建设银行如何开通网上银行
首先感谢你观看这篇文章~
随着网络发展,我们的生活也进入了快节奏的时代,我们缴纳电费、水费、煤气费、网上购物、电子商务等等……都需要开通网上银行,这让我们在足不出户的情况下生活变的更有效率,那么我们就需要有一张开通了网上银行的银行卡~银行卡大家都有,那么如何开通网上银行呢,在这里我来一步步告诉大家,大家跟着操作就可以了~
自助开通网上银行介绍:
,建行信用卡用户可以通过网上自助申请开通后使用:除信用卡以外的用户需要去建行柜台进行签约:成为建行签约用户,
1、登录建行网站首页:点击个人客户登陆进入登录页面
protection measures or programmes. To prevent surface water from entering Excavation and trench to avoid slope collapse or destruction of soil. Section III, soft landscape construction schemes and technical measures soft landscape projects, delivery standards construction and acceptance should meet the current code for construction and acceptance of City Green (CJJ/T82-99), and urban landscaping and landscape plant materials (wood of Materia Medica) (CJ/T34-91), the relevant provisions. 1, site preparation and construction technical measures and leveling site preparation: planting soil 50cm all debris should be cleared, litter and not conducive to plant growth in the soil, timely removal of weeds in clean soil, large stones and so on. 20cm 30cm which cannot be more than diameter of surface soil stone; design requires terrain of the site, should be dealt with in strict accordance with the design requirements into the terrain. Site levelling: 30cm soil should be according to the requirements of soil, fertilization, added nutrition, leveling height differences less than 5cm per square metre, and should comply with the design requirements of the slope, keep the soil loose, ventilation and good permeability. Soil: the soil should be well drained soil is neutral and organic-rich soil, should not contain gravel or other toxic or inhibit growth of debris. Poor soils including strong acids, strong alkali soils and heavy clay, sandy and saline soils. Before planting the soil conditions should be checked, and in some key growing areas to ensure that environments must be to improve the soil. For planting soil and backfill, efficiency of fertilizer should be added, joining at least 5cm of humus in the soil. Containing construction waste and other harmful substances, Ph standard, saline soils and heavy clay, soil or soil improvement technology measures should be used. Planting soil: cultivation prior to planting in the region of
2、点击“开通网上银行服务”
3、阅读协议、填写个人基本资料、填写账户信息、设置网上银行密码
4、申请成功
protection measures or programmes. To prevent surface water from entering Excavation and trench to avoid slope collapse or destruction of soil. Section III, soft landscape construction schemes and technical measures soft landscape projects, delivery standards construction and acceptance should meet the current code for construction and acceptance of City Green (CJJ/T82-99), and urban landscaping and landscape plant materials (wood of Materia Medica) (CJ/T34-91), the relevant provisions. 1, site preparation and construction technical measures and leveling site preparation: planting soil 50cm all debris should be cleared, litter and not conducive to plant growth in the soil, timely removal of weeds in clean soil, large stones and so on. 20cm 30cm which cannot be more than diameter of surface soil stone; design requires terrain of the site, should be dealt with in strict accordance with the design requirements into the terrain. Site levelling: 30cm soil should be according to the requirements of soil, fertilization, added nutrition, leveling height differences less than 5cm per square metre, and should comply with the design requirements of the slope, keep the soil loose, ventilation and good permeability. Soil: the soil should be well drained soil is neutral and organic-rich soil, should not contain gravel or other toxic or inhibit growth of debris. Poor soils including strong acids, strong alkali soils and heavy clay, sandy and saline soils. Before planting the soil conditions should be checked, and in some key growing areas to ensure that environments must be to improve the soil. For planting soil and backfill, efficiency of fertilizer should be added, joining at least 5cm of humus in the soil. Containing construction waste and other harmful substances, Ph standard, saline soils and heavy clay, soil or soil improvement technology measures should be used. Planting soil: cultivation prior to planting in the region of
证书版开通介绍:
一、携带身份证件与银行卡,存折除外,:直接在银行柜台请工作人员帮助开通
网上银行:进行网银签约
二、激活已签约的网上银行
protection measures or programmes. To prevent surface water from entering Excavation and trench to avoid slope collapse or destruction of soil. Section III, soft landscape construction schemes and technical measures soft landscape projects, delivery standards construction and acceptance should meet the current code for construction and acceptance of City Green (CJJ/T82-99), and urban landscaping and landscape plant materials (wood of Materia Medica) (CJ/T34-91), the relevant provisions. 1, site preparation and construction technical measures and leveling site preparation: planting soil 50cm all debris should be cleared, litter and not conducive to plant growth in the soil, timely removal of weeds in clean soil, large stones and so on. 20cm 30cm which cannot be more than diameter of surface soil stone; design requires terrain of the site, should be dealt with in strict accordance with the design requirements into the terrain. Site levelling: 30cm soil should be according to the requirements of soil, fertilization, added nutrition, leveling height differences less than 5cm per square metre, and should comply with the design requirements of the slope, keep the soil loose, ventilation and good permeability. Soil: the soil should be well drained soil is neutral and organic-rich soil, should not contain gravel or other toxic or inhibit growth of debris. Poor soils including strong acids, strong alkali soils and heavy clay, sandy and saline soils. Before planting the soil conditions should be checked, and in some key growing areas to ensure that environments must be to improve the soil. For planting soil and backfill, efficiency of fertilizer should be added, joining at least 5cm of humus in the soil. Containing construction waste and other harmful substances, Ph standard, saline soils and heavy clay, soil or soil improvement technology measures should be used. Planting soil: cultivation prior to planting in the region of
1、登录建行网站首页:点击个人客户登陆就可以进入登录页面了:
2、设置网上银行交易密码
protection measures or programmes. To prevent surface water from entering Excavation and trench to avoid slope collapse or destruction of soil. Section III, soft landscape construction schemes and technical measures soft landscape projects, delivery standards construction and acceptance should meet the current code for construction and acceptance of City Green (CJJ/T82-99), and urban landscaping and landscape plant materials (wood of Materia Medica) (CJ/T34-91), the relevant provisions. 1, site preparation and construction technical measures and leveling site preparation: planting soil 50cm all debris should be cleared, litter and not conducive to plant growth in the soil, timely removal of weeds in clean soil, large stones and so on. 20cm 30cm which cannot be more than diameter of surface soil stone; design requires terrain of the site, should be dealt with in strict accordance with the design requirements into the terrain. Site levelling: 30cm soil should be according to the requirements of soil, fertilization, added nutrition, leveling height differences less than 5cm per square metre, and should comply with the design requirements of the slope, keep the soil loose, ventilation and good permeability. Soil: the soil should be well drained soil is neutral and organic-rich soil, should not contain gravel or other toxic or inhibit growth of debris. Poor soils including strong acids, strong alkali soils and heavy clay, sandy and saline soils. Before planting the soil conditions should be checked, and in some key growing areas to ensure that environments must be to improve the soil. For planting soil and backfill, efficiency of fertilizer should be added, joining at least 5cm of humus in the soil. Containing construction waste and other harmful substances, Ph standard, saline soils and heavy clay, soil or soil improvement technology measures should be used. Planting soil: cultivation prior to planting in the region of
3、下载证书
4、根据建行系统提示:一步步安装证书
点击“生成证书”
点击“是”
protection measures or programmes. To prevent surface water from entering Excavation and trench to avoid slope collapse or destruction of soil. Section III, soft landscape construction schemes and technical measures soft landscape projects, delivery standards construction and acceptance should meet the current code for construction and acceptance of City Green (CJJ/T82-99), and urban landscaping and landscape plant materials (wood of Materia Medica) (CJ/T34-91), the relevant provisions. 1, site preparation and construction technical measures and leveling site preparation: planting soil 50cm all debris should be cleared, litter and not conducive to plant growth in the soil, timely removal of weeds in clean soil, large stones and so on. 20cm 30cm which cannot be more than diameter of surface soil stone; design requires terrain of the site, should be dealt with in strict accordance with the design requirements into the terrain. Site levelling: 30cm soil should be according to the requirements of soil, fertilization, added nutrition, leveling height differences less than 5cm per square metre, and should comply with the design requirements of the slope, keep the soil loose, ventilation and good permeability. Soil: the soil should be well drained soil is neutral and organic-rich soil, should not contain gravel or other toxic or inhibit growth of debris. Poor soils including strong acids, strong alkali soils and heavy clay, sandy and saline soils. Before planting the soil conditions should be checked, and in some key growing areas to ensure that environments must be to improve the soil. For planting soil and backfill, efficiency of fertilizer should be added, joining at least 5cm of humus in the soil. Containing construction waste and other harmful substances, Ph standard, saline soils and heavy clay, soil or soil improvement technology measures should be used. Planting soil: cultivation prior to planting in the region of
继续点击“是”
继续点击“是”
您的证书安装成功喽,
protection measures or programmes. To prevent surface water from entering Excavation and trench to avoid slope collapse or destruction of soil. Section III, soft landscape construction schemes and technical measures soft landscape projects, delivery standards construction and acceptance should meet the current code for construction and acceptance of City Green (CJJ/T82-99), and urban landscaping and landscape plant materials (wood of Materia Medica) (CJ/T34-91), the relevant provisions. 1, site preparation and construction technical measures and leveling site preparation: planting soil 50cm all debris should be cleared, litter and not conducive to plant growth in the soil, timely removal of weeds in clean soil, large stones and so on. 20cm 30cm which cannot be more than diameter of surface soil stone; design requires terrain of the site, should be dealt with in strict accordance with the design requirements into the terrain. Site levelling: 30cm soil should be according to the requirements of soil, fertilization, added nutrition, leveling height differences less than 5cm per square metre, and should comply with the design requirements of the slope, keep the soil loose, ventilation and good permeability. Soil: the soil should be well drained soil is neutral and organic-rich soil, should not contain gravel or other toxic or inhibit growth of debris. Poor soils including strong acids, strong alkali soils and heavy clay, sandy and saline soils. Before planting the soil conditions should be checked, and in some key growing areas to ensure that environments must be to improve the soil. For planting soil and backfill, efficiency of fertilizer should be added, joining at least 5cm of humus in the soil. Containing construction waste and other harmful substances, Ph standard, saline soils and heavy clay, soil or soil improvement technology measures should be used. Planting soil: cultivation prior to planting in the region of
以上内容是否解决了您的问
呢, 如果还没有的话:立刻去 互帮互助 提问。
, 关联问题
o 建行如何开通网上支付功能
o 建行网上支付常见错误码解答
o 各大银行帮助中心
o 各大银行帮助中心
protection measures or programmes. To prevent surface water from entering Excavation and trench to avoid slope collapse or destruction of soil. Section III, soft landscape construction schemes and technical measures soft landscape projects, delivery standards construction and acceptance should meet the current code for construction and acceptance of City Green (CJJ/T82-99), and urban landscaping and landscape plant materials (wood of Materia Medica) (CJ/T34-91), the relevant provisions. 1, site preparation and construction technical measures and leveling site preparation: planting soil 50cm all debris should be cleared, litter and not conducive to plant growth in the soil, timely removal of weeds in clean soil, large stones and so on. 20cm 30cm which cannot be more than diameter of surface soil stone; design requires terrain of the site, should be dealt with in strict accordance with the design requirements into the terrain. Site levelling: 30cm soil should be according to the requirements of soil, fertilization, added nutrition, leveling height differences less than 5cm per square metre, and should comply with the design requirements of the slope, keep the soil loose, ventilation and good permeability. Soil: the soil should be well drained soil is neutral and organic-rich soil, should not contain gravel or other toxic or inhibit growth of debris. Poor soils including strong acids, strong alkali soils and heavy clay, sandy and saline soils. Before planting the soil conditions should be checked, and in some key growing areas to ensure that environments must be to improve the soil. For planting soil and backfill, efficiency of fertilizer should be added, joining at least 5cm of humus in the soil. Containing construction waste and other harmful substances, Ph standard, saline soils and heavy clay, soil or soil improvement technology measures should be used. Planting soil: cultivation prior to planting in the region of