,发现邮轮上菜单的翻译十分搞笑。 这份菜单上有着多国语言的翻译,有网友说,这根本就是Google翻译再版,例如英式烟肉(English Bacon)被直译为“英语培根”,而全脂牛奶(Regular Milk)则被翻成“规则牛奶”,绿豆汤(Green Spilt Pea Soup)变成“绿分裂豌豆汤”。 the oil level to the normal oil level. (2) for the secondary prevention of the leakage of cooling water pipe fittings, valve parts before installation to check ... 4.2 measures to eliminate quality defects of cables cable laying in front of the cable construction, design, supervision and construction units to deliver the design, and drawing the third. Combined the engineering field to find fault, adding omitted items. Because the unit used computer DCS control and adds a great deal of control and signal cables. So you should carefully review, checks for missing physical cable, ready for construction and to verify cable length, specifications, familiar with the cable channel and the device location and bracket cable bracket on the section number. At the time of preparation of the inventory of cable, first of all, the professional carefully study electrical schematics, in accordance with the principle of accounting the cable path cable volume, the number of cores used, total volume and design inventory check cable to cable with and without omission, laying of the cable in order to ensure the process does not put a cable one cable. Finally, at the time of inventory, prepared to take the same path the cables together. Inventory preparation is completed, later in each enclosure affixed on both sides of each side of the cable you want to lay accurately verify cable lengths and set aside. Bridge should be combined, correcting errors, avoid straight, no cable bridge scaffolding used in the construction, not allowed to use electricity (fire) cutting, fix cable tray, cable tray is not allowed as a welding ground connection or cable tray cannot be used for other processes the oil level to the normal oil level. (2) for the secondary prevention of the leakage of cooling water pipe fittings, valve parts before installation to check ... 4.2 measures to eliminate quality defects of cables cable laying in front of the cable construction, design, supervision and construction units to deliver the design, and drawing the third. Combined the engineering field to find fault, adding omitted items. Because the unit used computer DCS control and adds a great deal of control and signal cables. So you should carefully review, checks for missing physical cable, ready for construction and to verify cable length, specifications, familiar with the cable channel and the device location and bracket cable bracket on the section number. At the time of preparation of the inventory of cable, first of all, the professional carefully study electrical schematics, in accordance with the principle of accounting the cable path cable volume, the number of cores used, total volume and design inventory check cable to cable with and without omission, laying of the cable in order to ensure the process does not put a cable one cable. Finally, at the time of inventory, prepared to take the same path the cables together. Inventory preparation is completed, later in each enclosure affixed on both sides of each side of the cable you want to lay accurately verify cable lengths and set aside. Bridge should be combined, correcting errors, avoid straight, no cable bridge scaffolding used in the construction, not allowed to use electricity (fire) cutting, fix cable tray, cable tray is not allowed as a welding ground connection or cable tray cannot be used for other processes the oil level to the normal oil level. (2) for the secondary prevention of the leakage of cooling water pipe fittings, valve parts before installation to check ... 4.2 measures to eliminate quality defects of cables cable laying in front of the cable construction, design, supervision and construction units to deliver the design, and drawing the third. Combined the engineering field to find fault, adding omitted items. Because the unit used computer DCS control and adds a great deal of control and signal cables. So you should carefully review, checks for missing physical cable, ready for construction and to verify cable length, specifications, familiar with the cable channel and the device location and bracket cable bracket on the section number. At the time of preparation of the inventory of cable, first of all, the professional carefully study electrical schematics, in accordance with the principle of accounting the cable path cable volume, the number of cores used, total volume and design inventory check cable to cable with and without omission, laying of the cable in order to ensure the process does not put a cable one cable. Finally, at the time of inventory, prepared to take the same path the cables together. Inventory preparation is completed, later in each enclosure affixed on both sides of each side of the cable you want to lay accurately verify cable lengths and set aside. Bridge should be combined, correcting errors, avoid straight, no cable bridge scaffolding used in the construction, not allowed to use electricity (fire) cutting, fix cable tray, cable tray is not allowed as a welding ground connection or cable tray cannot be used for other processes the oil level to the normal oil level. (2) for the secondary prevention of the leakage of cooling water pipe fittings, valve parts before installation to check ... 4.2 measures to eliminate quality defects of cables cable laying in front of the cable construction, design, supervision and construction units to deliver the design, and drawing the third. Combined the engineering field to find fault, adding omitted items. Because the unit used computer DCS control and adds a great deal of control and signal cables. So you should carefully review, checks for missing physical cable, ready for construction and to verify cable length, specifications, familiar with the cable channel and the device location and bracket cable bracket on the section number. At the time of preparation of the inventory of cable, first of all, the professional carefully study electrical schematics, in accordance with the principle of accounting the cable path cable volume, the number of cores used, total volume and design inventory check cable to cable with and without omission, laying of the cable in order to ensure the process does not put a cable one cable. Finally, at the time of inventory, prepared to take the same path the cables together. Inventory preparation is completed, later in each enclosure affixed on both sides of each side of the cable you want to lay accurately verify cable lengths and set aside. Bridge should be combined, correcting errors, avoid straight, no cable bridge scaffolding used in the construction, not allowed to use electricity (fire) cutting, fix cable tray, cable tray is not allowed as a welding ground connection or cable tray cannot be used for other processes the oil level to the normal oil level. (2) for the secondary prevention of the leakage of cooling water pipe fittings, valve parts before installation to check ... 4.2 measures to eliminate quality defects of cables cable laying in front of the cable construction, design, supervision and construction units to deliver the design, and drawing the third. Combined the engineering field to find fault, adding omitted items. Because the unit used computer DCS control and adds a great deal of control and signal cables. So you should carefully review, checks for missing physical cable, ready for construction and to verify cable length, specifications, familiar with the cable channel and the device location and bracket cable bracket on the section number. At the time of preparation of the inventory of cable, first of all, the professional carefully study electrical schematics, in accordance with the principle of accounting the cable path cable volume, the number of cores used, total volume and design inventory check cable to cable with and without omission, laying of the cable in order to ensure the process does not put a cable one cable. Finally, at the time of inventory, prepared to take the same path the cables together. Inventory preparation is completed, later in each enclosure affixed on both sides of each side of the cable you want to lay accurately verify cable lengths and set aside. Bridge should be combined, correcting errors, avoid straight, no cable bridge scaffolding used in the construction, not allowed to use electricity (fire) cutting, fix cable tray, cable tray is not allowed as a welding ground connection or cable tray cannot be used for other processes the oil level to the normal oil level. (2) for the secondary prevention of the leakage of cooling water pipe fittings, valve parts before installation to check ... 4.2 measures to eliminate quality defects of cables cable laying in front of the cable construction, design, supervision and construction units to deliver the design, and drawing the third. Combined the engineering field to find fault, adding omitted items. Because the unit used computer DCS control and adds a great deal of control and signal cables. So you should carefully review, checks for missing physical cable, ready for construction and to verify cable length, specifications, familiar with the cable channel and the device location and bracket cable bracket on the section number. At the time of preparation of the inventory of cable, first of all, the professional carefully study electrical schematics, in accordance with the principle of accounting the cable path cable volume, the number of cores used, total volume and design inventory check cable to cable with and without omission, laying of the cable in order to ensure the process does not put a cable one cable. Finally, at the time of inventory, prepared to take the same path the cables together. Inventory preparation is completed, later in each enclosure affixed on both sides of each side of the cable you want to lay accurately verify cable lengths and set aside. Bridge should be combined, correcting errors, avoid straight, no cable bridge scaffolding used in the construction, not allowed to use electricity (fire) cutting, fix cable tray, cable tray is not allowed as a welding ground connection or cable tray cannot be used for other processes 不仅如此,更夸张的还有,新鲜时令蔬菜(Garden Greens)竟然被翻译 成“花园成为绿色”,最离谱的就是,鸡肉磨菇挞(Chicken and Mushroom tart) 成了“胆小和迅速增长的妓女”,爆笑的翻译让内地网友们纷纷表示,“谁说只 有中国人乱翻英文,美国人翻译中文更给力!”。 the oil level to the normal oil level. (2) for the secondary prevention of the leakage of cooling water pipe fittings, valve parts before installation to check ... 4.2 measures to eliminate quality defects of cables cable laying in front of the cable construction, design, supervision and construction units to deliver the design, and drawing the third. Combined the engineering field to find fault, adding omitted items. Because the unit used computer DCS control and adds a great deal of control and signal cables. So you should carefully review, checks for missing physical cable, ready for construction and to verify cable length, specifications, familiar with the cable channel and the device location and bracket cable bracket on the section number. At the time of preparation of the inventory of cable, first of all, the professional carefully study electrical schematics, in accordance with the principle of accounting the cable path cable volume, the number of cores used, total volume and design inventory check cable to cable with and without omission, laying of the cable in order to ensure the process does not put a cable one cable. Finally, at the time of inventory, prepared to take the same path the cables together. Inventory preparation is completed, later in each enclosure affixed on both sides of each side of the cable you want to lay accurately verify cable lengths and set aside. Bridge should be combined, correcting errors, avoid straight, no cable bridge scaffolding used in the construction, not allowed to use electricity (fire) cutting, fix cable tray, cable tray is not allowed as a welding ground connection or cable tray cannot be used for other processes
/
本文档为【非常搞笑的英语翻译】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索